100 S THE GROVE DR 90036

Certificate Information: 100 S THE GROVE DR 90036

Application / Permit
20014-10000-05704
Plan Check / Job No.
B20LA23715
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(4) Museum non-profit
Work Description
PROPOSED MAJOR ADDITOIN TO EXISTING MUSEAM INCLUDING CANOPY, CHANGE TYPE OF CONSTRUCTION FROM II-A TO II-B.
Permit Issued
Issued on 9/1/2023
Issuing Office
Metro
Current Status
Issued on 9/1/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 2/4/2021 APPLICANT
Assigned to Plan Check Engineer 2/10/2021 ARMEN JIVALAGIAN
Corrections Issued 2/17/2021 ARMEN JIVALAGIAN
Building Plans Picked Up 2/22/2021 APPLICANT
Quality Review Completed 2/26/2021 ALLEN MANALANSAN
Applicant returned to address corrections 4/16/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/17/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/23/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 9/3/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 7/8/2022 ARMEN JIVALAGIAN
Plan Check Approved 8/29/2023 ARMEN JIVALAGIAN
Issued 9/1/2023 APPLICANT
TCO Issued (Expire Date: 01-04-2027) 7/8/2026 ADAM BURGESS

Permit Application Clearance Information

City Hist. Cultural Monument Cleared 9/13/2021 MELISSA JONES
Historic monument Cleared 9/13/2021 MELISSA JONES
City owned building/parcel Cleared 9/21/2021 ARMEN JIVALAGIAN
Miscellaneous Cleared 9/22/2021 LOUIS ORTEGA
Miscellaneous Cleared 9/22/2021 LOUIS ORTEGA
Miscellaneous Cleared 9/22/2021 LOUIS ORTEGA
Miscellaneous Cleared 9/22/2021 LOUIS ORTEGA
Miscellaneous Cleared 9/22/2021 LOUIS ORTEGA
ZA Case Cleared 9/22/2021 LOUIS ORTEGA
ZI Cleared 9/22/2021 LOUIS ORTEGA
ZI Cleared 9/22/2021 LOUIS ORTEGA
Low Impact Development Cleared 10/6/2021 MARTIN FRAGOSO
Abandoned oil well Cleared 3/31/2022 MATTHEW CRAIG
Hydrant and Access approval Cleared 3/31/2022 MATTHEW CRAIG
Eng Process Fee Ord 176,300 Cleared 4/15/2022 STEVE MELGAR
Highway dedication Cleared 4/26/2022 STEVE MELGAR
Encroachment in public way Cleared 5/4/2022 JEREMY CHOK
Sewer availability Cleared 5/5/2022 JEANETTE VONG
ZI Cleared 5/13/2022 LOUIS ORTEGA
Driveway location Cleared 6/7/2022 COLLINS ALLAN
Green Code Cleared 7/12/2022 ARMEN JIVALAGIAN
Trees in Parkway Cleared 7/20/2022 ADALBERTO VERA
Permit Cleared 7/28/2022 JEANETTE VONG
Fire Marshal Fire Life Safety Cleared 11/1/2022 WILLIAM JOHNS
Work Adjacent to Public Way Cleared 12/2/2022 ARMEN SARKISIAN
Drainage to Storm Drain Cleared 12/8/2022 ALBERT TAM
Miscellaneous Cleared 12/8/2022 ALBERT TAM
Roof/Waste drainage to street Cleared 12/16/2022 CHRISTOPHER ROCHA
Flood clearance Cleared 1/23/2023 BRYAN GATHUKA
DAS Clearance Cleared 8/21/2023 ARMEN JIVALAGIAN
Miscellaneous Cleared 8/29/2023 ARMEN JIVALAGIAN

Contact Information

Architect Belzberg,, Hagy; Lic. No.: C26799 2740 MAIN STREET      SANTA MONICA, CA 90405
Architect Tucker,, Timothy Alan; Lic. No.: C19103 16934 EASTWOOD AVENUE      TORRANCE, CA 90504
Contractor Del Amo Construction Inc; Lic. No.: 744458-B 23840 MADISON STREET      TORRANCE, CA 90505
Engineer Curtis,, David Jesse; Lic. No.: C75791 330 W 11TH ST APT 709      LOS ANGELES, CA 90015
Engineer Freudenberger,, Frank Michael; Lic. No.: S6500 5350 PLAYA VISTA DRIVE UNIT 31      LOS ANGELES, CA 90094
Engineer Kashighandi,, Pirooz; Lic. No.: GE3104 1417 S WESTGATE AVE 207      LOS ANGELES, CA 90025

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 11/17/2023 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 11/20/2023 Partial Approval DAVID BURKHEAD
Piling/Pier/Caisson 11/27/2023 Partial Inspection DAVID BURKHEAD
Deputy Grading 12/5/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/5/2023 Conditional Approval DAVID BURKHEAD
Piling/Pier/Caisson 12/5/2023 Partial Inspection DAVID BURKHEAD
Deputy Grading 12/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 12/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 12/13/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/13/2023 Conditional Approval DAVID BURKHEAD
Piling/Pier/Caisson 12/13/2023 Partial Approval DAVID BURKHEAD
Deputy Grading 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Piling/Pier/Caisson 1/2/2024 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/3/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/4/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/5/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/8/2024 Conditional Approval MICHAEL ROSENBERG
Piling/Pier/Caisson 1/9/2024 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 2/15/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 2/15/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 2/15/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 3/26/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 3/26/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 3/26/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 3/28/2024 Partial Inspection DAVID BURKHEAD
METHANE-Barrier 3/28/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 3/28/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 4/4/2024 Partial Approval DAVID BURKHEAD
METHANE-Barrier 4/4/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 4/4/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/22/2024 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/22/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/22/2024 Partial Approval DAVID BURKHEAD
METHANE-Barrier 4/22/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 4/22/2024 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/6/2024 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 5/6/2024 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/24/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/24/2024 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/24/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 5/24/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/24/2024 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/17/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/17/2024 Partial Approval DAVID BURKHEAD
METHANE-Barrier 6/17/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 6/17/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 7/30/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 7/30/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 7/30/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 9/16/2024 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/16/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/16/2024 Partial Approval DAVID BURKHEAD
METHANE-Barrier 9/16/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 9/16/2024 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/16/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/16/2024 Partial Approval DAVID BURKHEAD
METHANE-Barrier 10/16/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 10/16/2024 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/9/2024 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/30/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 12/30/2024 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 12/30/2024 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 12/30/2024 Partial Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 12/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/10/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/10/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 1/10/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 1/10/2025 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 1/29/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 1/29/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 1/29/2025 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 2/28/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 2/28/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 2/28/2025 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 3/28/2025 Approved DAVID BURKHEAD
Deputy Steel/Welding 4/23/2025 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/23/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/23/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 4/23/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 4/23/2025 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 4/28/2025 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 5/20/2025 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/20/2025 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/20/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/20/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 5/20/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Final 5/27/2025 Partial Approval ALFREDO LOPEZ
Deputy Steel/Welding 6/16/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/16/2025 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 6/16/2025 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 6/16/2025 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 6/24/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 6/24/2025 Partial Approval DAVID BURKHEAD
METHANE-Subgrade 6/24/2025 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 6/24/2025 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 7/3/2025 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 7/3/2025 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 7/3/2025 Partial Inspection JEFFREY FULTON
METHANE-Barrier 7/3/2025 Partial Inspection JEFFREY FULTON
METHANE-Subgrade 7/3/2025 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 7/30/2025 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/1/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/1/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 8/1/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 8/1/2025 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/8/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/8/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 8/8/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 8/8/2025 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 8/18/2025 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 8/18/2025 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 8/18/2025 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/18/2025 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/21/2025 Not Ready for Inspection JOEY BUCHANAN
Footing/Foundation/Slab 8/21/2025 Not Ready for Inspection JOEY BUCHANAN
METHANE-Barrier 8/21/2025 Not Ready for Inspection JOEY BUCHANAN
METHANE-Subgrade 8/21/2025 Not Ready for Inspection JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 8/26/2025 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/28/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/28/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 8/28/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 8/28/2025 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/3/2025 Partial Approval DAVID BURKHEAD
METHANE-Rough 9/15/2025 Not Ready for Inspection JOEY BUCHANAN
METHANE-Subgrade 9/15/2025 Corrections Issued JOEY BUCHANAN
Light Gage Steel Frame 9/29/2025 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 9/30/2025 Approved DAVID BURKHEAD
Light Gage Steel Frame 10/2/2025 Partial Inspection DAVID BURKHEAD
Insulation 10/6/2025 Partial Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/16/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/16/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 10/16/2025 Conditional Approval DAVID BURKHEAD
METHANE-Subgrade 10/16/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/27/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/27/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/5/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/5/2025 Partial Inspection DAVID BURKHEAD
METHANE-Barrier 11/5/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 11/5/2025 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 11/5/2025 Partial Approval SCOTT SOBEL
Drywall Nailing 11/24/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/24/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/4/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/4/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/11/2025 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/11/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 12/11/2025 Partial Approval DAVID BURKHEAD
Insulation 12/11/2025 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/11/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 12/11/2025 Partial Approval DAVID BURKHEAD
METHANE-Subgrade 12/11/2025 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 12/11/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/15/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 12/15/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/17/2025 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/17/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/18/2025 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/18/2025 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/18/2025 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/22/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 12/22/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 12/22/2025 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/29/2025 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 12/29/2025 Partial Approval DAVID BURKHEAD
METHANE-Barrier 12/29/2025 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 12/29/2025 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 1/9/2026 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/9/2026 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/14/2026 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/14/2026 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 1/22/2026 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/22/2026 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/23/2026 No Access for Inspection MARTIN TAVITIAN
Footing/Foundation/Slab 1/23/2026 No Access for Inspection MARTIN TAVITIAN
METHANE-Barrier 1/23/2026 No Access for Inspection MARTIN TAVITIAN
METHANE-Subgrade 1/23/2026 No Access for Inspection MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 1/29/2026 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/29/2026 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/29/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 1/29/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 1/29/2026 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 2/9/2026 Partial Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 2/9/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 2/18/2026 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 2/18/2026 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/18/2026 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 2/25/2026 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 2/25/2026 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 3/9/2026 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/11/2026 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/11/2026 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/13/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 3/13/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 3/13/2026 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/18/2026 Partial Approval DAVID BURKHEAD
METHANE-Subgrade 3/18/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Final 3/26/2026 Partial Inspection DAVID BURKHEAD
METHANE-Rough 3/26/2026 Approved DAVID BURKHEAD
Interior/Exterior Lathing 3/31/2026 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/31/2026 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/9/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 4/9/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 4/9/2026 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/9/2026 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 4/10/2026 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/21/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 4/21/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 4/21/2026 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 4/23/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 4/23/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Subgrade 4/23/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 4/23/2026 Partial Approval MARTIN TAVITIAN
Reinforced Concrete Frame 4/24/2026 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 4/27/2026 Approved DAVID BURKHEAD
Footing/Foundation/Slab 4/29/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 4/29/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Subgrade 4/29/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 4/29/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 4/30/2026 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/1/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 5/5/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/5/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 5/5/2026 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/5/2026 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 5/6/2026 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/8/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/8/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 5/8/2026 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/8/2026 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/14/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/14/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 5/14/2026 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/19/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/19/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 5/19/2026 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/19/2026 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/22/2026 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/22/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/22/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 5/22/2026 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/28/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 5/28/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Subgrade 5/28/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 5/28/2026 Not Ready for Inspection MARTIN TAVITIAN
Footing/Foundation/Slab 5/30/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 5/30/2026 Partial Approval MARTIN TAVITIAN
METHANE-Subgrade 5/30/2026 Partial Approval MARTIN TAVITIAN
Reinforced Concrete Frame 5/30/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 6/2/2026 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 6/2/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 6/2/2026 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 6/2/2026 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 6/4/2026 Approved DAVID BURKHEAD
Special/Order Compliance 6/22/2026 Corrections Issued DAVID BURKHEAD
Final 6/25/2026 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 6/25/2026 Partial Approval DAVID BURKHEAD
METHANE-Barrier 6/25/2026 Approved DAVID BURKHEAD
METHANE-Final 6/25/2026 Approved DAVID BURKHEAD
METHANE-Rough 6/25/2026 Approved DAVID BURKHEAD
METHANE-Subgrade 6/25/2026 Partial Inspection DAVID BURKHEAD
Reinforced Masonry Frame 6/25/2026 Conditional Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 6/25/2026 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 6/25/2026 Approved DAVID BURKHEAD
Special/Order Compliance 6/30/2026 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 7/2/2026 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 7/6/2026 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 7/7/2026 Approved DAVID BURKHEAD
Final 7/8/2026 OK for TCO DAVID BURKHEAD
Footing/Foundation/Slab 7/8/2026 Approved DAVID BURKHEAD
METHANE-Subgrade 7/8/2026 Approved DAVID BURKHEAD
Reinforced Masonry Frame 7/8/2026 Approved DAVID BURKHEAD