540 N BRISTOL AVE 90049

Certificate Information: 540 N BRISTOL AVE 90049

Application / Permit
20014-30000-04371
Plan Check / Job No.
B20WL04367
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Addition of two out door trellises, interior renovation of existig living room (conversion to bar), new sliding doors, new gas outdoor fireplace BBQ, and fire pit, replac existing kitchen sink. Per engineering design.
Permit Issued
Issued on 7/30/2021
Issuing Office
Current Status
CofO Issued on 8/4/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/6/2020 APPLICANT
Assigned to Plan Check Engineer 10/9/2020 ALFREDO JARA
Corrections Issued 10/13/2020 ALFREDO JARA
Applicant returned to address corrections 1/6/2021 RICHARD GARCIA
Plan Check Approved 1/27/2021 ALFREDO JARA
Building Plans Picked Up 1/29/2021 APPLICANT
Issued 7/30/2021 APPLICANT
CofO in Progress 7/27/2022 ANDREW NAVE
Permit Finaled 8/4/2022 DANIEL ORRANTE
CofO Issued 8/4/2022 DANIEL ORRANTE
Permit Finaled 8/4/2022 DANIEL ORRANTE

Permit Application Clearance Information

Construction near power lines Cleared 10/26/2020 WALTER RAMIREZ
Roof/Waste drainage to street Cleared 12/15/2020 DINAH GARIN
Eng Process Fee Ord 176,300 Cleared 12/18/2020 DINAH GARIN
Grading Pre-Inspection Cleared 1/27/2021 ALFREDO JARA

Contact Information

Architect Radziner,, Ronald Mark; Lic. No.: C22228 MARMOL RADZINER & ASSOCIATES   12210 NEBRASKA AVE    LOS ANGELES, CA 90025
Contractor Tatum Construction Inc; Lic. No.: 733806-B 1909 CENTINELA AVENUE      SANTA MONICA, CA 90404
Engineer Messiha,, Hany Gamil; Lic. No.: C56766 19648 MULBERRY DR      WALNUT, CA 91789

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/17/2021 Approved JUAN VALENZUELA
Reinforced Masonry Frame 11/5/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 11/5/2021 SGSOV Not Ready GERMAN RODRIGUEZ MENDOZA
Reinforced Masonry Frame 11/10/2021 Partial Approval OGANES TARAKHCHYAN
ELECTRICAL-Rough 11/17/2021 Approved JUAN VALENZUELA
PLUMBING-Rough 11/29/2021 Corrections Issued STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 12/8/2021 Partial Approval JUAN VALENZUELA
Green Building Rough 12/8/2021 Not Ready for Inspection JUAN VALENZUELA
Insulation 12/10/2021 Partial Approval DEANDRE HOFFMAN
Insulation 12/14/2021 Approved OGANES TARAKHCHYAN
Drywall Nailing 12/16/2021 Approved JOHN KIDWELL
BUILDING-Rough-Frame 1/28/2022 Approved JOHN KIDWELL
Green Building Rough 1/28/2022 Approved JOHN KIDWELL
Drywall Nailing 2/4/2022 Approved JUAN VALENZUELA
Insulation 2/4/2022 Approved JUAN VALENZUELA
Interior/Exterior Lathing 2/4/2022 Approved JUAN VALENZUELA
Final 6/28/2022 Corrections Issued JUAN VALENZUELA
Green Building Final 6/28/2022 Approved JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 6/28/2022 SGSOV Not Ready JUAN VALENZUELA
Smoke Detectors 6/28/2022 Approved JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 7/7/2022 SGSOV Not Ready JUAN VALENZUELA
Pre-Inspection 7/13/2022 Partial Inspection JUAN VALENZUELA
Final 7/19/2022 Corrections Issued KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 7/19/2022 SGSOV Approved KEVIN SARGSYAN
Final 7/27/2022 OK to Issue CofO ANDREW NAVE