7115-7117 W MACAPA DR 90068

Certificate Information: 7115-7117 W MACAPA DR 90068

Application / Permit
20014-20000-00203
Plan Check / Job No.
B20VN00819
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) 21'-8" X 19'-6" ADDITION ON 1ST FLOOR, (N) 42'-0" X 24'-6" TRELLIS ON FIRST FLOOR AND IRREGULAR SHAPED 64'-10" X 51'-8" 2ND FLOOR ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) and (e) WITH TRELLIS AND DECK ON 2ND FLOOR, AND (N) ROOFTOP DECK ABOVE THE ACCESSORY DWELLING UNIT ALL WORK PER ENGINEERING. NFPA 13D FIRE SPRINKLERS REQUIRED
Permit Issued
Issued on 6/5/2021
Issuing Office
Current Status
CofO Issued on 1/11/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/17/2020 APPLICANT
Assigned to Plan Check Engineer 2/27/2020 SEWADA ZADOORIAN MILAGARDI
Corrections Issued 3/6/2020 SEWADA ZADOORIAN MILAGARDI
Quality Review Completed 3/16/2020 OMID HEDAYAT
Building Plans Picked Up 3/17/2020 APPLICANT
Green Plans Picked Up 3/18/2020 APPLICANT
Applicant returned to address corrections 3/4/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 5/6/2021 SEWADA ZADOORIAN MILAGARDI
Plan Check Approved 5/24/2021 SEWADA ZADOORAN MILAGARDI
Issued 6/5/2021 APPLICANT
CofO in Progress 10/31/2022 BRIAN SULLIVAN
Permit Finaled 1/11/2023 DEROLD HAUFF
CofO Issued 1/11/2023 DEROLD HAUFF
Permit Finaled 1/11/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 3/20/2020 ADRIAN CASTRO
BHO/Hillside ordinance Cleared 3/20/2020 ADRIAN CASTRO
BHO/Hillside ordinance Cleared 3/20/2020 ADRIAN CASTRO
BHO/Hillside ordinance Cleared 3/20/2020 ADRIAN CASTRO
BHO/Hillside ordinance Cleared 3/20/2020 ADRIAN CASTRO
BHO/Hillside ordinance Cleared 3/20/2020 ADRIAN CASTRO
Distance to fire station Cleared 3/20/2020 JOHN CONNEALLY
Eng Process Fee Ord 176,300 Cleared 3/20/2020 ADRIAN CASTRO
Hydrant and Access approval Cleared 3/20/2020 JOHN CONNEALLY
Miscellaneous Cleared 3/20/2020 ADRIAN CASTRO
Sewer availability Cleared 3/20/2020 ADRIAN CASTRO
Specific Plan Cleared 4/21/2020 TRACY WILLIAMS
Green Code Cleared 5/20/2020 DAVID MATSON
Low Impact Development Cleared 6/18/2020 MITESH PATEL
Roof/Waste drainage to street Cleared 6/25/2020 JOHN TRIANTAFYLLOS
Grading Pre-Inspection Cleared 9/3/2020 TIMOTHY POWELL
Street Frontage Cleared 5/10/2021 ADRIAN CASTRO
GPI Written Notices Cleared 5/24/2021 SEWADA ZADOORAN MILAGARDI

Contact Information

Architect Lopez,, Craig Joseph; Lic. No.: C14263 155 GRANADA ST STE "L"      CAMARILLO, CA 93010
Contractor Owner-Builder       ,

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Special/Order Compliance 7/30/2021 Approved BRAD BESCOS
Special/Order Compliance 8/5/2021 Partial Inspection BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 9/9/2021 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 9/9/2021 Approved BRIAN SULLIVAN
Deputy Steel/Welding 9/17/2021 No Access for Inspection BRAD BESCOS
Deputy Steel/Welding 9/27/2021 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 9/27/2021 Approved BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 9/27/2021 Partial Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 10/8/2021 Partial Approval BRIAN SULLIVAN
Deputy Steel/Welding 10/13/2021 Conditional Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 10/29/2021 Partial Approval BRIAN SULLIVAN
Deputy Steel/Welding 11/5/2021 Conditional Approval BRIAN SULLIVAN
PLUMBING-Rough 3/1/2022 Partial Approval BRIAN SULLIVAN
Shower Pan 3/11/2022 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 3/17/2022 Partial Approval ALIZAH MAYAGOITIA
HVAC-Rough 4/1/2022 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Rough 4/4/2022 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 4/7/2022 Corrections Issued BRIAN SULLIVAN
PLUMBING-Rough 4/7/2022 Corrections Issued BRIAN SULLIVAN
BUILDING-Rough-Frame 5/4/2022 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Rough 5/4/2022 Approved BRIAN SULLIVAN
Green Building Rough 5/4/2022 Approved BRIAN SULLIVAN
PLUMBING-Rough 5/4/2022 Approved BRIAN SULLIVAN
Rough-Elec/Plmb/HVAC 5/4/2022 Approved BRIAN SULLIVAN
Verify Sprinkler Sign Off 5/4/2022 Approved BRIAN SULLIVAN
Insulation 5/6/2022 Partial Approval BRIAN SULLIVAN
Drywall Nailing 5/16/2022 Approved STUART CHAPMAN
Interior/Exterior Lathing 5/23/2022 Partial Approval BRIAN SULLIVAN
HVAC-Rough 9/23/2022 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 10/24/2022 Approved BRIAN SULLIVAN
Final 10/24/2022 Corrections Issued BRIAN SULLIVAN
Green Building Final 10/24/2022 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 10/24/2022 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 10/24/2022 Corrections Issued BRIAN SULLIVAN
Final 10/28/2022 OK to Issue CofO BRIAN SULLIVAN
Smoke Detectors 10/28/2022 Approved BRIAN SULLIVAN