729 S SWEETZER AVE 90048

Certificate Information: 729 S SWEETZER AVE 90048

Application / Permit
20014-30000-03183
Plan Check / Job No.
B20WL03227
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT EXISTING DETACHED 2-CAR GARAGE INTO A CCESSORY DWELLING UNIT (ADU), AND 2ND FLOOR ADDITION FOR PROPOSED ADU, PER ORDINANCE.
Permit Issued
Issued on 10/5/2021
Issuing Office
Current Status
Issued on 10/5/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/29/2020 APPLICANT
Assigned to Plan Check Engineer 8/20/2020 SERGIO SILVA
Corrections Issued 8/25/2020 SERGIO SILVA
Quality Review Completed 9/2/2020 KAVIAN REFAHI
Building Plans Picked Up 9/2/2020 APPLICANT
Applicant returned to address corrections 7/1/2021 SERGIO SILVA
Plan Check Approved 7/21/2021 SERGIO SILVA
Issued 10/5/2021 APPLICANT
CofO in Progress 4/25/2024 MEL KHACHATOURIAN
CofO Issued-Status Void 4/29/2024 DANIEL ORRANTE
Permit Finaled-Status Void 4/29/2024 DANIEL ORRANTE
Re-Activate Permit 5/21/2025 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 10/5/2020 CECILIO NAVARRO
Roof/Waste drainage to street Cleared 10/5/2020 CECILIO NAVARRO
Eng Process Fee Ord 176,300 Cleared 10/6/2020 CECILIO NAVARRO
Construction near power lines Cleared 12/11/2020 RIDWAN HARDY
Construction within easement Cleared 12/11/2020 RIDWAN HARDY
Trees in Parkway Cleared 3/3/2021 JOHN KIM
CPC Cleared 3/15/2021 JOE LUCKEY
Hydrant and Access approval Cleared 4/12/2021 MATTHEW CRAIG
Permit Cleared 5/19/2021 CECILIO NAVARRO
Sewer availability Cleared 5/27/2021 CECILIO NAVARRO
Green Code Cleared 7/1/2021 SERGIO SILVA

Contact Information

Architect Youssefzadeh,, Atabak; Lic. No.: C22727 438 S PECK DRIVE      BEVERLY HILLS, CA 90212
Contractor Owner-Builder       ,
Engineer Perez,, Thomas E; Lic. No.: C67549 1521 FRANZEN AVE      SANTA ANA, CA 92703
Engineer Zhong,, Raymond Meng; Lic. No.: M27635 2416 W VALLEY BLVD      ALHAMBRA, CA 91803

Inspector Information

WILBER ROSALES, (310) 914-3892 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/2/2021 Corrections Issued EVAN COOPER
METHANE-Barrier 11/2/2021 Approved EVAN COOPER
METHANE-Subgrade 11/2/2021 Approved EVAN COOPER
PLUMBING-Rough 11/8/2021 No Access for Inspection EVAN COOPER
ELECTRICAL-Rough 11/9/2021 Partial Inspection EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 12/8/2021 Partial Approval EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 1/4/2022 Corrections Issued EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 5/23/2022 Not Ready for Inspection EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 6/1/2022 Partial Approval EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 10/28/2022 Partial Approval EVAN COOPER
PLUMBING-Rough 10/28/2022 Approved EVAN COOPER
BUILDING-Rough-Frame 12/20/2022 Not Ready for Inspection JEREMY TODD
Green Building Rough 12/20/2022 Not Ready for Inspection JEREMY TODD
Interior/Exterior Lathing 12/20/2022 Not Ready for Inspection JEREMY TODD
METHANE-Rough 12/20/2022 Not Ready for Inspection JEREMY TODD
ELECTRICAL-Rough 1/17/2023 Partial Approval JEREMY TODD
HVAC-Rough 1/17/2023 Approved JEREMY TODD
Interior/Exterior Lathing 1/17/2023 Partial Approval JEREMY TODD
Wood Frame 1/17/2023 Partial Approval JEREMY TODD
Shower Pan 1/25/2023 Approved JEREMY TODD
Wood Frame 1/25/2023 Approved JEREMY TODD
Insulation 1/27/2023 Approved JEREMY TODD
Drywall Nailing 2/9/2023 Approved GERMAN RODRIGUEZ MENDOZA
Green Building Rough 2/9/2023 Approved GERMAN RODRIGUEZ MENDOZA
Interior/Exterior Lathing 2/9/2023 Approved GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 2/1/2024 Approved MEL KHACHATOURIAN
Final 2/1/2024 Corrections Issued MEL KHACHATOURIAN
Footing/Foundation/Slab 2/1/2024 Approved MEL KHACHATOURIAN
Green Building Final 2/1/2024 Not Ready for Inspection MEL KHACHATOURIAN
METHANE-Final 2/1/2024 Approved MEL KHACHATOURIAN
METHANE-Rough 2/1/2024 Approved MEL KHACHATOURIAN
SGSOV-Seismic Gas S/O Valve 2/1/2024 SGSOV Not Ready MEL KHACHATOURIAN
Smoke Detectors 2/1/2024 Not Ready for Inspection MEL KHACHATOURIAN
Final 3/22/2024 Corrections Issued MEL KHACHATOURIAN
Green Building Final 3/22/2024 Approved MEL KHACHATOURIAN
SGSOV-Seismic Gas S/O Valve 3/22/2024 SGSOV Approved MEL KHACHATOURIAN
Smoke Detectors 3/22/2024 Approved MEL KHACHATOURIAN
Final 4/5/2024 OK to Issue CofO MEL KHACHATOURIAN