605 W 43RD PL 90037

Certificate Information: 605 W 43RD PL 90037

Application / Permit
20014-20000-00256
Plan Check / Job No.
B20VN00971
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ENCLOSE 6'-0" x 12'-1" PORTION OF (E) PORCH TO EXTEND MASTER BEDROOM AND INTERIOR REMODEL TO THE (E) SINGLE FAMILY DWELLING. REMODEL (E) KITCHEN AND TWO BATHROOMS.
Permit Issued
Issued on 10/15/2020
Issuing Office
Current Status
Permit Finaled on 2/28/2022

Permit Application Status History

Submitted 1/22/2020 APPLICANT
Assigned to Plan Check Engineer 1/22/2020 SARKIS HARABEDIAN
Plan Check Approved 1/22/2020 SARKIS HARABEDIAN
No Progress 9/3/2020 SARKIS HARABEDIAN
Plan Check Approved 9/3/2020 SARKIS HARABEDIAN
Issued 10/15/2020 APPLICANT
Permit Finaled 2/25/2022 HORACE FULTZ

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,
Engineer Tabar,, Mehrdad; Lic. No.: C37433 14252 CULVER DR A349      IRVINE, CA 92604

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 12/8/2020 Approved ROBERT MCDOWELL
Footing/Foundation/Slab 12/8/2020 Approved ROBERT MCDOWELL
HVAC-Rough 12/8/2020 Approved ROBERT MCDOWELL
PLUMBING-Rough 12/8/2020 Approved ROBERT MCDOWELL
Insulation 12/17/2020 Approved ROBERT MCDOWELL
Drywall Nailing 2/3/2021 Approved ROBERT MCDOWELL
Interior/Exterior Lathing 3/9/2021 Approved ROBERT MCDOWELL
BUILDING-Rough-Frame 4/9/2021 Approved ROBERT MCDOWELL
MERV13>=Final 4/9/2021 Not Ready for Inspection ROBERT MCDOWELL
MERV13>=Rough 4/9/2021 Approved ROBERT MCDOWELL
SGSOV-Seismic Gas S/O Valve 4/9/2021 SGSOV Not Ready ROBERT MCDOWELL
Service/Power Release 4/9/2021 Approved ROBERT MCDOWELL
Smoke Detectors 4/9/2021 Not Ready for Inspection ROBERT MCDOWELL
Shower Pan 9/9/2021 Not Ready for Inspection SABAS ALONSO
Interior/Exterior Lathing 9/16/2021 Approved SABAS ALONSO
Shower Pan 9/16/2021 Not Ready for Inspection SABAS ALONSO
Shower Pan 10/12/2021 Approved SABAS ALONSO
ELECTRICAL-Final 2/4/2022 Corrections Issued SABAS ALONSO
ELECTRICAL-Rough 2/4/2022 Approved SABAS ALONSO
Final 2/4/2022 Corrections Issued SABAS ALONSO
HVAC-Final 2/4/2022 Corrections Issued SABAS ALONSO
MERV13>=Final 2/4/2022 Approved SABAS ALONSO
PLUMBING-Final 2/4/2022 Approved SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 2/4/2022 SGSOV Approved SABAS ALONSO
Smoke Detectors 2/4/2022 Approved SABAS ALONSO
ELECTRICAL-Final 2/25/2022 Approved HORACE FULTZ
Final 2/25/2022 Permit Finaled HORACE FULTZ
HVAC-Final 2/25/2022 Approved HORACE FULTZ