818 S MULLEN AVE 90005

Certificate Information: 818 S MULLEN AVE 90005

Application / Permit
20014-10000-04576
Plan Check / Job No.
B20LA19359
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Addition to the rear of existing single family dwelling, new attached deck
Permit Issued
Issued on 4/12/2021
Issuing Office
Current Status
CofO Issued on 2/24/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/22/2020 APPLICANT
Assigned to Plan Check Engineer 11/5/2020 SHANGQIN XIE
Corrections Issued 11/6/2020 SHANGQIN XIE
Building Plans Picked Up 11/12/2020 APPLICANT
Plan Check Approved 12/8/2020 AMIR DANAI
Issued 4/12/2021 APPLICANT
CofO in Progress 2/17/2023 ALIZAH MAYAGOITIA
CofO Issued 2/24/2023 DEROLD HAUFF
Permit Finaled 2/24/2023 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 11/18/2020 WALLIE JONG
Sewer availability Cleared 11/18/2020 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 11/23/2020 WALLIE JONG

Contact Information

Architect Tsai,, Melissa Hon; Lic. No.: C37802 1107 FAIR OAKS AVE #137      SOUTH PASADENA, CA 91030
Contractor New Design Kitchen; Lic. No.: 919653-B P O BOX 1893      SAN GABRIEL, CA 91778
Engineer Zhuang,, Wenbin; Lic. No.: S5236 205 S CHAPEL AVE #D-1      ALHAMBRA, CA 91801

Inspector Information

JEFFREY MEAD, (213) 202-3240 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 7/29/2021 Approved ARTHUR SARGSYAN
Footing/Foundation/Slab 7/29/2021 Approved ARTHUR SARGSYAN
METHANE-Barrier 7/29/2021 Approved ARTHUR SARGSYAN
METHANE-Subgrade 7/29/2021 Approved ARTHUR SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 8/9/2021 Not Ready for Inspection CHRIS CHRISTENSEN
BUILDING-Rough-Frame 8/11/2021 Partial Approval CHRIS CHRISTENSEN
Green Building Rough 8/11/2021 Not Ready for Inspection CHRIS CHRISTENSEN
METHANE-Rough 8/11/2021 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 12/2/2021 Approved MASHEL JONGERT
ELECTRICAL-Rough 12/2/2021 Approved MASHEL JONGERT
Floor/Roof Diaphrgm/Shear Wall 12/2/2021 Approved MASHEL JONGERT
Green Building Rough 12/2/2021 Approved MASHEL JONGERT
PLUMBING-Rough 12/2/2021 Approved MASHEL JONGERT
Interior/Exterior Lathing 1/10/2022 No Access for Inspection JOSEPH MCGARRY
Interior/Exterior Lathing 1/14/2022 Partial Approval JOSEPH MCGARRY
Insulation 1/27/2022 Approved ARTHUR SARGSYAN
Interior/Exterior Lathing 1/27/2022 Approved ARTHUR SARGSYAN
Drywall Nailing 2/9/2022 Approved ARTHUR SARGSYAN
Interior/Exterior Lathing 2/9/2022 Approved ARTHUR SARGSYAN
HVAC-Rough 2/18/2022 Approved ARTHUR SARGSYAN
ELECTRICAL-Final 11/30/2022 Not Ready for Inspection JEFFREY MEAD
Final 11/30/2022 Not Ready for Inspection JEFFREY MEAD
Green Building Final 11/30/2022 Not Ready for Inspection JEFFREY MEAD
HVAC-Final 11/30/2022 Not Ready for Inspection JEFFREY MEAD
PLUMBING-Final 11/30/2022 Not Ready for Inspection JEFFREY MEAD
SGSOV-Seismic Gas S/O Valve 11/30/2022 SGSOV Not Ready JEFFREY MEAD
Smoke Detectors 11/30/2022 Not Ready for Inspection JEFFREY MEAD
Final 12/19/2022 Corrections Issued JEFFREY MEAD
Green Building Final 12/19/2022 Approved JEFFREY MEAD
SGSOV-Seismic Gas S/O Valve 12/19/2022 SGSOV Not Ready JEFFREY MEAD
Smoke Detectors 12/19/2022 Approved JEFFREY MEAD
Final 1/12/2023 No Access for Inspection JEFFREY MEAD
SGSOV-Seismic Gas S/O Valve 1/12/2023 SGSOV Approved JEFFREY MEAD
Final 1/18/2023 Partial Approval JEFFREY MEAD
ELECTRICAL-Final 2/17/2023 Approved ALIZAH MAYAGOITIA
Final 2/17/2023 OK to Issue CofO ALIZAH MAYAGOITIA
HVAC-Final 2/17/2023 Approved ALIZAH MAYAGOITIA
PLUMBING-Final 2/17/2023 Approved ALIZAH MAYAGOITIA