7041 N DARNOCH WAY 91307

Certificate Information: 7041 N DARNOCH WAY 91307

Application / Permit
20014-20000-03735
Plan Check / Job No.
B20VN11382
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED INT/EXT REMODEL. REMOVE WALLS BETWEEN LIVING/FAMILY/KITCHEN/DINING ROOM TO CREATE ONE OPEN FAMILY/LIVING/KITCHEN/DINING RM. THIS PERMIT TO INCLUDE KITCHEN REMODEL. CONVERT EX BATHRM INTO CLOSET. REMOVE/REPLACE EXISTING EXT WINDOWS/DOORS PER PLAN. PROPOSED 18'2-1/2" X 8'11-1/2"BATHRM ADDN INCL 3'6"X5' RESTRM (ACCESSIBLE FROM OUTSIDE ONLY FOR EX POOL). ALL PER ENGR DESIGN.
Permit Issued
Issued on 10/16/2020
Issuing Office
Valley
Current Status
CofO Issued on 5/21/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/30/2020 APPLICANT
Assigned to Plan Check Engineer 9/9/2020 HAYATO TSUCHIYA
Corrections Issued 9/10/2020 HAYATO TSUCHIYA
Plan Check Approved 10/5/2020 ROSENDO MEDINA
Issued 10/16/2020 APPLICANT
CofO in Progress 5/9/2022 CHRIS CHRISTENSEN
CofO Issued 5/21/2022 MICHAEL SMITH
Permit Finaled 5/21/2022 MICHAEL SMITH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/17/2020 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 9/17/2020 GABRIEL ROBLES
Grading Pre-Inspection Cleared 9/18/2020 BRIAN MILLER

Contact Information

Contractor Topaz Remodeling Inc; Lic. No.: 1019003-B 5789 FAIRHAVEN AVE      WOODLAND HILLS, CA 91367
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

JEFFREY HARTLINE, (818) 774-4320 Office Hours: 7:00-8:00 AM MON-FRI
CHRIS CHRISTENSEN, (818) 774-4320 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Interior/Exterior Lathing 10/19/2020 Partial Approval DAVID STEPANYAN
PLUMBING-Rough 10/20/2020 Partial Approval DAVID STEPANYAN
Footing/Foundation/Slab 10/27/2020 Approved TROY SANDERS
Floor/Roof Diaphrgm/Shear Wall 11/12/2020 Partial Approval DAVID STEPANYAN
BUILDING-Rough-Frame 11/24/2020 Corrections Issued DAVID STEPANYAN
ELECTRICAL-Rough 11/24/2020 Approved DAVID STEPANYAN
Green Building Rough 11/24/2020 Corrections Issued DAVID STEPANYAN
HVAC-Rough 11/24/2020 Not Ready for Inspection DAVID STEPANYAN
PLUMBING-Rough 11/24/2020 Corrections Issued DAVID STEPANYAN
BUILDING-Rough-Frame 12/2/2020 Approved DAVID STEPANYAN
Green Building Rough 12/2/2020 Approved DAVID STEPANYAN
HVAC-Rough 12/2/2020 Approved DAVID STEPANYAN
Interior/Exterior Lathing 12/2/2020 Partial Approval DAVID STEPANYAN
PLUMBING-Rough 12/2/2020 Approved DAVID STEPANYAN
Insulation 12/8/2020 Approved DAVID STEPANYAN
Shower Pan 12/8/2020 Approved DAVID STEPANYAN
Drywall Nailing 12/15/2020 Approved DAVID STEPANYAN
Interior/Exterior Lathing 12/15/2020 Approved DAVID STEPANYAN
ELECTRICAL-Final 3/19/2021 Corrections Issued DAVID STEPANYAN
Final 3/19/2021 Corrections Issued DAVID STEPANYAN
Green Building Final 3/19/2021 Approved DAVID STEPANYAN
HVAC-Final 3/19/2021 Corrections Issued DAVID STEPANYAN
PLUMBING-Final 3/19/2021 Corrections Issued DAVID STEPANYAN
SGSOV-Seismic Gas S/O Valve 3/19/2021 SGSOV Approved DAVID STEPANYAN
Smoke Detectors 3/19/2021 Approved DAVID STEPANYAN
Final 4/21/2021 Not Ready for Inspection DAVID STEPANYAN
Final 11/16/2021 Corrections Issued DAVID STEPANYAN
Final 4/11/2022 Corrections Issued CHRIS CHRISTENSEN
ELECTRICAL-Final 5/6/2022 Approved CHRIS CHRISTENSEN
Final 5/6/2022 OK to Issue CofO CHRIS CHRISTENSEN
HVAC-Final 5/6/2022 Approved CHRIS CHRISTENSEN
PLUMBING-Final 5/6/2022 Approved CHRIS CHRISTENSEN