5434 N CROMER PL 91367

Certificate Information: 5434 N CROMER PL 91367

Application / Permit
20014-20000-01353
Plan Check / Job No.
B20VN04986
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT (19'-8" X 23'-1") ATTACHED GARAGE TO HABITABLE SPACE. ADD (23'-1" X 24'-2") FOR (N) ATTACHED CARPORT AND ADD (5'-8" X 27'-2") IRREGULAR SHAPE FOR (N) BATHROOMS. REMODEL (E) SFD. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 8/4/2020
Issuing Office
Current Status
CofO Issued on 11/16/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/27/2020 APPLICANT
Assigned to Plan Check Engineer 4/1/2020 RAPHAEL ROSAS
Corrections Issued 4/3/2020 RAPHAEL ROSAS
Applicant returned to address corrections 7/6/2020 ROSENDO MEDINA
Applicant returned to address corrections 7/20/2020 TROY DEGUZMAN
Plan Check Approved 8/4/2020 ROSENDO MEDINA
Issued 8/4/2020 APPLICANT
CofO in Progress 11/15/2021 STEVEN BACK
Permit Finaled 11/16/2021 MICHAEL SMITH
CofO Issued 11/16/2021 MICHAEL SMITH
Permit Finaled 11/16/2021 MICHAEL SMITH

Permit Application Clearance Information

Sewer availability Cleared 4/16/2020 JOHN TRIANTAFYLLOS
Eng Process Fee Ord 176,300 Cleared 4/17/2020 JOHN TRIANTAFYLLOS
Low Impact Development Cleared 6/29/2020 ANDRES COVARRUBIAS
Grading Pre-Inspection Cleared 6/30/2020 KIRK LINKLATER
Roof/Waste drainage to street Cleared 7/8/2020 JOHN TRIANTAFYLLOS
GPI Written Notices Cleared 7/20/2020 RAPHAEL ROSAS

Contact Information

Contractor Select Design Construction Inc; Lic. No.: 972421-B P O BOX 2256      RIALTO, CA 92377
Engineer Almalla,, Dean; Lic. No.: C58024 15053 VENTURA BLVD STE 205      SHERMAN OAKS, CA 91403

Inspector Information

DAVID FASTIGGI, (818) 774-4317 Office Hours: 7:00-8:00 AM MON-FRI
ALEXANDER HANDY, (818) 774-4317 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 8/7/2020 Partial Approval HENRY KIM
Pre-Inspection 8/7/2020 Corrections Issued HENRY KIM
Sewer 8/7/2020 Partial Approval HENRY KIM
Footing/Foundation/Slab 8/17/2020 Partial Approval HENRY KIM
Footing/Foundation/Slab 9/1/2020 Approved HENRY KIM
Pre-Inspection 9/1/2020 Corrections Issued HENRY KIM
Structural Steel Frame 9/1/2020 Corrections Issued HENRY KIM
Deputy Steel/Welding 10/29/2020 Conditional Approval HENRY KIM
BUILDING-Rough-Frame 11/20/2020 Corrections Issued HENRY KIM
PLUMBING-Rough 11/20/2020 Partial Approval HENRY KIM
ELECTRICAL-Rough 11/30/2020 Not Ready for Inspection HENRY KIM
HVAC-Rough 11/30/2020 Not Ready for Inspection HENRY KIM
PLUMBING-Rough 11/30/2020 Not Ready for Inspection HENRY KIM
Pre-Inspection 12/1/2020 Not Ready for Inspection HENRY KIM
HVAC-Rough 12/3/2020 Not Ready for Inspection HENRY KIM
PLUMBING-Rough 12/3/2020 Not Ready for Inspection HENRY KIM
Pre-Inspection 12/3/2020 Corrections Issued HENRY KIM
ELECTRICAL-Rough 12/14/2020 Corrections Issued HENRY KIM
Floor/Roof Diaphrgm/Shear Wall 12/14/2020 Corrections Issued HENRY KIM
HVAC-Rough 12/14/2020 Corrections Issued HENRY KIM
PLUMBING-Rough 12/14/2020 Corrections Issued HENRY KIM
Floor/Roof Diaphrgm/Shear Wall 12/29/2020 Partial Approval HENRY KIM
Rough-Elec/Plmb/HVAC 12/29/2020 Approved HENRY KIM
Structural Steel Frame 12/29/2020 Partial Approval HENRY KIM
Insulation 1/14/2021 Approved HENRY KIM
BUILDING-Rough-Frame 1/22/2021 Approved HENRY KIM
Floor/Roof Diaphrgm/Shear Wall 1/22/2021 Approved HENRY KIM
Green Building Rough 1/22/2021 Approved HENRY KIM
Interior/Exterior Lathing 1/22/2021 Approved HENRY KIM
MERV13>=Rough 1/22/2021 Approved HENRY KIM
Structural Steel Frame 1/22/2021 Approved HENRY KIM
Drywall Nailing 2/22/2021 Approved HENRY KIM
Interior/Exterior Lathing 2/22/2021 Approved HENRY KIM
Shower Pan 2/22/2021 Corrections Issued HENRY KIM
Shower Pan 2/25/2021 Corrections Issued HENRY KIM
Shower Pan 3/2/2021 Approved HENRY KIM
ELECTRICAL-Final 6/10/2021 Corrections Issued HENRY KIM
Final 6/10/2021 Corrections Issued HENRY KIM
Gas Test 6/10/2021 Corrections Issued HENRY KIM
Green Building Final 6/10/2021 Not Ready for Inspection HENRY KIM
HVAC-Final 6/10/2021 Corrections Issued HENRY KIM
MERV13>=Final 6/10/2021 Not Ready for Inspection HENRY KIM
PLUMBING-Final 6/10/2021 Not Ready for Inspection HENRY KIM
SGSOV-Seismic Gas S/O Valve 6/10/2021 SGSOV Not Ready HENRY KIM
Smoke Detectors 6/10/2021 Not Ready for Inspection HENRY KIM
ELECTRICAL-Final 7/7/2021 Corrections Issued HENRY KIM
Final 7/7/2021 Corrections Issued HENRY KIM
HVAC-Final 7/7/2021 Corrections Issued HENRY KIM
PLUMBING-Final 7/7/2021 Corrections Issued HENRY KIM
Pre-Inspection 8/12/2021 Corrections Issued HENRY KIM
ELECTRICAL-Final 9/2/2021 Corrections Issued HENRY KIM
Final 9/2/2021 Corrections Issued HENRY KIM
Gas Test 9/2/2021 Approved HENRY KIM
Green Building Final 9/2/2021 Approved HENRY KIM
HVAC-Final 9/2/2021 Corrections Issued HENRY KIM
MERV13>=Final 9/2/2021 Corrections Issued HENRY KIM
PLUMBING-Final 9/2/2021 Approved HENRY KIM
SGSOV-Seismic Gas S/O Valve 9/2/2021 SGSOV Approved HENRY KIM
Smoke Detectors 9/2/2021 Approved HENRY KIM
ELECTRICAL-Final 9/13/2021 Approved HENRY KIM
HVAC-Final 9/13/2021 Approved HENRY KIM
MERV13>=Final 9/13/2021 Approved HENRY KIM
Final 11/15/2021 OK to Issue CofO STEVEN BACK
HVAC-Final 11/15/2021 Approved STEVEN BACK