5739 N ST CLAIR AVE 91607

Certificate Information: 5739 N ST CLAIR AVE 91607

Application / Permit
20014-20000-02249
Plan Check / Job No.
B20VN07310
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ADD (10'-1"x 20'-3") TO AND CONVERT THE (E) (20'-7'x 20'-3") DETACHED 2-CAR GARAGE INTO A (N) ACCESORY DWELLING UNIT PER GCS 65852.2(e)(1)(A). WORK PER ENGINEER.
Permit Issued
Issued on 1/14/2021
Issuing Office
Current Status
CofO Issued on 11/1/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/2/2020 APPLICANT
Assigned to Plan Check Engineer 6/4/2020 TROY DEGUZMAN
Corrections Issued 6/10/2020 TROY DEGUZMAN
Building Plans Picked Up 6/18/2020 APPLICANT
Applicant returned to address corrections 11/18/2020 TROY DEGUZMAN
Plan Check Approved 11/30/2020 TROY DEGUZMAN
Issued 1/14/2021 APPLICANT
CofO in Progress 9/10/2021 CHRISTOPHE COCHRAN
CofO in Progress 9/10/2021 CHRISTOPHE COCHRAN
CofO Issued 11/1/2021 MICHAEL SMITH
Permit Finaled 11/1/2021 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 7/1/2020 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 7/1/2020 GABRIEL ROBLES
Permit Cleared 7/1/2020 GABRIEL ROBLES
Sewer availability Cleared 7/1/2020 GABRIEL ROBLES
Trees in Parkway Cleared 8/10/2020 JOHN KIM
Roof/Waste drainage to street Cleared 11/30/2020 ADRIAN CASTRO

Contact Information

Contractor Owner-Builder       ,
Engineer Masroor, Shalmani, Armin; Lic. No.: C83059 1035 ASTER AVE 2165      SUNNYVALE, CA 94086

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/10/2021 Partial Approval BRENDAN LOONEY
Underground Mechanical 2/10/2021 Approved BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 2/12/2021 Approved BRENDAN LOONEY
ELECTRICAL-Rough 3/8/2021 Approved BEAU COLLINS
Floor/Roof Diaphrgm/Shear Wall 3/8/2021 Approved BEAU COLLINS
Green Building Rough 3/8/2021 Not Ready for Inspection BEAU COLLINS
HVAC-Rough 3/8/2021 Approved BEAU COLLINS
PLUMBING-Rough 3/8/2021 Approved BEAU COLLINS
Sewer 3/8/2021 Approved BEAU COLLINS
Underground Mechanical 3/8/2021 Approved BEAU COLLINS
BUILDING-Rough-Frame 3/12/2021 Corrections Issued BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 3/12/2021 Partial Approval BRENDAN LOONEY
Green Building Rough 3/12/2021 Not Ready for Inspection BRENDAN LOONEY
Interior/Exterior Lathing 3/12/2021 Partial Approval BRENDAN LOONEY
Shower Pan 3/12/2021 Approved BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 3/17/2021 Approved BRENDAN LOONEY
Insulation 3/17/2021 Corrections Issued BRENDAN LOONEY
Interior/Exterior Lathing 3/17/2021 Approved BRENDAN LOONEY
Insulation 3/23/2021 Approved DANIEL ORRANTE
Interior/Exterior Lathing 3/23/2021 Not Ready for Inspection DANIEL ORRANTE
Drywall Nailing 3/31/2021 Approved RICHARD DOCKUS
Green Building Rough 3/31/2021 Approved RICHARD DOCKUS
BUILDING-Rough-Frame 4/29/2021 Approved RICHARD DOCKUS
Final 4/29/2021 Corrections Issued RICHARD DOCKUS
Footing/Foundation/Slab 4/29/2021 Approved RICHARD DOCKUS
Green Building Final 4/29/2021 Approved RICHARD DOCKUS
SGSOV-Seismic Gas S/O Valve 4/29/2021 SGSOV Not Ready RICHARD DOCKUS
Smoke Detectors 4/29/2021 Approved RICHARD DOCKUS
Final 6/16/2021 Not Ready for Inspection ARTHUR SARGSYAN
SGSOV-Seismic Gas S/O Valve 6/16/2021 SGSOV Not Ready ARTHUR SARGSYAN
Final 8/12/2021 OK to Issue CofO CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 8/12/2021 SGSOV Approved CHRISTOPHE COCHRAN