3424 S BENTLEY AVE 90034

Certificate Information: 3424 S BENTLEY AVE 90034

Application / Permit
20014-30000-00892
Plan Check / Job No.
B20WL00994
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Enclose (e) porch area to extend (e) bedroom and add (n) bathroom. Per engineering design.
Permit Issued
Issued on 9/17/2020
Issuing Office
Current Status
CofO Issued on 3/6/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/27/2020 APPLICANT
Assigned to Plan Check Engineer 2/27/2020 KAVIAN REFAHI
Corrections Issued 2/27/2020 KAVIAN REFAHI
Plan Check Approved 3/13/2020 ALFREDO JARA
Issued 9/17/2020 APPLICANT
CofO in Progress 3/6/2021 KENNETH NAGLE
Permit Finaled 3/6/2021 KENNETH NAGLE
CofO Issued 3/6/2021 KENNETH NAGLE
Permit Finaled 3/6/2021 KENNETH NAGLE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/13/2020 KIRK LINKLATER

Contact Information

Contractor Diloretto Diego; Lic. No.: 1058232-B 19135 CANTARA ST      RESEDA, CA 91335
Engineer Perazzelli,, Joseph Ames; Lic. No.: C35270 183 GREENFIELD AVENUE      LOS ANGELES, CA 90049

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 9/24/2020 Conditional Approval SORIN CIRSTOIU
Footing/Foundation/Slab 10/1/2020 Approved EVAN COOPER
BUILDING-Rough-Frame 10/15/2020 Partial Approval OGANES TARAKHCHYAN
ELECTRICAL-Rough 10/15/2020 Approved OGANES TARAKHCHYAN
Floor/Roof Diaphrgm/Shear Wall 10/15/2020 Approved OGANES TARAKHCHYAN
MERV13>=Rough 10/15/2020 Not Ready for Inspection OGANES TARAKHCHYAN
PLUMBING-Rough 10/15/2020 Not Ready for Inspection OGANES TARAKHCHYAN
Structural Steel Frame 10/15/2020 Not Ready for Inspection OGANES TARAKHCHYAN
Wood Frame 10/15/2020 Approved OGANES TARAKHCHYAN
BUILDING-Rough-Frame 10/29/2020 Approved OGANES TARAKHCHYAN
Insulation 10/29/2020 Approved OGANES TARAKHCHYAN
MERV13>=Rough 10/29/2020 Approved OGANES TARAKHCHYAN
Shower Pan 11/2/2020 Approved OGANES TARAKHCHYAN
Drywall Nailing 11/12/2020 Approved KENNETH NAGLE
Final 2/11/2021 Corrections Issued RICHARD ROBLES
MERV13>=Final 2/11/2021 Not Ready for Inspection RICHARD ROBLES
SGSOV-Seismic Gas S/O Valve 2/11/2021 SGSOV Approved RICHARD ROBLES
Smoke Detectors 2/11/2021 Approved RICHARD ROBLES
Final 3/1/2021 Conditional Approval RICHARD ROBLES
MERV13>=Final 3/1/2021 Approved RICHARD ROBLES