4000 N SAPPHIRE DR 91436

Certificate Information: 4000 N SAPPHIRE DR 91436

Application / Permit
20014-10000-04510
Plan Check / Job No.
B20LA19056
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED ADDTION AND ROOF TOP DECK AT REAR OF THE EXISTING 1 STORY SINGLE FAMILY DEWLLING PER ENGINEER DESIGN
Permit Issued
Issued on 8/18/2021
Issuing Office
Current Status
CofO Issued on 12/23/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/18/2020 APPLICANT
Assigned to Plan Check Engineer 10/29/2020 AUNG SOE
Corrections Issued 11/2/2020 AUNG SOE
Quality Review Completed 11/12/2020 HERNAN ARREOLA
Plan Check Approved 8/5/2021 AUNG SOE
Issued 8/18/2021 APPLICANT
Building Plans Picked Up 8/19/2021 APPLICANT
CofO in Progress 12/6/2022 VINCENT HANLEY
Permit Finaled 12/23/2022 MICHAEL SMITH
CofO Issued 12/23/2022 MICHAEL SMITH
Permit Finaled 12/23/2022 MICHAEL SMITH

Permit Application Clearance Information

Certificate of Compliance Cleared 2/2/2021 NOAH MCCOY
BHO/Hillside ordinance Cleared 2/18/2021 JOHN TRIANTAFYLLOS
BHO/Hillside ordinance Cleared 2/18/2021 JOHN TRIANTAFYLLOS
BHO/Hillside ordinance Cleared 2/18/2021 JOHN TRIANTAFYLLOS
BHO/Hillside ordinance Cleared 2/18/2021 JOHN TRIANTAFYLLOS
BHO/Hillside ordinance Cleared 2/18/2021 JOHN TRIANTAFYLLOS
Eng Process Fee Ord 176,300 Cleared 2/18/2021 JOHN TRIANTAFYLLOS
Sewer availability Cleared 2/18/2021 JOHN TRIANTAFYLLOS
Grading Pre-Inspection Cleared 3/10/2021 BRIAN MILLER
Hydrant and Access approval Cleared 4/16/2021 JOHN CONNEALLY
Distance to fire station Cleared 5/4/2021 JOHN CONNEALLY
Low Impact Development Cleared 6/9/2021 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 6/21/2021 LEE GUILBEAUX

Contact Information

Contractor Owner-Builder       ,
Engineer Ramirez, Cid, Jose Carlos; Lic. No.: C91046 5164 N RATON CIR      LONG BEACH, CA 90807

Inspector Information

THOMAS FINNILA, (818) 774-4324 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 8/26/2021 Partial Approval PETER FOLLING
Deputy Drilled-In Anchors 9/2/2021 Approved RONALD COWAN
Excavation/Setback/Form/Re-Bar 9/8/2021 Approved RONALD COWAN
Footing/Foundation/Slab 9/8/2021 Approved RONALD COWAN
BUILDING-Rough-Frame 11/1/2021 Corrections Issued RONALD COWAN
ELECTRICAL-Rough 11/1/2021 Corrections Issued RONALD COWAN
Green Building Rough 11/1/2021 Not Ready for Inspection RONALD COWAN
HVAC-Rough 11/1/2021 Approved RONALD COWAN
PLUMBING-Rough 11/1/2021 Approved RONALD COWAN
BUILDING-Rough-Frame 11/4/2021 Partial Approval RONALD COWAN
ELECTRICAL-Rough 11/4/2021 Approved RONALD COWAN
HVAC-Rough 11/4/2021 Approved RONALD COWAN
PLUMBING-Rough 11/4/2021 Approved RONALD COWAN
Insulation 11/17/2021 Not Ready for Inspection DAVID SANDOVAL
Wood Frame 11/17/2021 Not Ready for Inspection DAVID SANDOVAL
Green Building Rough 11/24/2021 Not Ready for Inspection SEAN HAUPT
Wood Frame 11/24/2021 Not Ready for Inspection SEAN HAUPT
BUILDING-Rough-Frame 12/8/2021 Approved DAVID SANDOVAL
Green Building Rough 12/8/2021 Approved DAVID SANDOVAL
Interior/Exterior Lathing 12/8/2021 Partial Approval DAVID SANDOVAL
Insulation 12/13/2021 Approved JUSTIN HAWLEY
Drywall Nailing 12/27/2021 Approved JAVIER RAMOS JR
Shower Pan 2/23/2022 Approved JAVIER RAMOS JR
ELECTRICAL-Final 8/3/2022 Approved VINCENT HANLEY
HVAC-Final 8/3/2022 Corrections Issued VINCENT HANLEY
PLUMBING-Final 8/3/2022 Approved VINCENT HANLEY
Final 12/5/2022 OK to Issue CofO VINCENT HANLEY
Green Building Final 12/5/2022 Approved VINCENT HANLEY
SGSOV-Seismic Gas S/O Valve 12/5/2022 SGSOV Approved VINCENT HANLEY
Smoke Detectors 12/5/2022 Approved VINCENT HANLEY