4845 N ATOLL AVE 91423

Certificate Information: 4845 N ATOLL AVE 91423

Application / Permit
20014-20000-03617
Plan Check / Job No.
B20VN10996
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
11"5" X 6'5" ADDITION AND INTERIOR REMODEL TO THE (E) SFD.
Permit Issued
Issued on 10/9/2020
Issuing Office
Current Status
CofO Issued on 8/5/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/24/2020 APPLICANT
Assigned to Plan Check Engineer 8/30/2020 TSE MING HUANG
Corrections Issued 8/30/2020 TSE MING HUANG
Plan Check Approved 9/24/2020 PINANK PATEL
Issued 10/9/2020 APPLICANT
CofO in Progress 7/6/2021 RICHARD DOCKUS
Permit Finaled 8/5/2022 DANIEL ORRANTE
CofO Issued 8/5/2022 DANIEL ORRANTE
Permit Finaled 8/5/2022 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/14/2020 GUILLERMO PETRA
Roof/Waste drainage to street Cleared 9/14/2020 GUILLERMO PETRA

Contact Information

Contractor Alex Cage Construction & Hardwood Floors; Lic. No.: 796648-B 14624 MARGATE STREET      SHERMAN OAKS, CA 91411
Engineer Avila,, Albert Guerrero; Lic. No.: C41726 10034 GLADE AVNENUE      CHATSWORTH, CA 91311

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/30/2020 Approved BRENDAN LOONEY
Wood Frame 11/9/2020 Partial Approval BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 11/20/2020 Partial Approval BRENDAN LOONEY
BUILDING-Rough-Frame 1/20/2021 Corrections Issued BRENDAN LOONEY
ELECTRICAL-Rough 1/20/2021 Not Ready for Inspection BRENDAN LOONEY
Green Building Rough 1/20/2021 Not Ready for Inspection BRENDAN LOONEY
HVAC-Rough 1/20/2021 Not Ready for Inspection BRENDAN LOONEY
MERV13>=Rough 1/20/2021 Approved BRENDAN LOONEY
PLUMBING-Rough 1/20/2021 Not Ready for Inspection BRENDAN LOONEY
Insulation 1/29/2021 Approved BRENDAN LOONEY
Interior/Exterior Lathing 1/29/2021 Partial Approval BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 2/1/2021 Approved BRENDAN LOONEY
Drywall Nailing 2/5/2021 Approved BRENDAN LOONEY
BUILDING-Rough-Frame 6/15/2021 Approved RICHARD DOCKUS
ELECTRICAL-Final 6/15/2021 Partial Approval RICHARD DOCKUS
Final 6/15/2021 Corrections Issued RICHARD DOCKUS
Footing/Foundation/Slab 6/15/2021 Approved RICHARD DOCKUS
Green Building Final 6/15/2021 Approved RICHARD DOCKUS
Green Building Rough 6/15/2021 Approved RICHARD DOCKUS
HVAC-Final 6/15/2021 Approved RICHARD DOCKUS
MERV13>=Final 6/15/2021 Approved RICHARD DOCKUS
PLUMBING-Final 6/15/2021 Approved RICHARD DOCKUS
SGSOV-Seismic Gas S/O Valve 6/15/2021 SGSOV Not Ready RICHARD DOCKUS
Smoke Detectors 6/15/2021 Not Ready for Inspection RICHARD DOCKUS
ELECTRICAL-Final 7/2/2021 Approved RICHARD DOCKUS
Final 7/2/2021 OK to Issue CofO RICHARD DOCKUS
Gas Test 7/2/2021 Approved RICHARD DOCKUS
SGSOV-Seismic Gas S/O Valve 7/2/2021 SGSOV Approved RICHARD DOCKUS
Smoke Detectors 7/2/2021 Approved RICHARD DOCKUS