4093 N HAYVENHURST DR 91436

Certificate Information: 4093 N HAYVENHURST DR 91436

Application / Permit
20014-20000-04813
Plan Check / Job No.
B20VN14218
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ADD 14'x20' TO AND CONVERT (E) DET. GARAGE INTO A (N) ACCESSORY DWELLING UNIT PER GCS 65852.2(e)(1)(B) and LAMC 12.22 A.33(c)¹, (d)¹, and (g). AUTOMATIC SPRINKLER SYSTEM IS REQUIRED.
Permit Issued
Issued on 1/19/2021
Issuing Office
Current Status
CofO Issued on 4/28/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/30/2020 APPLICANT
Assigned to Plan Check Engineer 11/9/2020 SEAN SHAHMIRI
Corrections Issued 11/9/2020 SEAN SHAHMIRI
Building Plans Picked Up 11/12/2020 APPLICANT
Applicant returned to address corrections 12/23/2020 SEAN SHAHMIRI
Applicant returned to address corrections 1/19/2021 SEAN SHAHMIRI
Plan Check Approved 1/19/2021 SEAN SHAHMIRI
Issued 1/19/2021 APPLICANT
CofO in Progress 4/1/2022 VINCENT HANLEY
CofO Issued 4/28/2022 MICHAEL SMITH
Permit Finaled 4/28/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 12/1/2020 ADRIAN CASTRO
Eng Process Fee Ord 176,300 Cleared 12/1/2020 ADRIAN CASTRO
Roof/Waste drainage to street Cleared 12/1/2020 ADRIAN CASTRO
Sewer availability Cleared 12/1/2020 ADRIAN CASTRO
Grading Pre-Inspection Cleared 12/24/2020 BARTON HOLMES
Hydrant and Access approval Cleared 1/6/2021 MATTHEW CRAIG

Contact Information

Contractor Extreme Paint & Remodeling Inc; Lic. No.: 969527-B 7657 WINNETKA AVE #495      CANOGA PARK, CA 91306
Engineer Standley,, Craig Erick; Lic. No.: C87675 5330 ZELZAH AVE UNIT 7      ENCINO, CA 91316

Inspector Information

THOMAS FINNILA, (818) 774-4324 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/1/2021 Corrections Issued RONALD COWAN
Excavation/Setback/Form/Re-Bar 4/20/2021 Approved RONALD COWAN
BUILDING-Rough-Frame 5/12/2021 Not Ready for Inspection RONALD COWAN
ELECTRICAL-Rough 5/12/2021 Not Ready for Inspection RONALD COWAN
Green Building Rough 5/12/2021 Not Ready for Inspection RONALD COWAN
PLUMBING-Rough 5/12/2021 Approved RONALD COWAN
Verify Sprinkler Sign Off 5/12/2021 Approved RONALD COWAN
BUILDING-Rough-Frame 6/3/2021 Corrections Issued RONALD COWAN
ELECTRICAL-Rough 6/3/2021 Approved RONALD COWAN
Green Building Rough 6/3/2021 Not Ready for Inspection RONALD COWAN
Rough-Elec/Plmb/HVAC 6/3/2021 Approved RONALD COWAN
BUILDING-Rough-Frame 6/24/2021 Corrections Issued STEPHANIE SWANSON
Drywall Nailing 6/24/2021 Corrections Issued STEPHANIE SWANSON
Green Building Rough 6/24/2021 Approved STEPHANIE SWANSON
Insulation 6/24/2021 Corrections Issued STEPHANIE SWANSON
Interior/Exterior Lathing 6/24/2021 Partial Approval STEPHANIE SWANSON
Pre-Inspection 6/24/2021 Partial Inspection RYAN SALAZAR
BUILDING-Rough-Frame 7/6/2021 Approved RYAN SALAZAR
Drywall Nailing 7/6/2021 Approved RYAN SALAZAR
Floor/Roof Diaphrgm/Shear Wall 7/6/2021 Conditional Approval RYAN SALAZAR
Insulation 7/6/2021 Approved RYAN SALAZAR
Shower Pan 7/15/2021 Approved RONALD COWAN
Interior/Exterior Lathing 7/30/2021 Approved RONALD COWAN
ELECTRICAL-Final 2/28/2022 Approved VINCENT HANLEY
Final 2/28/2022 Corrections Issued VINCENT HANLEY
Footing/Foundation/Slab 2/28/2022 Approved VINCENT HANLEY
Green Building Final 2/28/2022 Approved VINCENT HANLEY
HVAC-Final 2/28/2022 Approved VINCENT HANLEY
PLUMBING-Final 2/28/2022 Approved VINCENT HANLEY
SGSOV-Seismic Gas S/O Valve 2/28/2022 SGSOV Approved VINCENT HANLEY
Smoke Detectors 2/28/2022 Approved VINCENT HANLEY
Final 4/1/2022 OK to Issue CofO VINCENT HANLEY