6258 N RIVERTON AVE 91606

Certificate Information: 6258 N RIVERTON AVE 91606

Application / Permit
20014-20000-00296
Plan Check / Job No.
B20VN01119
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED 14'-6" x 44'-0" IRREGULAR SHAPED ADDITION TO (E)SINGLE FAMILY DWELLING. ENCLOSE 3'-0" x 4'-6" PORTION OF (E) ENTRY PORCH TO CREATE A POWDER ROOM PER PLAN. INTERIOR REMODEL TO ADD TWO BEDROOMS AND A BATHROOM. REMODEL THE (E) KITCHEN AND RELOCATE THE DINING ROOM AND LIVING ROOM PER PLAN. ALL WORK PER ENGINEERING DESIGN.
Permit Issued
Issued on 5/22/2020
Issuing Office
Current Status
CofO Issued on 8/15/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/23/2020 APPLICANT
Assigned to Plan Check Engineer 1/23/2020 SARKIS HARABEDIAN
Corrections Issued 1/23/2020 SARKIS HARABEDIAN
Plan Check Approved 5/15/2020 SARKIS HARABEDIAN
Issued 5/22/2020 APPLICANT
Building Plans Picked Up 6/8/2020 APPLICANT
CofO in Progress 3/19/2021 DANIEL DREW
Permit Finaled 8/15/2022 DANIEL ORRANTE
CofO Issued 8/15/2022 DANIEL ORRANTE
Permit Finaled 8/15/2022 DANIEL ORRANTE

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 5/11/2020 GUILLERMO PETRA
Eng Process Fee Ord 176,300 Cleared 5/12/2020 GUILLERMO PETRA
Sewer availability Cleared 5/12/2020 GUILLERMO PETRA

Contact Information

Contractor Owner-Builder       ,
Engineer Adams,, Robert Charles; Lic. No.: C21234 22129 BRYANT STREET      CANOGA PARK, CA 91304

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 7/31/2020 Approved RAYMOND KEHOE
Footing/Foundation/Slab 8/6/2020 Approved DANIEL DREW
Wood Frame 8/31/2020 Approved DANIEL DREW
Floor/Roof Diaphrgm/Shear Wall 9/4/2020 Approved DANIEL DREW
Insulation 9/4/2020 Approved DANIEL DREW
Floor/Roof Diaphrgm/Shear Wall 10/6/2020 Corrections Issued DANIEL DREW
HVAC-Rough 10/6/2020 Approved DANIEL DREW
ELECTRICAL-Rough 10/9/2020 Not Ready for Inspection DANIEL DREW
HVAC-Rough 10/9/2020 Approved DANIEL DREW
PLUMBING-Rough 10/9/2020 Corrections Issued DANIEL DREW
Wood Frame 10/9/2020 Conditional Approval DANIEL DREW
BUILDING-Rough-Frame 10/15/2020 Approved DANIEL DREW
ELECTRICAL-Final 10/15/2020 Approved DANIEL DREW
Green Building Rough 10/15/2020 Approved DANIEL DREW
Interior/Exterior Lathing 10/15/2020 Approved DANIEL DREW
PLUMBING-Rough 10/15/2020 Approved DANIEL DREW
Insulation 10/19/2020 Approved DANIEL DREW
Drywall Nailing 10/27/2020 Approved MICHEL ABAJAN
Final 3/9/2021 Corrections Issued DANIEL DREW
Green Building Final 3/9/2021 Approved DANIEL DREW
SGSOV-Seismic Gas S/O Valve 3/9/2021 SGSOV Not Ready DANIEL DREW
Smoke Detectors 3/9/2021 Approved DANIEL DREW
Final 3/18/2021 OK to Issue CofO DANIEL DREW
SGSOV-Seismic Gas S/O Valve 3/18/2021 SGSOV Approved DANIEL DREW