4711 S WILTON PL 90062

Certificate Information: 4711 S WILTON PL 90062

Application / Permit
20014-20000-01806
Plan Check / Job No.
B20VN06063
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO CREATE TWO NEW BEDROOM AND 36'-4" x 14'-4" BEDROOM, BATHROOMS AND LAUNDRY ROOM ADDITION AT 1ST FLOOR OF THE (E) SFD PER ENGINEERING.
Permit Issued
Issued on 8/21/2020
Issuing Office
Current Status
CofO Issued on 10/23/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/11/2020 APPLICANT
Assigned to Plan Check Engineer 5/14/2020 ARTIN ZARUKIAN
Corrections Issued 5/18/2020 ARTIN ZARUKIAN
Plan Check Approved 6/28/2020 HAYATO TSUCHIYA
Issued 8/21/2020 APPLICANT
CofO in Progress 10/7/2021 HORACE FULTZ
Permit Finaled 10/23/2021 DEROLD HAUFF
CofO Issued 10/23/2021 DEROLD HAUFF
Permit Finaled 10/23/2021 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 6/10/2020 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 6/18/2020 WALLIE JONG
Sewer availability Cleared 6/18/2020 WALLIE JONG

Contact Information

Contractor Owner-Builder       ,
Engineer Wu,, Harold Ping-Hung; Lic. No.: C35693 1168 SAN GABRIEL BLVD NO N      ROSEMEAD, CA 91770

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/26/2021 Conditional Approval ROBERT MCDOWELL
Footing/Foundation/Slab 5/26/2021 Approved ROBERT MCDOWELL
BUILDING-Rough-Frame 6/8/2021 Partial Approval SABAS ALONSO
PLUMBING-Rough 6/8/2021 Partial Inspection SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 7/6/2021 Partial Approval KATHRYN BUTTERWORTH
BUILDING-Rough-Frame 7/9/2021 Not Ready for Inspection JOAQUIN GREENOUGH
ELECTRICAL-Rough 7/9/2021 Not Ready for Inspection JOAQUIN GREENOUGH
Green Building Rough 7/9/2021 Corrections Issued JOAQUIN GREENOUGH
HVAC-Rough 7/9/2021 Not Ready for Inspection JOAQUIN GREENOUGH
PLUMBING-Rough 7/9/2021 Not Ready for Inspection JOAQUIN GREENOUGH
Shower Pan 7/9/2021 Not Ready for Inspection JOAQUIN GREENOUGH
PLUMBING-Rough 7/14/2021 Approved SABAS ALONSO
Rough-Elec/Plmb/HVAC 7/14/2021 Approved SABAS ALONSO
Shower Pan 7/14/2021 Partial Approval SABAS ALONSO
Wood Frame 7/14/2021 Approved SABAS ALONSO
Insulation 7/16/2021 Approved SABAS ALONSO
Interior/Exterior Lathing 7/16/2021 Not Ready for Inspection SABAS ALONSO
Drywall Nailing 7/20/2021 Approved DAVID FEILER
Green Building Rough 7/20/2021 Approved DAVID FEILER
Interior/Exterior Lathing 7/20/2021 Partial Approval DAVID FEILER
BUILDING-Rough-Frame 8/27/2021 Approved SABAS ALONSO
Final 8/27/2021 Corrections Issued SABAS ALONSO
Green Building Final 8/27/2021 Approved SABAS ALONSO
Pre-Inspection 8/27/2021 Partial Inspection JESUS PINEDA
SGSOV-Seismic Gas S/O Valve 8/27/2021 SGSOV Approved SABAS ALONSO
Smoke Detectors 8/27/2021 Approved SABAS ALONSO
Final 9/21/2021 OK to Issue CofO SABAS ALONSO