13429 W TIARA ST 91401

Certificate Information: 13429 W TIARA ST 91401

Application / Permit
20014-20000-00539
Plan Check / Job No.
B20VN02097
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REFRAME ENTIRE ROOF; ADD IRR. SHAPE 28''-9" x 30'-8" BDRM/CLOSET AND 37'-3" X 16'-6" ATTACHED PATIO COVER PER DESIGN
Permit Issued
Issued on 2/7/2020
Issuing Office
Valley
Current Status
Issued on 2/7/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 2/7/2020 APPLICANT
Assigned to Plan Check Engineer 2/7/2020 ALDOUS CHIC
Corrections Issued 2/7/2020 ALDOUS CHIC
Plan Check Approved 2/7/2020 ANGELICA MARTINEZ
Issued 2/7/2020 LADBS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/7/2020 JOHN TRIANTAFYLLOS
Low Impact Development Cleared 2/7/2020 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 2/7/2020 JOHN TRIANTAFYLLOS
Sewer availability Cleared 2/7/2020 JOHN TRIANTAFYLLOS

Contact Information

Contractor Owner-Builder       ,
Engineer Khatchadourian,, Vicken; Lic. No.: S3141 1221 N CEDAR ST      GLENDALE, CA 92107

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/11/2020 Partial Approval GREG ALLTON
Floor/Roof Diaphrgm/Shear Wall 3/4/2020 Partial Approval GREG ALLTON
PLUMBING-Rough 4/1/2020 Approved JOHN HAYES
ELECTRICAL-Rough 4/2/2020 Approved MISAEL ESPARZA
HVAC-Rough 4/2/2020 Corrections Issued MISAEL ESPARZA
BUILDING-Rough-Frame 4/8/2020 Corrections Issued BRENDAN LOONEY
Green Building Rough 4/8/2020 Corrections Issued BRENDAN LOONEY
HVAC-Rough 4/8/2020 Approved BRENDAN LOONEY
METHANE-Rough 4/8/2020 Approved BRENDAN LOONEY
Shower Pan 4/8/2020 Approved BRENDAN LOONEY
BUILDING-Rough-Frame 5/24/2021 Conditional Approval RICHARD DOCKUS
Drywall Nailing 5/24/2021 Conditional Approval RICHARD DOCKUS
Footing/Foundation/Slab 5/24/2021 Approved RICHARD DOCKUS
Green Building Final 5/24/2021 Approved RICHARD DOCKUS
Green Building Rough 5/24/2021 Approved RICHARD DOCKUS
METHANE-Barrier 5/24/2021 Approved RICHARD DOCKUS
METHANE-Subgrade 5/24/2021 Approved RICHARD DOCKUS
SGSOV-Seismic Gas S/O Valve 5/24/2021 SGSOV Not Ready RICHARD DOCKUS
Smoke Detectors 5/24/2021 Approved RICHARD DOCKUS
ELECTRICAL-Final 4/20/2022 Approved CHRISTOPHE COCHRAN
HVAC-Final 4/20/2022 Approved CHRISTOPHE COCHRAN
PLUMBING-Final 4/20/2022 Approved CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 7/6/2022 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 7/6/2022 Not Ready for Inspection RAFAEL CORTES
Final 7/6/2022 Not Ready for Inspection RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 7/6/2022 SGSOV Approved RAFAEL CORTES
BUILDING-Rough-Frame 11/8/2022 Not Ready for Inspection JOHN HAYES
Drywall Nailing 11/8/2022 Not Ready for Inspection JOHN HAYES
Final 11/8/2022 Corrections Issued JOHN HAYES
BUILDING-Rough-Frame 1/19/2023 Approved JOHN COLEMAN
Drywall Nailing 1/19/2023 Approved JOHN COLEMAN
Final 1/19/2023 Corrections Issued JOHN COLEMAN
Final 4/7/2023 Not Ready for Inspection JOHN COLEMAN