7353 W 88TH ST 90045

Certificate Information: 7353 W 88TH ST 90045

Application / Permit
20014-20000-03312
Plan Check / Job No.
B20VN10146
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADD IRREGULAR 23'-7" X 28'-11" FOR TWO NEW BEDROOMS, EXTEND (E) ENTRY, NEW FULL BATH AND UTILITY ROOM. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 1/12/2021
Issuing Office
Current Status
CofO Issued on 3/30/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/10/2020 APPLICANT
Assigned to Plan Check Engineer 8/14/2020 SAMUEL GONZALEZ
Corrections Issued 8/14/2020 SAMUEL GONZALEZ
Plan Check Approved 1/11/2021 JENNIFER LEE
Issued 1/12/2021 APPLICANT
CofO in Progress 3/25/2022 BOBBY KEY
Permit Finaled 3/30/2022 DANIEL ORRANTE
CofO Issued 3/30/2022 DANIEL ORRANTE
Permit Finaled 3/30/2022 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/2/2020 CATHERINE ADROVER
Sewer availability Cleared 9/3/2020 CATHERINE ADROVER
Grading Pre-Inspection Cleared 9/18/2020 KIRK LINKLATER
Specific Plan Cleared 9/22/2020 PEDRO AYALA
Low Impact Development Cleared 11/4/2020 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 12/15/2020 CATHERINE ADROVER

Contact Information

Contractor Specialty Remodeling Inc; Lic. No.: 1050840-B 3940 LAUREL CAYON BLVD   UNIT #120    STUDIO CITY, CA 91604
Engineer Standley,, Craig Erick; Lic. No.: C87675 5330 ZELZAH AVE UNIT 7      ENCINO, CA 91316

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 2/3/2021 Not Ready for Inspection EVAN COOPER
Excavation/Setback/Form/Re-Bar 2/5/2021 Corrections Issued JUAN VALENZUELA
Deputy Drilled-In Anchors 2/8/2021 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/9/2021 Partial Approval DAVID HEINE
Floor/Roof Diaphrgm/Shear Wall 2/17/2021 Not Ready for Inspection PIERRE VEGA
PLUMBING-Rough 2/17/2021 Not Ready for Inspection PIERRE VEGA
Insulation 2/18/2021 Partial Approval DAVID HEINE
Insulation 2/19/2021 Partial Approval ANTHONY MCDOWALL
Floor/Roof Diaphrgm/Shear Wall 2/23/2021 Partial Approval DAVID HEINE
BUILDING-Rough-Frame 3/15/2021 Corrections Issued DAVID HEINE
Floor/Roof Diaphrgm/Shear Wall 3/15/2021 Corrections Issued DAVID HEINE
Green Building Rough 3/15/2021 Not Ready for Inspection DAVID HEINE
METHANE-Rough 3/15/2021 Approved DAVID HEINE
Floor/Roof Diaphrgm/Shear Wall 3/16/2021 Partial Approval JUAN VALENZUELA
Wood Frame 3/16/2021 Partial Inspection JUAN VALENZUELA
ELECTRICAL-Rough 3/31/2021 Partial Approval BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 3/31/2021 Corrections Issued BRENDAN LOONEY
HVAC-Rough 3/31/2021 Approved BRENDAN LOONEY
PLUMBING-Rough 3/31/2021 Approved BRENDAN LOONEY
ELECTRICAL-Rough 4/1/2021 Not Ready for Inspection BRENDAN LOONEY
HVAC-Rough 4/1/2021 Not Ready for Inspection BRENDAN LOONEY
PLUMBING-Rough 4/1/2021 Not Ready for Inspection BRENDAN LOONEY
ELECTRICAL-Rough 4/13/2021 Partial Approval ENRIQUE MIRELES
HVAC-Rough 4/13/2021 Approved ENRIQUE MIRELES
HVAC-Rough 4/14/2021 Approved BRENDAN LOONEY
Insulation 4/14/2021 Not Ready for Inspection BRENDAN LOONEY
PLUMBING-Rough 4/14/2021 Approved BRENDAN LOONEY
Wood Frame 4/16/2021 Corrections Issued BRENDAN LOONEY
Insulation 4/19/2021 Approved BRENDAN LOONEY
Wood Frame 4/19/2021 Partial Approval BRENDAN LOONEY
Interior/Exterior Lathing 4/21/2021 Partial Approval BRENDAN LOONEY
ELECTRICAL-Rough 4/22/2021 Partial Inspection BRENDAN LOONEY
HVAC-Rough 4/22/2021 Partial Inspection BRENDAN LOONEY
PLUMBING-Rough 4/22/2021 Partial Inspection BRENDAN LOONEY
Rough-Elec/Plmb/HVAC 4/22/2021 Partial Inspection BRENDAN LOONEY
Drywall Nailing 4/27/2021 Approved BRENDAN LOONEY
Green Building Rough 4/27/2021 Approved BRENDAN LOONEY
Interior/Exterior Lathing 4/27/2021 Approved BRENDAN LOONEY
BUILDING-Rough-Frame 3/24/2022 Approved BOBBY KEY
ELECTRICAL-Final 3/24/2022 Approved BOBBY KEY
Final 3/24/2022 Corrections Issued BOBBY KEY
Footing/Foundation/Slab 3/24/2022 Approved BOBBY KEY
Green Building Final 3/24/2022 Approved BOBBY KEY
HVAC-Final 3/24/2022 Approved BOBBY KEY
METHANE-Barrier 3/24/2022 Approved BOBBY KEY
METHANE-Subgrade 3/24/2022 Approved BOBBY KEY
PLUMBING-Final 3/24/2022 Approved BOBBY KEY
SGSOV-Seismic Gas S/O Valve 3/24/2022 SGSOV Not Ready BOBBY KEY
Smoke Detectors 3/24/2022 Approved BOBBY KEY
Final 3/25/2022 OK to Issue CofO BOBBY KEY
SGSOV-Seismic Gas S/O Valve 3/25/2022 SGSOV Approved BOBBY KEY