7634 N DE SOTO AVE 91304

Certificate Information: 7634 N DE SOTO AVE 91304

Application / Permit
20014-20000-05277
Plan Check / Job No.
B20VN15484
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
PROPOSED 4'-11" X 20'-10" ADDITION AT 1ST STORY TO ENLARGE GARAGE AND 20'-10" X 26'-2" 2ND STORY ADDITION FOR (N) ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ALL WORK PER ENGINEERING.
Permit Issued
Issued on 7/8/2021
Issuing Office
Current Status
CofO Issued on 12/28/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/30/2020 APPLICANT
Assigned to Plan Check Engineer 12/11/2020 RAPHAEL ROSAS
Corrections Issued 12/13/2020 RAPHAEL ROSAS
Applicant returned to address corrections 6/14/2021 RAPHAEL ROSAS
Issued 7/8/2021 APPLICANT
Building Plans Picked Up 7/12/2021 APPLICANT
CofO in Progress 12/23/2022 SEAN HAUPT
Permit Finaled 12/28/2022 MICHAEL SMITH
CofO Issued 12/28/2022 MICHAEL SMITH
Permit Finaled 12/28/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 1/11/2021 ADRIAN CASTRO
Eng Process Fee Ord 176,300 Cleared 1/11/2021 ADRIAN CASTRO
Sewer availability Cleared 1/11/2021 ADRIAN CASTRO
Low Impact Development Cleared 6/4/2021 YVAINNE GALSIM
Roof/Waste drainage to street Cleared 6/7/2021 ABDULLAH SADOZAI

Contact Information

Contractor E G N Builders Group; Lic. No.: 1051430-B 5000 PARKWAY CALABASAS   SUITE 308    CALABASAS, CA 91302
Engineer Sivushenka,, Mikita; Lic. No.: C87698 22121 CLARENDON ST APT 340      WOODLAND HILLS, CA 91367

Inspector Information

ALEXANDER HANDY, (818) 774-4317 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/20/2021 Conditional Approval HENRY KIM
Footing/Foundation/Slab 9/1/2021 Corrections Issued HENRY KIM
Pre-Inspection 9/1/2021 Corrections Issued HENRY KIM
Footing/Foundation/Slab 9/13/2021 Corrections Issued HENRY KIM
Pre-Inspection 9/13/2021 Corrections Issued HENRY KIM
Wood Frame 10/6/2021 Not Ready for Inspection HENRY KIM
Floor/Roof Diaphrgm/Shear Wall 10/8/2021 Partial Approval HENRY KIM
BUILDING-Rough-Frame 11/24/2021 Corrections Issued STEVEN BACK
ELECTRICAL-Rough 11/24/2021 Corrections Issued STEVEN BACK
Green Building Rough 11/24/2021 Not Ready for Inspection STEVEN BACK
PLUMBING-Rough 11/24/2021 Not Ready for Inspection STEVEN BACK
BUILDING-Rough-Frame 12/20/2021 Corrections Issued STEVEN BACK
ELECTRICAL-Rough 12/20/2021 Not Ready for Inspection STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 12/20/2021 Corrections Issued STEVEN BACK
Footing/Foundation/Slab 12/20/2021 Corrections Issued STEVEN BACK
Green Building Rough 12/20/2021 Not Ready for Inspection STEVEN BACK
PLUMBING-Rough 12/20/2021 Approved STEVEN BACK
Deputy Wood Construction 1/19/2022 Conditional Approval JAVIER RAMOS JR
BUILDING-Rough-Frame 1/31/2022 Not Ready for Inspection STEVEN BACK
ELECTRICAL-Rough 1/31/2022 Corrections Issued STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 1/31/2022 Corrections Issued STEVEN BACK
Footing/Foundation/Slab 1/31/2022 Approved STEVEN BACK
PLUMBING-Rough 1/31/2022 Approved STEVEN BACK
ELECTRICAL-Rough 2/4/2022 Corrections Issued STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 3/30/2022 Corrections Issued STEVEN BACK
Insulation 3/30/2022 Corrections Issued STEVEN BACK
Interior/Exterior Lathing 3/30/2022 Corrections Issued STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 4/5/2022 Not Ready for Inspection TROY SANDERS
Insulation 4/5/2022 Not Ready for Inspection TROY SANDERS
Interior/Exterior Lathing 4/5/2022 Partial Approval TROY SANDERS
Floor/Roof Diaphrgm/Shear Wall 4/8/2022 Not Ready for Inspection TROY SANDERS
Insulation 4/8/2022 Not Ready for Inspection TROY SANDERS
Floor/Roof Diaphrgm/Shear Wall 4/12/2022 Approved JESUS PINEDA
Insulation 4/12/2022 Not Ready for Inspection JESUS PINEDA
BUILDING-Rough-Frame 4/29/2022 Corrections Issued STEVEN BACK
ELECTRICAL-Rough 4/29/2022 Approved STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 4/29/2022 Corrections Issued STEVEN BACK
HVAC-Rough 4/29/2022 Approved STEVEN BACK
Insulation 4/29/2022 Corrections Issued STEVEN BACK
Sewer 5/5/2022 Approved STEVEN BACK
BUILDING-Rough-Frame 5/23/2022 Approved STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 5/23/2022 Approved STEVEN BACK
Green Building Rough 5/23/2022 Approved STEVEN BACK
Insulation 5/23/2022 Corrections Issued STEVEN BACK
Insulation 6/10/2022 No Access for Inspection JESUS PINEDA
BUILDING-Rough-Frame 6/15/2022 Approved STEVEN BACK
Insulation 6/15/2022 Approved STEVEN BACK
Drywall Nailing 7/1/2022 Approved JESUS PINEDA
Final 10/31/2022 Corrections Issued STEVEN BACK
Green Building Final 10/31/2022 Not Ready for Inspection STEVEN BACK
SGSOV-Seismic Gas S/O Valve 10/31/2022 SGSOV Not Ready STEVEN BACK
Smoke Detectors 10/31/2022 Not Ready for Inspection STEVEN BACK
Final 12/20/2022 Corrections Issued SEAN HAUPT
Green Building Final 12/20/2022 Approved SEAN HAUPT
SGSOV-Seismic Gas S/O Valve 12/20/2022 SGSOV Approved SEAN HAUPT
Smoke Detectors 12/20/2022 Approved SEAN HAUPT
Final 12/22/2022 OK to Issue CofO SEAN HAUPT