17591 W REGENCY WAY 91344

Certificate Information: 17591 W REGENCY WAY 91344

Application / Permit
20014-20000-03718
Plan Check / Job No.
B20VN11330
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 47'5" X 20' AND 48'4" X 16' 1ST AND 2ND FLOOR ADDITIONS TO (E) SFD TO ENLARGE FAMILY ROOM , DINING ROOM , BEDROOM , ENTRY AT 1ST FLOOR AND ENLARGE (3) BEDROOMS , CLOSETS AND CREATE NEW STUDY ROOM AT 2ND FLOOR , INTERIOR REMODEL TO (E) SFD TO REMODEL BEDROOM , FAMILY ROOM AND DINING AT 1ST FLOOR , REMODEL (3) BEDROOMS, CONVERT STUDY TO BEDROOM AT 2ND FLOOR , NEW 7'9" X 7'8" PORCH , FIRE SPRINKLERS NFPA 13D REQUIRED THROUGHOUT, ALL WORK PER ENGINEERING
Permit Issued
Issued on 8/5/2022
Issuing Office
Valley
Current Status
Issued on 8/5/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/21/2020 APPLICANT
Assigned to Plan Check Engineer 10/15/2020 MOHAMMAD ESMAILI
Corrections Issued 10/16/2020 MOHAMMAD ESMAILI
Quality Review Completed 10/30/2020 OMID HEDAYAT
Building Plans Picked Up 11/4/2020 APPLICANT
Applicant returned to address corrections 5/23/2022 MOHAMMAD ESMAILI
Applicant returned to address corrections 8/1/2022 RARES BODEA
Plan Check Approved 8/5/2022 RARES BODEA
Issued 8/5/2022 APPLICANT

Permit Application Clearance Information

Miscellaneous Cleared 11/9/2020 HERMINIGILDO AGUSTIN
ZA Case Cleared 11/9/2020 HERMINIGILDO AGUSTIN
ZA Case Cleared 11/9/2020 HERMINIGILDO AGUSTIN
BHO/Hillside ordinance Cleared 11/18/2020 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 11/18/2020 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 11/18/2020 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 11/18/2020 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 5/3/2021 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 5/3/2021 LEE GUILBEAUX
Miscellaneous Cleared 5/3/2021 LEE GUILBEAUX
Sewer availability Cleared 5/3/2021 LEE GUILBEAUX
Low Impact Development Cleared 6/28/2021 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 7/6/2021 GABRIEL ROBLES
Hydrant and Access approval Cleared 3/10/2022 MATTHEW CRAIG
Distance to fire station Cleared 3/15/2022 KURT CORRAL
GPI Written Notices Cleared 8/1/2022 RARES BODEA
Grading Pre-Inspection Cleared 8/1/2022 MOHAMMAD ESMAILI

Contact Information

Contractor Owner-Builder       ,
Engineer Khatchadourian,, Vicken; Lic. No.: S3141 1221 N CEDAR ST      GLENDALE, CA 92107

Inspector Information

JEFFREY PARD, (818) 774-4312 Office Hours: 7:00-8:00 AM MON-FRI
STEVEN BACK, (818) 774-4312 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/17/2022 Approved DAVID SCANTLIN
METHANE-Subgrade 8/18/2022 Approved DAVID SCANTLIN
Pre-Inspection 8/30/2022 Approved DAVID SCANTLIN
Deputy Drilled-In Anchors 8/31/2022 Conditional Approval DAVID SCANTLIN
Footing/Foundation/Slab 9/2/2022 Not Ready for Inspection DAVID SCANTLIN
METHANE-Barrier 9/2/2022 Approved DAVID SCANTLIN
Pre-Inspection 10/14/2022 Not Ready for Inspection DAVID SCANTLIN
Pre-Inspection 11/1/2022 Approved JEFFREY PARD
Floor/Roof Diaphrgm/Shear Wall 11/30/2022 Approved DAVID SCANTLIN
METHANE-Barrier 4/5/2023 Corrections Issued STEVEN BACK
PLUMBING-Rough 4/5/2023 Partial Approval STEVEN BACK
PLUMBING-Rough 4/10/2023 Not Ready for Inspection STEVEN BACK
Underground Mechanical 4/10/2023 Not Ready for Inspection STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 10/10/2023 Corrections Issued STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 10/27/2023 Not Ready for Inspection STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 11/14/2023 Corrections Issued STEVEN BACK
HVAC-Rough 11/14/2023 Approved STEVEN BACK
Interior/Exterior Lathing 11/14/2023 Partial Approval STEVEN BACK
PLUMBING-Rough 11/14/2023 Approved STEVEN BACK
ELECTRICAL-Rough 12/12/2023 No Access for Inspection STEVEN BACK
Pre-Inspection 12/13/2023 Partial Inspection STEVEN BACK
ELECTRICAL-Rough 1/3/2024 Approved STEVEN BACK
METHANE-Rough 1/3/2024 Approved STEVEN BACK
Special/Order Compliance 1/3/2024 Corrections Issued STEVEN BACK
BUILDING-Rough-Frame 1/5/2024 Approved STEVEN BACK
Green Building Rough 1/5/2024 Approved STEVEN BACK
Verify Sprinkler Sign Off 1/5/2024 Approved STEVEN BACK
Insulation 2/22/2024 Approved STEVEN BACK
Drywall Nailing 3/14/2024 Approved STEVEN BACK
Final 6/20/2024 Not Ready for Inspection STEVEN BACK
Green Building Final 6/20/2024 Not Ready for Inspection STEVEN BACK
METHANE-Barrier 6/20/2024 Not Ready for Inspection STEVEN BACK
Pre-Inspection 6/20/2024 Partial Inspection STEVEN BACK
SGSOV-Seismic Gas S/O Valve 6/20/2024 SGSOV Not Ready STEVEN BACK
Smoke Detectors 6/20/2024 Not Ready for Inspection STEVEN BACK
Final 9/10/2024 Not Ready for Inspection STEVEN BACK
Footing/Foundation/Slab 9/10/2024 Not Ready for Inspection STEVEN BACK
Green Building Final 9/10/2024 Not Ready for Inspection STEVEN BACK
METHANE-Barrier 9/10/2024 Not Ready for Inspection STEVEN BACK
SGSOV-Seismic Gas S/O Valve 9/10/2024 SGSOV Not Ready STEVEN BACK
Smoke Detectors 9/10/2024 Not Ready for Inspection STEVEN BACK