6328 N RADFORD AVE 91606

Certificate Information: 6328 N RADFORD AVE 91606

Application / Permit
20014-20000-03944
Plan Check / Job No.
B20VN11991
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION TO THE REAR OF THE (E) SFD AND INTERIOR REMODEL.
Permit Issued
Issued on 3/9/2021
Issuing Office
Current Status
CofO Issued on 4/19/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/10/2020 APPLICANT
Assigned to Plan Check Engineer 9/16/2020 FERNANDO FLORES
Corrections Issued 9/17/2020 FERNANDO FLORES
Applicant returned to address corrections 2/9/2021 PINANK PATEL
Plan Check Approved 2/10/2021 PINANK PATEL
Issued 3/9/2021 APPLICANT
Building Plans Picked Up 3/30/2021 APPLICANT
CofO in Progress 4/13/2022 MATT KELLERMAN
CofO Issued 4/19/2022 MICHAEL SMITH
Permit Finaled 4/19/2022 MICHAEL SMITH

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 10/28/2020 GUILLERMO PETRA

Contact Information

Contractor Owner-Builder       ,
Engineer Rivera,, Bobby Zulueta; Lic. No.: C77218 14703 HELWIG AVE      NORWALK, CA 90650

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/28/2021 Conditional Approval DANIEL ORRANTE
Excavation/Setback/Form/Re-Bar 6/10/2021 Not Ready for Inspection JOHN HAYES
Footing/Foundation/Slab 6/16/2021 Approved MISAEL ESPARZA
BUILDING-Rough-Frame 6/28/2021 Partial Approval DANIEL DREW
PLUMBING-Rough 6/28/2021 Partial Approval DANIEL DREW
Floor/Roof Diaphrgm/Shear Wall 7/8/2021 Partial Approval DANIEL DREW
Insulation 7/8/2021 Partial Approval DANIEL DREW
Floor/Roof Diaphrgm/Shear Wall 7/21/2021 Not Ready for Inspection DANIEL DREW
Gas Test 7/21/2021 Approved DANIEL DREW
Floor/Roof Diaphrgm/Shear Wall 7/22/2021 Not Ready for Inspection DANIEL DREW
BUILDING-Rough-Frame 7/23/2021 Not Ready for Inspection DANIEL DREW
Gas Test 7/23/2021 Not Ready for Inspection DANIEL DREW
Green Building Rough 7/23/2021 Not Ready for Inspection DANIEL DREW
ELECTRICAL-Rough 8/31/2021 Not Ready for Inspection CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 8/31/2021 Not Ready for Inspection CHRISTOPHE COCHRAN
PLUMBING-Rough 8/31/2021 Not Ready for Inspection CHRISTOPHE COCHRAN
Wood Frame 8/31/2021 Corrections Issued CHRISTOPHE COCHRAN
ELECTRICAL-Rough 9/3/2021 Approved DANIEL DREW
Floor/Roof Diaphrgm/Shear Wall 9/3/2021 Approved DANIEL DREW
PLUMBING-Rough 9/3/2021 Approved DANIEL DREW
HVAC-Rough 9/10/2021 Approved DANIEL DREW
Interior/Exterior Lathing 9/10/2021 Approved DANIEL DREW
Insulation 9/15/2021 Approved DANIEL DREW
Shower Pan 9/15/2021 Approved DANIEL DREW
Drywall Nailing 9/23/2021 Approved LILIANA PORTILLO
Interior/Exterior Lathing 9/23/2021 Approved LILIANA PORTILLO
PLUMBING-Rough 11/2/2021 Approved DANIEL DREW
BUILDING-Rough-Frame 4/1/2022 Approved ARAM AVEDISIAN
Final 4/1/2022 Corrections Issued ARAM AVEDISIAN
Green Building Final 4/1/2022 Approved ARAM AVEDISIAN
Green Building Rough 4/1/2022 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 4/1/2022 SGSOV Approved ARAM AVEDISIAN
Smoke Detectors 4/1/2022 Approved ARAM AVEDISIAN
Final 4/7/2022 Not Ready for Inspection MISAEL ESPARZA
ELECTRICAL-Final 4/12/2022 Approved MATT KELLERMAN
Final 4/12/2022 Conditional Approval MATT KELLERMAN