1420 W 69TH ST 90047

Certificate Information: 1420 W 69TH ST 90047

Application / Permit
20014-10000-04428
Plan Check / Job No.
B20LA18708
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) DETACHED GARAGE WITH (N) ADDITION TO AN ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33 (c)-(d). ALL WORK PER WOOD FRAME PRESCRIPTIVE PROVISION.
Permit Issued
Issued on 4/29/2021
Issuing Office
Current Status
CofO Issued on 6/17/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/9/2020 APPLICANT
Assigned to Plan Check Engineer 10/19/2020 KEVIN MORALES
Corrections Issued 10/19/2020 KEVIN MORALES
Plan Check Approved 3/31/2021 KEVIN MORALES
Building Plans Picked Up 4/8/2021 APPLICANT
Issued 4/29/2021 APPLICANT
CofO in Progress 6/3/2022 ENRIQUE MIRELES
CofO Issued 6/17/2022 DEROLD HAUFF
Permit Finaled 6/17/2022 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/23/2020 JUAN ASHTON
Address approval Cleared 10/26/2020 JUAN ASHTON
Sewer availability Cleared 11/9/2020 JUAN ASHTON
Construction near power lines Cleared 2/11/2021 RIDWAN HARDY

Contact Information

Contractor Dhs Ventures Inc; Lic. No.: 1047699-B 3575 CAHUENGA BLVD #350      LOS ANGELES, CA 90068

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/9/2021 Approved EUGENE CASSIDY
PLUMBING-Rough 10/1/2021 Partial Approval FREDDIE RIVERA
ELECTRICAL-Rough 11/5/2021 Approved FREDDIE RIVERA
HVAC-Rough 11/5/2021 Conditional Approval FREDDIE RIVERA
PLUMBING-Rough 11/5/2021 Approved FREDDIE RIVERA
Wood Frame 11/5/2021 Not Ready for Inspection FREDDIE RIVERA
Green Building Rough 11/9/2021 Approved FREDDIE RIVERA
Wood Frame 11/9/2021 Conditional Approval FREDDIE RIVERA
Insulation 11/15/2021 Corrections Issued FREDDIE RIVERA
Deputy Drilled-In Anchors 11/19/2021 Conditional Approval ALIZAH MAYAGOITIA
Excavation/Setback/Form/Re-Bar 11/22/2021 No Access for Inspection JOAQUIN GREENOUGH
Insulation 11/22/2021 No Access for Inspection JOAQUIN GREENOUGH
Interior/Exterior Lathing 11/22/2021 No Access for Inspection JOAQUIN GREENOUGH
METHANE-Barrier 11/22/2021 No Access for Inspection JOAQUIN GREENOUGH
Insulation 11/30/2021 Not Ready for Inspection FREDDIE RIVERA
Interior/Exterior Lathing 11/30/2021 Not Ready for Inspection FREDDIE RIVERA
Wood Frame 11/30/2021 Corrections Issued FREDDIE RIVERA
Deputy Drilled-In Anchors 12/1/2021 Conditional Approval JUSTIN HAWLEY
Insulation 12/3/2021 Approved FREDDIE RIVERA
Wood Frame 12/3/2021 Approved FREDDIE RIVERA
Drywall Nailing 12/20/2021 Approved FREDDIE RIVERA
Interior/Exterior Lathing 12/20/2021 Partial Approval FREDDIE RIVERA
Interior/Exterior Lathing 1/28/2022 Corrections Issued FREDDIE RIVERA
Sewer 1/28/2022 Approved FREDDIE RIVERA
Shower Pan 1/28/2022 Approved FREDDIE RIVERA
Interior/Exterior Lathing 2/4/2022 Partial Approval HORACE FULTZ
BUILDING-Rough-Frame 4/20/2022 Approved ENRIQUE MIRELES
Final 4/20/2022 Corrections Issued ENRIQUE MIRELES
Footing/Foundation/Slab 4/20/2022 Approved ENRIQUE MIRELES
Green Building Final 4/20/2022 Approved ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 4/20/2022 SGSOV Approved ENRIQUE MIRELES
Smoke Detectors 4/20/2022 Approved ENRIQUE MIRELES
Final 5/27/2022 Corrections Issued ENRIQUE MIRELES
Final 6/3/2022 OK to Issue CofO ENRIQUE MIRELES