1108 W 83RD ST 90044

Certificate Information: 1108 W 83RD ST 90044

Application / Permit
20014-20000-00068
Plan Check / Job No.
B20VN00293
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
PROPOSED 25'-9" x 25'-0" IRREGULAR SHAPED ADDITION TO AND CONVERT (E) DETACHED ONE CAR GARAGE TO ACCESSORY DWELLING UNIT. ALL WORK DONE PER WFPP.
Permit Issued
Issued on 3/17/2020
Issuing Office
South Los Angeles
Current Status
CofO Corrected on 7/12/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/8/2020 APPLICANT
Green Plans Picked Up 2/12/2020 APPLICANT
Assigned to Plan Check Engineer 2/13/2020 SARKIS HARABEDIAN
Corrections Issued 2/13/2020 SARKIS HARABEDIAN
Building Plans Picked Up 2/18/2020 APPLICANT
Plan Check Approved 3/3/2020 SARKIS HARABEDIAN
Issued 3/17/2020 LADBS
CofO in Progress 8/1/2022 RYAN SALAZAR
CofO Issued-Status Void 2/27/2023 DANIEL ORRANTE
Permit Finaled-Status Void 2/27/2023 DANIEL ORRANTE
Re-Activate Permit 7/12/2024 DANIEL ORRANTE
Permit Finaled 7/12/2024 DANIEL ORRANTE
CofO Corrected 7/12/2024 DANIEL ORRANTE
Permit Finaled 7/12/2024 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 2/27/2020 ERIK BEASLEY
Eng Process Fee Ord 176,300 Cleared 2/27/2020 ERIK BEASLEY
Low Impact Development Cleared 2/27/2020 ORVAL HERNANDEZ-MARCIAL
Roof/Waste drainage to street Cleared 2/27/2020 ERIK BEASLEY
Sewer availability Cleared 2/27/2020 ERIK BEASLEY
Green Code Cleared 3/2/2020 MICHAEL AYERS
Hydrant and Access approval Cleared 3/3/2020 GEORGE SUCHAND

Contact Information

Contractor Arrow Construction Co; Lic. No.: 573067-B 18729 CLARK DALE AVE #C      ARTESIA, CA 90701

Inspector Information

JOHN QUINTANILLA, (213) 792-6055 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/11/2020 Approved EUGENE CASSIDY
Footing/Foundation/Slab 5/14/2020 Approved EUGENE CASSIDY
Floor/Roof Diaphrgm/Shear Wall 5/29/2020 Partial Approval BRIAN CHRISTIAN
ELECTRICAL-Rough 6/26/2020 Approved BRIAN CHRISTIAN
Floor/Roof Diaphrgm/Shear Wall 6/26/2020 Approved BRIAN CHRISTIAN
Green Building Rough 6/26/2020 Not Ready for Inspection BRIAN CHRISTIAN
HVAC-Rough 6/26/2020 Not Ready for Inspection BRIAN CHRISTIAN
PLUMBING-Rough 6/26/2020 Approved BRIAN CHRISTIAN
BUILDING-Rough-Frame 6/30/2020 Approved BRIAN CHRISTIAN
Green Building Rough 6/30/2020 Approved BRIAN CHRISTIAN
HVAC-Rough 6/30/2020 Approved BRIAN CHRISTIAN
Insulation 6/30/2020 Approved BRIAN CHRISTIAN
Drywall Nailing 7/1/2020 Not Ready for Inspection SABAS ALONSO
Interior/Exterior Lathing 7/1/2020 Approved SABAS ALONSO
Drywall Nailing 7/9/2020 Approved THOMAS LOGRASSO
Final 8/6/2020 Not Ready for Inspection FREDDIE RIVERA
Green Building Final 8/6/2020 Not Ready for Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 8/6/2020 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 8/6/2020 Not Ready for Inspection FREDDIE RIVERA
Final 8/13/2020 Corrections Issued FREDDIE RIVERA
Green Building Final 8/13/2020 Not Ready for Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 8/13/2020 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 8/13/2020 Approved FREDDIE RIVERA
Pre-Inspection 8/17/2020 Corrections Issued FREDDIE RIVERA
Special/Order Compliance 9/16/2020 Not Ready for Inspection DAVID FEILER
PLUMBING-Final 3/26/2021 Corrections Issued JOHN KLARIN
SGSOV-Seismic Gas S/O Valve 4/21/2021 SGSOV Not Ready FREDDIE RIVERA
ELECTRICAL-Final 7/22/2021 Not Ready for Inspection JESUS PINEDA
ELECTRICAL-Rough 7/22/2021 Not Ready for Inspection JESUS PINEDA
Green Building Final 7/22/2021 Not Ready for Inspection JESUS PINEDA
HVAC-Rough 7/22/2021 Not Ready for Inspection JESUS PINEDA
PLUMBING-Final 7/22/2021 Not Ready for Inspection JESUS PINEDA
Final 7/18/2022 Not Ready for Inspection RYAN SALAZAR
Green Building Final 7/18/2022 Approved RYAN SALAZAR
SGSOV-Seismic Gas S/O Valve 7/18/2022 SGSOV Approved RYAN SALAZAR
Final 7/29/2022 OK to Issue CofO RYAN SALAZAR