420 S ORLANDO AVE 90048

Certificate Information: 420 S ORLANDO AVE 90048

Application / Permit
20014-30000-01637
Plan Check / Job No.
B20WL01726
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT 18'0"X 18'0" (E) GARAGE PLUS ADDING 178 SF AREA TO ACCESSORY DWELLING UNIT. ALL WORK PER ENGINEERING. SEE COMMENT.
Permit Issued
Issued on 8/17/2020
Issuing Office
West Los Angeles
Current Status
CofO Issued on 1/18/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/16/2020 APPLICANT
Assigned to Plan Check Engineer 4/20/2020 PARISA ZAHABI
Corrections Issued 4/20/2020 PARISA ZAHABI
Applicant returned to address corrections 6/29/2020 VLADIMIR ARUTYUNYAN
Plan Check Approved 8/6/2020 RICHARD GARCIA
Issued 8/17/2020 APPLICANT
Building Plans Picked Up 8/18/2020 APPLICANT
CofO in Progress 1/7/2022 EVAN COOPER
Permit Finaled 1/18/2022 DANIEL ORRANTE
CofO Issued 1/18/2022 DANIEL ORRANTE
Permit Finaled 1/18/2022 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 5/21/2020 RENZ SORIANO
Roof/Waste drainage to street Cleared 5/21/2020 RENZ SORIANO
Address approval Cleared 5/22/2020 ELENA LOPEZ
Sewer availability Cleared 5/26/2020 RENZ SORIANO
ZA Case Cleared 5/28/2020 KENTON TRINH
ZI Cleared 5/28/2020 KENTON TRINH
Construction near power lines Cleared 6/24/2020 RIDWAN HARDY
Low Impact Development Cleared 7/28/2020 ROBIN YAMADA

Contact Information

Contractor Robin Development Inc; Lic. No.: 1053635-B 470 S BEDFORD DR #401      BEVERLY HILLS, CA 90212

Inspector Information

WILBER ROSALES, (310) 914-3892 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/20/2020 Corrections Issued EVAN COOPER
Footing/Foundation/Slab 9/11/2020 Not Ready for Inspection EVAN COOPER
Footing/Foundation/Slab 9/16/2020 Approved EVAN COOPER
METHANE-Barrier 9/16/2020 Approved EVAN COOPER
METHANE-Subgrade 9/16/2020 Approved EVAN COOPER
PLUMBING-Rough 9/16/2020 Approved EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 10/16/2020 Not Ready for Inspection EVAN COOPER
PLUMBING-Rough 10/16/2020 Approved EVAN COOPER
BUILDING-Rough-Frame 11/2/2020 Partial Approval EVAN COOPER
Final 11/2/2020 Not Ready for Inspection EVAN COOPER
Green Building Final 11/2/2020 Partial Approval EVAN COOPER
Green Building Rough 11/2/2020 Not Ready for Inspection EVAN COOPER
METHANE-Final 11/2/2020 Not Ready for Inspection EVAN COOPER
METHANE-Rough 11/2/2020 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 11/2/2020 SGSOV Not Ready EVAN COOPER
Smoke Detectors 11/2/2020 Not Ready for Inspection EVAN COOPER
Wood Frame 11/2/2020 Partial Approval EVAN COOPER
ELECTRICAL-Rough 12/7/2020 Approved EVAN COOPER
HVAC-Rough 12/7/2020 Approved EVAN COOPER
Insulation 12/7/2020 Approved EVAN COOPER
Interior/Exterior Lathing 12/7/2020 Approved EVAN COOPER
Shower Pan 12/7/2020 Approved EVAN COOPER
Drywall Nailing 12/15/2020 Corrections Issued EVAN COOPER
HVAC-Final 7/27/2021 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 10/22/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Final 10/22/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Green Building Final 10/22/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Green Building Rough 10/22/2021 Not Ready for Inspection OGANES TARAKHCHYAN
METHANE-Final 10/22/2021 Not Ready for Inspection OGANES TARAKHCHYAN
METHANE-Rough 10/22/2021 Not Ready for Inspection OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 10/22/2021 SGSOV Not Ready OGANES TARAKHCHYAN
Smoke Detectors 10/22/2021 Not Ready for Inspection OGANES TARAKHCHYAN
BUILDING-Rough-Frame 11/9/2021 Not Ready for Inspection EVAN COOPER
Final 11/9/2021 Not Ready for Inspection EVAN COOPER
Green Building Final 11/9/2021 Not Ready for Inspection EVAN COOPER
Green Building Rough 11/9/2021 Not Ready for Inspection EVAN COOPER
METHANE-Final 11/9/2021 Not Ready for Inspection EVAN COOPER
METHANE-Rough 11/9/2021 Not Ready for Inspection EVAN COOPER
SGSOV-Seismic Gas S/O Valve 11/9/2021 SGSOV Not Ready EVAN COOPER
Smoke Detectors 11/9/2021 Not Ready for Inspection EVAN COOPER
BUILDING-Rough-Frame 1/7/2022 Approved EVAN COOPER
ELECTRICAL-Final 1/7/2022 Approved EVAN COOPER
Final 1/7/2022 OK to Issue CofO EVAN COOPER
Green Building Final 1/7/2022 Approved EVAN COOPER
Green Building Rough 1/7/2022 Approved EVAN COOPER
HVAC-Final 1/7/2022 Approved EVAN COOPER
METHANE-Final 1/7/2022 Approved EVAN COOPER
METHANE-Rough 1/7/2022 Approved EVAN COOPER
PLUMBING-Final 1/7/2022 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 1/7/2022 SGSOV Approved EVAN COOPER
Smoke Detectors 1/7/2022 Approved EVAN COOPER