232 E WATERVIEW ST 90293
Certificate Information: 232 E WATERVIEW ST 90293
- Application / Permit
- 20014-20000-00247
- Plan Check / Job No.
- B20VN00936
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- NEW 3'8" X 8' FRONT PORCH ADDITION , NEW 7'11" X 14' ADDITION TO (E) 1 CAR GARAGE TO ENLARGE THE 1 CAR GARAGE , NEW 8'4" X 8'10" REAR ADDITION TO FIRST FLOOR TO ENLARGE THE LIVING ROOM , NEW 14' X 13'3" SECOND FLOOR ADDITION TO CREATE A NEW BEDROOM , NEW 14'1" X 3'6" SECOND FLOOR REAR ADDITION TO ENLARGE THE BEDROOM , INTERIOR REMODEL TO (E) SFD TO ENCLOSE 2'10" X 11'10" PORTION OF 2ND FLOOR BALCONY AS PART OF THE LIVABLE SPACE TO ENLARGE MASTER BATHROOM , REMODEL KITCHEN , DINING , LIVING ROOM , CREATE NEW POWDER ROOM , CONVERT (E) BEDROOM INTO NEW FOYER, (1) BEDROOM AT 1ST FLOOR , REMODEL BATHROOM , CREATE NEW LAUNDRY ROOM , NEW MASTER BATHROOM , NEW MASTER W.I.C., REMODEL MASTER BEDROOM AND BATHROOM AT 2ND FLOOR, DOORS AND WINDOWS CHANGEOUT, Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing 15 Squares.. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). , ALL WORK PER ENGINEERING
- Permit Issued
- Issued on 3/12/2020
- Issuing Office
- Valley
- Current Status
- CofO Issued on 10/25/2020
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 1/21/2020 | APPLICANT |
| Assigned to Plan Check Engineer | 1/30/2020 | RARES BODEA |
| Green Plans Picked Up | 1/30/2020 | APPLICANT |
| Corrections Issued | 2/2/2020 | RARES BODEA |
| Quality Review Completed | 2/3/2020 | GUANG MIN TUNG |
| Building Plans Picked Up | 2/11/2020 | APPLICANT |
| Applicant returned to address corrections | 3/3/2020 | RARES BODEA |
| Plan Check Approved | 3/12/2020 | RARES BODEA |
| Issued | 3/12/2020 | LADBS |
| CofO in Progress | 10/24/2020 | PIERRE VEGA |
| CofO in Progress | 10/24/2020 | PIERRE VEGA |
| CofO Issued | 10/25/2020 | VINCENT COTTON |
| Permit Finaled | 10/25/2020 | VINCENT COTTON |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 2/2/2020 | RARES BODEA |
| Eng Process Fee Ord 176,300 | Cleared | 3/3/2020 | LEE GUILBEAUX |
| Sewer availability | Cleared | 3/3/2020 | LEE GUILBEAUX |
| Public Works-Highway Ded. | Cleared | 3/3/2020 | LEE GUILBEAUX |
| Green Code | Cleared | 3/6/2020 | AARON COSTA |
| Hydrant and Access approval | Cleared | 3/6/2020 | GEORGE SUCHAND |
| Roof/Waste drainage to street | Cleared | 3/6/2020 | MARKOS PEREZ-BRAN |
| ZA Case | Cleared | 3/6/2020 | PABLO ESTRADA |
| Coastal Zone | Cleared | 3/11/2020 | SHEILA GERSHON |
| Miscellaneous | Cleared | 3/11/2020 | SHEILA GERSHON |
| Miscellaneous | Cleared | 3/11/2020 | SHEILA GERSHON |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Basma,, Ali J; Lic. No.: C53080 | 21500 WYANDOTTE ST 106 CANOGA PARK, CA 91303 |
Inspector Information
| MICHAEL LEWIS, (310) 914-3979 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Drilled-In Anchors | 3/16/2020 | Conditional Approval | JUAN VALENZUELA |
| Excavation/Setback/Form/Re-Bar | 3/17/2020 | Approved | JUAN VALENZUELA |
| Footing/Foundation/Slab | 3/17/2020 | Approved | JUAN VALENZUELA |
| METHANE-Barrier | 3/17/2020 | Approved | JUAN VALENZUELA |
| METHANE-Subgrade | 3/17/2020 | Approved | JUAN VALENZUELA |
| Deputy Wood Construction | 3/27/2020 | Conditional Approval | JUAN VALENZUELA |
| Deputy Drilled-In Anchors | 4/21/2020 | Conditional Approval | CRAIG DAVIS |
| Deputy Wood Construction | 4/21/2020 | Conditional Approval | CRAIG DAVIS |
| Floor/Roof Diaphrgm/Shear Wall | 4/22/2020 | Partial Approval | JUAN VALENZUELA |
| Floor/Roof Diaphrgm/Shear Wall | 4/28/2020 | Approved | JUAN VALENZUELA |
| Insulation | 5/4/2020 | Not Ready for Inspection | JUAN VALENZUELA |
| Interior/Exterior Lathing | 5/4/2020 | Partial Approval | JUAN VALENZUELA |
| ELECTRICAL-Rough | 5/6/2020 | Corrections Issued | JUAN VALENZUELA |
| HVAC-Rough | 5/6/2020 | Conditional Approval | JUAN VALENZUELA |
| PLUMBING-Rough | 5/6/2020 | Corrections Issued | JUAN VALENZUELA |
| ELECTRICAL-Rough | 5/11/2020 | Approved | DAVID HEINE |
| HVAC-Rough | 5/11/2020 | Approved | DAVID HEINE |
| Insulation | 5/11/2020 | Approved | DAVID HEINE |
| PLUMBING-Rough | 5/11/2020 | Approved | DAVID HEINE |
| Drywall Nailing | 5/19/2020 | Approved | JOHNNY MIRANDA |
| Green Building Rough | 5/19/2020 | Approved | JOHNNY MIRANDA |
| BUILDING-Rough-Frame | 8/27/2020 | Corrections Issued | CRAIG DAVIS |
| Final | 8/27/2020 | Corrections Issued | CRAIG DAVIS |
| Green Building Final | 8/27/2020 | Corrections Issued | CRAIG DAVIS |
| METHANE-Final | 8/27/2020 | Not Ready for Inspection | CRAIG DAVIS |
| METHANE-Rough | 8/27/2020 | Not Ready for Inspection | CRAIG DAVIS |
| SGSOV-Seismic Gas S/O Valve | 8/27/2020 | SGSOV Not Ready | CRAIG DAVIS |
| Smoke Detectors | 8/27/2020 | Approved | CRAIG DAVIS |
| BUILDING-Rough-Frame | 9/1/2020 | Not Ready for Inspection | JUAN VALENZUELA |
| Final | 9/1/2020 | Corrections Issued | JUAN VALENZUELA |
| Green Building Final | 9/1/2020 | Not Ready for Inspection | JUAN VALENZUELA |
| METHANE-Final | 9/1/2020 | Not Ready for Inspection | JUAN VALENZUELA |
| METHANE-Rough | 9/1/2020 | Not Ready for Inspection | JUAN VALENZUELA |
| SGSOV-Seismic Gas S/O Valve | 9/1/2020 | SGSOV Not Ready | JUAN VALENZUELA |
| BUILDING-Rough-Frame | 10/14/2020 | Approved | JUAN VALENZUELA |
| ELECTRICAL-Final | 10/14/2020 | Approved | JUAN VALENZUELA |
| Final | 10/14/2020 | OK to Issue CofO | JUAN VALENZUELA |
| Green Building Final | 10/14/2020 | Approved | JUAN VALENZUELA |
| HVAC-Final | 10/14/2020 | Approved | JUAN VALENZUELA |
| METHANE-Rough | 10/14/2020 | Approved | JUAN VALENZUELA |
| PLUMBING-Final | 10/14/2020 | Approved | JUAN VALENZUELA |
| SGSOV-Seismic Gas S/O Valve | 10/14/2020 | SGSOV Approved | JUAN VALENZUELA |