110 1/2 S MANSFIELD AVE 90036

Certificate Information: 110 1/2 S MANSFIELD AVE 90036

Application / Permit
20014-20000-00903
Plan Check / Job No.
B20VN03473
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
34'-0" X 27'-6" IRREGULAR SHAPED ADDITION AT 1ST FL, 23'-0" X 27'-6" ADDITION AT 2ND FL AND CONVERT 17'-0" X 19'-0" PORTION OF (E) 4 CAR GARAGE TO NEW ACCESSORY DWELLING UNIT W/ ROOF DECK & PATIO PER LAMC 12.22 A.33(c) and (d).
Permit Issued
Issued on 12/17/2021
Issuing Office
Current Status
CofO Issued on 5/22/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/27/2020 APPLICANT
Green Plans Picked Up 3/11/2020 APPLICANT
Assigned to Plan Check Engineer 3/19/2020 ARTIN ZARUKIAN
Corrections Issued 3/22/2020 ARTIN ZARUKIAN
Quality Review Completed 3/24/2020 STEVEN KIM
Plan Check Approved 12/16/2021 ARTIN ZARUKIAN
Issued 12/17/2021 APPLICANT
Building Plans Picked Up 12/22/2021 APPLICANT
CofO in Progress 5/19/2023 RICHARD DOCKUS
CofO Issued 5/22/2023 DEROLD HAUFF
Permit Finaled 5/22/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 4/20/2020 EMIL KYUPELYAN
Sewer availability Cleared 4/20/2020 EMIL KYUPELYAN
Eng Process Fee Ord 176,300 Cleared 4/21/2020 EMIL KYUPELYAN
Green Code Cleared 4/22/2020 AARON COSTA
CPC Cleared 5/5/2020 TERRI OSBORNE
Low Impact Development Cleared 10/9/2020 MITESH PATEL
Roof/Waste drainage to street Cleared 10/21/2020 ROSA SILVA
Construction near power lines Cleared 5/14/2021 RIDWAN HARDY
Roof/Waste drainage to street Cleared 12/1/2021 TREVOR QUAN

Contact Information

Contractor Ben Porat Moshe M; Lic. No.: 963181-B P O BOX 48603      LOS ANGELES, CA 90048
Engineer Sin,, John P; Lic. No.: C91162 122 N GRAMERCY PL      LOS ANGELES, CA 90004

Inspector Information

RONNIE MINDANAO, (213) 202-3252 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/11/2022 Not Ready for Inspection ADAM ESCOTO
METHANE-Barrier 7/11/2022 Not Ready for Inspection ADAM ESCOTO
METHANE-Rough 7/11/2022 Not Ready for Inspection ADAM ESCOTO
METHANE-Subgrade 7/11/2022 Not Ready for Inspection ADAM ESCOTO
PLUMBING-Rough 7/12/2022 Partial Approval ADAM ESCOTO
Deputy Other (see comments) 7/15/2022 Conditional Approval ADAM ESCOTO
Excavation/Setback/Form/Re-Bar 7/18/2022 Corrections Issued ADAM ESCOTO
METHANE-Barrier 7/18/2022 Approved ADAM ESCOTO
METHANE-Subgrade 7/18/2022 Approved ADAM ESCOTO
Excavation/Setback/Form/Re-Bar 7/21/2022 Approved ADAM ESCOTO
Floor/Roof Diaphrgm/Shear Wall 8/16/2022 Not Ready for Inspection MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 8/18/2022 Approved MICHAEL LEWIS
PLUMBING-Rough 9/1/2022 Corrections Issued STUART CHAPMAN
ELECTRICAL-Rough 9/7/2022 Approved MICHAEL LEWIS
PLUMBING-Rough 9/7/2022 Conditional Approval MICHAEL LEWIS
PLUMBING-Rough 9/9/2022 No Access for Inspection MICHAEL LEWIS
Special/Order Compliance 9/14/2022 Approved JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 10/7/2022 Partial Approval JOSEPH MCGARRY
HVAC-Rough 10/7/2022 Not Ready for Inspection JOSEPH MCGARRY
Wood Frame 10/7/2022 Not Ready for Inspection JOSEPH MCGARRY
METHANE-Final 10/12/2022 No Access for Inspection JOSEPH MCGARRY
METHANE-Rough 10/12/2022 Not Ready for Inspection JOSEPH MCGARRY
Insulation 10/24/2022 Partial Inspection MICHAEL LEWIS
Interior/Exterior Lathing 10/24/2022 Approved MICHAEL LEWIS
Shower Pan 10/24/2022 Approved MICHAEL LEWIS
BUILDING-Rough-Frame 10/27/2022 Corrections Issued JEFFREY MEAD
HVAC-Rough 10/27/2022 Corrections Issued JEFFREY MEAD
Insulation 10/27/2022 Not Ready for Inspection JEFFREY MEAD
PLUMBING-Rough 10/27/2022 Corrections Issued JEFFREY MEAD
HVAC-Rough 11/9/2022 Partial Approval MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 11/15/2022 Corrections Issued JOSEPH MCGARRY
HVAC-Rough 11/15/2022 Corrections Issued JOSEPH MCGARRY
Insulation 11/15/2022 Not Ready for Inspection JOSEPH MCGARRY
PLUMBING-Rough 11/15/2022 Approved JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 11/18/2022 Not Ready for Inspection STUART CHAPMAN
Insulation 11/18/2022 Not Ready for Inspection STUART CHAPMAN
Interior/Exterior Lathing 11/18/2022 Not Ready for Inspection STUART CHAPMAN
Floor/Roof Diaphrgm/Shear Wall 11/22/2022 Corrections Issued RICHARD DOCKUS
HVAC-Rough 11/22/2022 Approved RICHARD DOCKUS
Interior/Exterior Lathing 11/22/2022 Not Ready for Inspection RICHARD DOCKUS
Floor/Roof Diaphrgm/Shear Wall 11/24/2022 Partial Inspection RUBEN SALAS
Insulation 11/24/2022 Not Ready for Inspection RUBEN SALAS
Interior/Exterior Lathing 11/24/2022 Not Ready for Inspection RUBEN SALAS
Drywall Nailing 12/5/2022 Corrections Issued RICHARD DOCKUS
Green Building Rough 12/5/2022 Approved RICHARD DOCKUS
BUILDING-Rough-Frame 12/9/2022 Not Ready for Inspection RICHARD DOCKUS
Interior/Exterior Lathing 12/9/2022 Not Ready for Inspection RICHARD DOCKUS
METHANE-Rough 12/9/2022 Approved RICHARD DOCKUS
Drywall Nailing 12/14/2022 Conditional Approval RICHARD DOCKUS
Insulation 12/14/2022 Conditional Approval RICHARD DOCKUS
Interior/Exterior Lathing 12/14/2022 Conditional Approval RICHARD DOCKUS
Wood Frame 12/14/2022 Corrections Issued RICHARD DOCKUS
BUILDING-Rough-Frame 2/22/2023 Approved RICHARD DOCKUS
Drywall Nailing 2/22/2023 Approved RICHARD DOCKUS
ELECTRICAL-Final 2/22/2023 Approved RICHARD DOCKUS
Footing/Foundation/Slab 2/22/2023 Approved RICHARD DOCKUS
Green Building Final 2/22/2023 Approved RICHARD DOCKUS
SGSOV-Seismic Gas S/O Valve 2/22/2023 SGSOV Approved RICHARD DOCKUS
Smoke Detectors 2/22/2023 Approved RICHARD DOCKUS
Final 3/6/2023 Corrections Issued RICHARD DOCKUS
Final 5/18/2023 OK to Issue CofO RICHARD DOCKUS