9156 S DALTON AVE 90047

Certificate Information: 9156 S DALTON AVE 90047

Application / Permit
20014-20000-03536
Plan Check / Job No.
B20VN10809
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
12'6" X 20'8" ADDITION TO THE REAR OF THE (E) SFD AND INTERIOR REMODEL. ALL WORK PER ENGINEER.
Permit Issued
Issued on 10/6/2020
Issuing Office
Valley
Current Status
CofO Issued on 7/9/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/20/2020 APPLICANT
Assigned to Plan Check Engineer 8/21/2020 PINANK PATEL
Corrections Issued 8/24/2020 PINANK PATEL
Plan Check Approved 9/17/2020 PINANK PATEL
Issued 10/6/2020 APPLICANT
CofO in Progress 6/28/2025 DAVID FEILER
Permit Finaled 7/9/2025 RICHARD STEINBACH
CofO Issued 7/9/2025 RICHARD STEINBACH
Permit Finaled 7/9/2025 RICHARD STEINBACH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/2/2020 RENZ SORIANO
Roof/Waste drainage to street Cleared 9/2/2020 RENZ SORIANO
Sewer availability Cleared 9/2/2020 RENZ SORIANO

Contact Information

Contractor Innovation Design And Construction Inc; Lic. No.: 787991-B 12501 BURBANK BLVD #4      VALLEY VILLAGE, CA 91007
Engineer Almalla,, Dean; Lic. No.: C58024 15053 VENTURA BLVD STE 205      SHERMAN OAKS, CA 91403

Inspector Information

BEN MOLSTAD, (310) 732-4557 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/28/2020 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 11/10/2020 Partial Approval FREDDIE RIVERA
BUILDING-Rough-Frame 2/16/2021 Corrections Issued FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 2/16/2021 Conditional Approval FREDDIE RIVERA
Green Building Rough 2/16/2021 Not Ready for Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 3/4/2021 Partial Approval FREDDIE RIVERA
ELECTRICAL-Rough 3/4/2021 Approved FREDDIE RIVERA
Green Building Rough 3/4/2021 Approved FREDDIE RIVERA
HVAC-Rough 3/4/2021 Approved FREDDIE RIVERA
PLUMBING-Rough 3/4/2021 Approved FREDDIE RIVERA
Pre-Inspection 3/4/2021 Corrections Issued FREDDIE RIVERA
Insulation 5/7/2021 Approved SABAS ALONSO
Interior/Exterior Lathing 5/7/2021 Partial Approval SABAS ALONSO
Drywall Nailing 5/25/2021 Approved FREDDIE RIVERA
Interior/Exterior Lathing 6/1/2021 Corrections Issued EUGENE CASSIDY
Shower Pan 6/1/2021 Approved EUGENE CASSIDY
Interior/Exterior Lathing 6/8/2021 Approved CALEB MEISTER
BUILDING-Rough-Frame 9/22/2021 Not Ready for Inspection FREDDIE RIVERA
Final 9/22/2021 Not Ready for Inspection FREDDIE RIVERA
Footing/Foundation/Slab 9/22/2021 Not Ready for Inspection FREDDIE RIVERA
Green Building Final 9/22/2021 Not Ready for Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 9/22/2021 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 9/22/2021 Not Ready for Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 10/21/2021 Not Ready for Inspection HORACE FULTZ
Final 10/21/2021 Corrections Issued HORACE FULTZ
Footing/Foundation/Slab 10/21/2021 Approved HORACE FULTZ
Green Building Final 10/21/2021 Corrections Issued HORACE FULTZ
SGSOV-Seismic Gas S/O Valve 10/21/2021 SGSOV Approved HORACE FULTZ
Smoke Detectors 10/21/2021 Corrections Issued HORACE FULTZ
BUILDING-Rough-Frame 11/2/2021 Approved JOAQUIN GREENOUGH
ELECTRICAL-Final 11/2/2021 Not Ready for Inspection JOAQUIN GREENOUGH
Green Building Final 11/2/2021 Not Ready for Inspection JOAQUIN GREENOUGH
PLUMBING-Final 11/2/2021 Corrections Issued JOAQUIN GREENOUGH
Smoke Detectors 11/2/2021 Approved JOAQUIN GREENOUGH
Special/Order Compliance 11/9/2021 Corrections Issued FREDDIE RIVERA
Final 12/21/2021 Partial Approval HORACE FULTZ
Green Building Final 12/21/2021 Approved HORACE FULTZ
Final 6/28/2025 OK to Issue CofO DAVID FEILER