232 E WATERVIEW ST 90293

Certificate Information: 232 E WATERVIEW ST 90293

Application / Permit
20014-20000-00247
Plan Check / Job No.
B20VN00936
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 3'8" X 8' FRONT PORCH ADDITION , NEW 7'11" X 14' ADDITION TO (E) 1 CAR GARAGE TO ENLARGE THE 1 CAR GARAGE , NEW 8'4" X 8'10" REAR ADDITION TO FIRST FLOOR TO ENLARGE THE LIVING ROOM , NEW 14' X 13'3" SECOND FLOOR ADDITION TO CREATE A NEW BEDROOM , NEW 14'1" X 3'6" SECOND FLOOR REAR ADDITION TO ENLARGE THE BEDROOM , INTERIOR REMODEL TO (E) SFD TO ENCLOSE 2'10" X 11'10" PORTION OF 2ND FLOOR BALCONY AS PART OF THE LIVABLE SPACE TO ENLARGE MASTER BATHROOM , REMODEL KITCHEN , DINING , LIVING ROOM , CREATE NEW POWDER ROOM , CONVERT (E) BEDROOM INTO NEW FOYER, (1) BEDROOM AT 1ST FLOOR , REMODEL BATHROOM , CREATE NEW LAUNDRY ROOM , NEW MASTER BATHROOM , NEW MASTER W.I.C., REMODEL MASTER BEDROOM AND BATHROOM AT 2ND FLOOR, DOORS AND WINDOWS CHANGEOUT, Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing 15 Squares.. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). , ALL WORK PER ENGINEERING
Permit Issued
Issued on 3/12/2020
Issuing Office
Valley
Current Status
CofO Issued on 10/25/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/21/2020 APPLICANT
Assigned to Plan Check Engineer 1/30/2020 RARES BODEA
Green Plans Picked Up 1/30/2020 APPLICANT
Corrections Issued 2/2/2020 RARES BODEA
Quality Review Completed 2/3/2020 GUANG MIN TUNG
Building Plans Picked Up 2/11/2020 APPLICANT
Applicant returned to address corrections 3/3/2020 RARES BODEA
Plan Check Approved 3/12/2020 RARES BODEA
Issued 3/12/2020 LADBS
CofO in Progress 10/24/2020 PIERRE VEGA
CofO in Progress 10/24/2020 PIERRE VEGA
CofO Issued 10/25/2020 VINCENT COTTON
Permit Finaled 10/25/2020 VINCENT COTTON

Permit Application Clearance Information

Grading Pre-Inspection Cleared 2/2/2020 RARES BODEA
Eng Process Fee Ord 176,300 Cleared 3/3/2020 LEE GUILBEAUX
Sewer availability Cleared 3/3/2020 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 3/3/2020 LEE GUILBEAUX
Green Code Cleared 3/6/2020 AARON COSTA
Hydrant and Access approval Cleared 3/6/2020 GEORGE SUCHAND
Roof/Waste drainage to street Cleared 3/6/2020 MARKOS PEREZ-BRAN
ZA Case Cleared 3/6/2020 PABLO ESTRADA
Coastal Zone Cleared 3/11/2020 SHEILA GERSHON
Miscellaneous Cleared 3/11/2020 SHEILA GERSHON
Miscellaneous Cleared 3/11/2020 SHEILA GERSHON

Contact Information

Contractor Owner-Builder       ,
Engineer Basma,, Ali J; Lic. No.: C53080 21500 WYANDOTTE ST 106      CANOGA PARK, CA 91303

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/16/2020 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 3/17/2020 Approved JUAN VALENZUELA
Footing/Foundation/Slab 3/17/2020 Approved JUAN VALENZUELA
METHANE-Barrier 3/17/2020 Approved JUAN VALENZUELA
METHANE-Subgrade 3/17/2020 Approved JUAN VALENZUELA
Deputy Wood Construction 3/27/2020 Conditional Approval JUAN VALENZUELA
Deputy Drilled-In Anchors 4/21/2020 Conditional Approval CRAIG DAVIS
Deputy Wood Construction 4/21/2020 Conditional Approval CRAIG DAVIS
Floor/Roof Diaphrgm/Shear Wall 4/22/2020 Partial Approval JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 4/28/2020 Approved JUAN VALENZUELA
Insulation 5/4/2020 Not Ready for Inspection JUAN VALENZUELA
Interior/Exterior Lathing 5/4/2020 Partial Approval JUAN VALENZUELA
ELECTRICAL-Rough 5/6/2020 Corrections Issued JUAN VALENZUELA
HVAC-Rough 5/6/2020 Conditional Approval JUAN VALENZUELA
PLUMBING-Rough 5/6/2020 Corrections Issued JUAN VALENZUELA
ELECTRICAL-Rough 5/11/2020 Approved DAVID HEINE
HVAC-Rough 5/11/2020 Approved DAVID HEINE
Insulation 5/11/2020 Approved DAVID HEINE
PLUMBING-Rough 5/11/2020 Approved DAVID HEINE
Drywall Nailing 5/19/2020 Approved JOHNNY MIRANDA
Green Building Rough 5/19/2020 Approved JOHNNY MIRANDA
BUILDING-Rough-Frame 8/27/2020 Corrections Issued CRAIG DAVIS
Final 8/27/2020 Corrections Issued CRAIG DAVIS
Green Building Final 8/27/2020 Corrections Issued CRAIG DAVIS
METHANE-Final 8/27/2020 Not Ready for Inspection CRAIG DAVIS
METHANE-Rough 8/27/2020 Not Ready for Inspection CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 8/27/2020 SGSOV Not Ready CRAIG DAVIS
Smoke Detectors 8/27/2020 Approved CRAIG DAVIS
BUILDING-Rough-Frame 9/1/2020 Not Ready for Inspection JUAN VALENZUELA
Final 9/1/2020 Corrections Issued JUAN VALENZUELA
Green Building Final 9/1/2020 Not Ready for Inspection JUAN VALENZUELA
METHANE-Final 9/1/2020 Not Ready for Inspection JUAN VALENZUELA
METHANE-Rough 9/1/2020 Not Ready for Inspection JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 9/1/2020 SGSOV Not Ready JUAN VALENZUELA
BUILDING-Rough-Frame 10/14/2020 Approved JUAN VALENZUELA
ELECTRICAL-Final 10/14/2020 Approved JUAN VALENZUELA
Final 10/14/2020 OK to Issue CofO JUAN VALENZUELA
Green Building Final 10/14/2020 Approved JUAN VALENZUELA
HVAC-Final 10/14/2020 Approved JUAN VALENZUELA
METHANE-Rough 10/14/2020 Approved JUAN VALENZUELA
PLUMBING-Final 10/14/2020 Approved JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 10/14/2020 SGSOV Approved JUAN VALENZUELA