3330 S FIGUEROA ST 90007

Certificate Information: 3330 S FIGUEROA ST 90007

Application / Permit
20014-10000-04639
Plan Check / Job No.
B20LA19616
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(8) Automobile Sales - new
Work Description
NEW 3-STORY AUTOMOTIVE DEALERSHIP BUSINESS, AUTOMOTIVE SERVICES, AND PARKING ON MULTIPLE LEVELS.
Permit Issued
Issued on 4/30/2021
Issuing Office
Current Status
CofO Issued on 7/2/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/26/2020 APPLICANT
Assigned to Plan Check Engineer 11/5/2020 ALBERT SERVIN
Corrections Issued 11/13/2020 ALBERT SERVIN
Quality Review Completed 11/27/2020 PETER KIM
Disabled Access Plans Picked Up 12/9/2020 APPLICANT
Building Plans Picked Up 12/16/2020 APPLICANT
Applicant returned to address corrections 12/22/2020 ALBERT SERVIN
Applicant returned to address corrections 1/13/2021 ALBERT SERVIN
Applicant returned to address corrections 1/19/2021 ALBERT SERVIN
Applicant returned to address corrections 2/24/2021 ALBERT SERVIN
Applicant returned to address corrections 3/3/2021 ALBERT SERVIN
Applicant returned to address corrections 3/9/2021 ALBERT SERVIN
Applicant returned to address corrections 3/10/2021 ALBERT SERVIN
Green Plans Picked Up 3/10/2021 APPLICANT
Applicant returned to address corrections 3/11/2021 ALBERT SERVIN
Applicant returned to address corrections 3/18/2021 ALBERT SERVIN
Applicant returned to address corrections 3/24/2021 ALBERT SERVIN
Applicant returned to address corrections 3/30/2021 ALBERT SERVIN
Applicant returned to address corrections 4/1/2021 ALBERT SERVIN
Applicant returned to address corrections 4/7/2021 ALBERT SERVIN
Plan Check Approved 4/30/2021 ALBERT SERVIN
Issued 4/30/2021 APPLICANT
TCO Issued (Expire Date: 10-06-2024) 4/9/2024 WINSTON DUNNING
CofO in Progress 6/13/2024 JAMES POWERS
CofO in Progress 6/13/2024 JAMES POWERS
CofO in Progress 7/2/2024 JAMES POWERS
Permit Finaled 7/2/2024 ERNESTO CORRAL
CofO Issued 7/2/2024 ERNESTO CORRAL
Permit Finaled 7/2/2024 ERNESTO CORRAL

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 12/4/2020 THOMAS LANG
Encroachment in public way Cleared 12/14/2020 ELENA LOPEZ
Low Impact Development Cleared 12/18/2020 MARTIN FRAGOSO
City Hist. Cultural Monument Cleared 12/28/2020 LAMBERT GIESSINGER
Historic Resource Verification Cleared 12/28/2020 LAMBERT GIESSINGER
Historic monument Cleared 12/28/2020 LAMBERT GIESSINGER
Redevelopment Project Area Cleared 12/29/2020 GRACIELA ACOSTA
Comm Cor/Mini-Mall Cleared 1/7/2021 ANNA VIDAL
Miscellaneous Cleared 2/2/2021 MICAELA TORRES-GIL
Eng Process Fee Ord 176,300 Cleared 2/3/2021 CECILIO NAVARRO
Hydrant and Access approval Cleared 2/18/2021 JOHN CONNEALLY
Building over 36-ft Cleared 2/25/2021 CALOSHA APPROVED
Light Rail Cleared 3/10/2021 WESTON PRINGLE
Driveway location Cleared 3/23/2021 PETE EYRE
Driveway location Cleared 3/23/2021 PETE EYRE
Internal circulation Cleared 3/23/2021 PETE EYRE
Sewer availability Cleared 3/23/2021 WALLIE JONG
DAS Clearance Cleared 3/30/2021 ALBERT SERVIN
Green Code Cleared 4/6/2021 ALBERT SERVIN
Highway dedication Cleared 4/20/2021 THAN WIN
Permit Cleared 4/20/2021 THAN WIN
Work Adjacent to Public Way Cleared 4/26/2021 JOSE RODRIGUEZ

Contact Information

Architect James,, Eric A; Lic. No.: C24187 4675 MACARTHUR COURT SUITE 100      NEWPORT BEACH, CA 92660
Contractor Kunzik & Sara Construction Inc; Lic. No.: 847939-B 1699 LA COSTA MEADOWS DR #102      SAN MARCOS, CA 92078
Engineer Reed,, Roy Paul; Lic. No.: C80503 7727 CAMINITO LILIANA      SAN DIEGO, CA 92129
Engineer Volnyy,, Vladimir A; Lic. No.: S4817 11342 PALA MESA DR      NORTHRIDGE, CA 91326

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/21/2021 Partial Approval JAMES POWERS
Green Building Rough 8/13/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 8/13/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 8/13/2021 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/13/2021 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 8/25/2021 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 8/25/2021 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 8/25/2021 Not Ready for Inspection JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/26/2021 Partial Approval JAMES POWERS
Green Building Rough 8/26/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 8/26/2021 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 8/26/2021 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/26/2021 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 8/30/2021 Partial Approval JAMES POWERS
METHANE-Barrier 8/30/2021 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 8/30/2021 Not Ready for Inspection JAMES POWERS
Green Building Rough 9/7/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 9/7/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 9/7/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/7/2021 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 9/9/2021 Partial Approval JAMES POWERS
METHANE-Barrier 9/9/2021 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 9/9/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 9/13/2021 Partial Approval JAMES POWERS
Green Building Rough 9/13/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 9/13/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 9/13/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/13/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 9/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/15/2021 Conditional Approval MARK FERRARI
Footing/Foundation/Slab 9/15/2021 Partial Approval MARK FERRARI
METHANE-Barrier 9/15/2021 Not Ready for Inspection MARK FERRARI
METHANE-Subgrade 9/15/2021 Not Ready for Inspection MARK FERRARI
Deputy Reinf. Concrete 9/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/24/2021 Partial Approval JAMES POWERS
Green Building Rough 9/24/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 9/24/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 9/24/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/24/2021 Not Ready for Inspection JAMES POWERS
Green Building Rough 9/29/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 9/29/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 9/29/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/29/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 10/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/13/2021 Partial Approval JAMES POWERS
Green Building Rough 10/13/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 10/13/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 10/13/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 10/13/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 10/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/15/2021 Conditional Approval BRUCE CAMPBELL
Deputy Reinf. Masonry 10/15/2021 Conditional Approval BRUCE CAMPBELL
Deputy Shotcrete 10/15/2021 Conditional Approval BRUCE CAMPBELL
Green Building Rough 10/15/2021 Conditional Approval BRUCE CAMPBELL
METHANE-Rough 10/15/2021 Conditional Approval BRUCE CAMPBELL
Reinforced Masonry Frame 10/15/2021 Conditional Approval BRUCE CAMPBELL
Verify Sprinkler Sign Off 10/15/2021 Not Ready for Inspection BRUCE CAMPBELL
Green Building Rough 10/19/2021 Partial Inspection RUSSELL BONVOULOIR
METHANE-Rough 10/19/2021 Partial Inspection RUSSELL BONVOULOIR
Reinforced Masonry Frame 10/19/2021 Partial Approval RUSSELL BONVOULOIR
Verify Sprinkler Sign Off 10/19/2021 Partial Inspection RUSSELL BONVOULOIR
Deputy Reinf. Concrete 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 11/2/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 11/2/2021 Partial Approval JAMES POWERS
METHANE-Barrier 11/2/2021 Partial Approval JAMES POWERS
METHANE-Subgrade 11/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2021 Partial Approval JAMES POWERS
Deputy Methane Barrier 11/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/17/2021 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 11/17/2021 Partial Approval JONATHAN QUACH
METHANE-Barrier 11/17/2021 Partial Inspection JONATHAN QUACH
METHANE-Subgrade 11/17/2021 Partial Inspection JONATHAN QUACH
Deputy Reinf. Concrete 11/18/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/19/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 11/22/2021 Approved TED RIES
Footing/Foundation/Slab 11/23/2021 Partial Approval TED RIES
METHANE-Barrier 11/23/2021 Conditional Approval TED RIES
METHANE-Subgrade 11/23/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/24/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/3/2021 Partial Approval JAMES POWERS
Green Building Rough 12/3/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 12/3/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/3/2021 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 12/3/2021 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 12/4/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 12/4/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 12/4/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/7/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/8/2021 Partial Approval JAMES POWERS
Green Building Rough 12/8/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 12/8/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/8/2021 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 12/8/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/9/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/9/2021 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 12/9/2021 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 12/9/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/9/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/13/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/13/2021 Partial Approval JAMES POWERS
Green Building Rough 12/16/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 12/16/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/16/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/16/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/17/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 12/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/22/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/23/2021 Partial Approval JAMES POWERS
Green Building Rough 12/23/2021 Not Ready for Inspection JAMES POWERS
METHANE-Rough 12/23/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/23/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/23/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 1/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/7/2022 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 1/7/2022 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 1/7/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/7/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/7/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/11/2022 Partial Approval JAMES POWERS
Green Building Rough 1/11/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 1/11/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 1/11/2022 Partial Approval JAMES POWERS
Reinforced Masonry Frame 1/11/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 1/11/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 1/12/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 1/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/18/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/18/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/19/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/20/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/21/2022 Partial Approval JAMES POWERS
Green Building Rough 1/21/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 1/21/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 1/21/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 1/21/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 1/24/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/27/2022 Partial Approval JAMES POWERS
Green Building Rough 1/27/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 1/27/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 1/27/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 1/27/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 1/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/1/2022 Partial Approval JAMES POWERS
Green Building Rough 2/1/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 2/1/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/1/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/1/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 2/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/11/2022 Partial Approval JAMES POWERS
Green Building Rough 2/11/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 2/11/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/11/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/11/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 2/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/17/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 2/17/2022 Conditional Approval RUSSELL BONVOULOIR
Green Building Rough 2/17/2022 Not Ready for Inspection NICK DANERI
METHANE-Rough 2/17/2022 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 2/17/2022 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 2/17/2022 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 2/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/23/2022 Partial Approval JAMES POWERS
Green Building Rough 2/23/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 2/23/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/23/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/23/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 2/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/25/2022 Partial Approval JAMES POWERS
Reinforced Masonry Frame 2/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/1/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/4/2022 Partial Approval JAMES POWERS
Green Building Rough 3/4/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 3/4/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/4/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/4/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 3/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/15/2022 Partial Approval JAMES POWERS
Masonry Wall/Backfill 3/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/17/2022 Partial Approval JAMES POWERS
Green Building Rough 3/17/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 3/17/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/17/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 3/17/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 3/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/18/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/21/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/22/2022 Partial Approval JAMES POWERS
Reinforced Masonry Frame 3/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/24/2022 Partial Approval JAMES POWERS
Green Building Rough 3/24/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 3/24/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/24/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/24/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 3/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/4/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 4/4/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/27/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/29/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/17/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/17/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/18/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/8/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/8/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/13/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/15/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 6/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/21/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/22/2022 Partial Approval JAMES POWERS
Drywall Nailing 6/22/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/24/2022 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 6/27/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/28/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/29/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/6/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/7/2022 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 7/7/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/8/2022 Partial Approval JAMES POWERS
Drywall Nailing 7/8/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/13/2022 Partial Approval JAMES POWERS
Drywall Nailing 7/13/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/15/2022 Conditional Approval TED RIES
Deputy Reinf. Masonry 7/15/2022 Conditional Approval TED RIES
Deputy Steel/Welding 7/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/19/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/19/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/20/2022 Conditional Approval WINSTON DUNNING
Drywall Nailing 7/20/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/21/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/21/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/1/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 8/1/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/5/2022 Partial Approval JAMES POWERS
Drywall Nailing 8/5/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/8/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/11/2022 Partial Approval JAMES POWERS
Drywall Nailing 8/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/15/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/17/2022 Partial Approval JAMES POWERS
Drywall Nailing 8/17/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/22/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/29/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/30/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/1/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 9/1/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/6/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 9/22/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 9/26/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 10/19/2022 Approved JAMES POWERS
T-Bar Ceiling 10/28/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 8/25/2023 Approved ALAN MORELOS
METHANE-Final 8/25/2023 Not Ready for Inspection ALAN MORELOS
Posting Pre-Inspection 9/28/2023 Approved JAMES POWERS
Special/Order Compliance 9/28/2023 Approved JAMES POWERS
Verify Sprinkler Sign Off 9/28/2023 Approved JAMES POWERS
Deputy Steel/Welding 11/1/2023 Partial Approval JAMES POWERS
Final 6/13/2024 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 6/13/2024 Approved JAMES POWERS
Green Building Final 6/13/2024 Approved JAMES POWERS
Green Building Rough 6/13/2024 Approved JAMES POWERS
METHANE-Barrier 6/13/2024 Approved JAMES POWERS
METHANE-Final 6/13/2024 Approved JAMES POWERS
METHANE-Rough 6/13/2024 Approved JAMES POWERS
METHANE-Subgrade 6/13/2024 Approved JAMES POWERS
Reinforced Concrete Frame 6/13/2024 Approved JAMES POWERS
Reinforced Masonry Frame 6/13/2024 Approved JAMES POWERS
SGSOV-Seismic Gas S/O Valve 6/13/2024 SGSOV Approved JAMES POWERS
Smoke Detectors 6/13/2024 Approved JAMES POWERS
Final 7/2/2024 OK to Issue CofO JAMES POWERS