635 W WASHINGTON BLVD 90015

Certificate Information: 635 W WASHINGTON BLVD 90015

Application / Permit
20014-10000-04317
Plan Check / Job No.
B20LA18203
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(8) Automobile Sales - new
Work Description
NEW (10)-STORY NEW AUTOMOTIVE DEALERSHIP WITH ROOFTOP PARKING AND MEZZANINE AT 4TH FLOOR. ***The CofO of this permit shall not issued prior to finalize of permit 21016-10000-55946***
Permit Issued
Issued on 1/3/2022
Issuing Office
Metro
Current Status
CofO Issued on 1/11/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/15/2020 APPLICANT
Assigned to Plan Check Engineer 10/22/2020 YOUNG KIM
Corrections Issued 11/16/2020 YOUNG KIM
Quality Review Completed 11/19/2020 SAI KHUM
Applicant returned to address corrections 11/19/2020 YOUNG KIM
Applicant returned to address corrections 12/1/2020 YOUNG KIM
Applicant returned to address corrections 1/20/2021 YOUNG KIM
Applicant returned to address corrections 2/2/2021 YOUNG KIM
Applicant returned to address corrections 7/15/2021 YOUNG KIM
Applicant returned to address corrections 8/10/2021 YOUNG KIM
Applicant returned to address corrections 8/24/2021 YOUNG KIM
Applicant returned to address corrections 8/26/2021 YOUNG KIM
Applicant returned to address corrections 10/4/2021 YOUNG KIM
Applicant returned to address corrections 10/6/2021 YOUNG KIM
Applicant returned to address corrections 10/15/2021 YOUNG KIM
Applicant returned to address corrections 11/9/2021 LARRY LEE
Plan Check Approved 1/3/2022 LARRY LEE
Issued 1/3/2022 APPLICANT
Building Plans Picked Up 1/5/2022 APPLICANT
TCO Issued (Expire Date: 11-29-2023) 6/2/2023 ERNESTO CORRAL
CofO in Progress 1/11/2024 JAMES POWERS
CofO Issued 1/11/2024 ERNESTO CORRAL
Permit Finaled 1/11/2024 ERNESTO CORRAL

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/9/2020 RENZ SORIANO
Metro Rail approval Cleared 12/15/2020 YOUNG KIM
Sewer availability Cleared 1/19/2021 RENZ SORIANO
Solvents/fuels Cleared 1/20/2021 SCAQMD APPROVED
Historic Resource Verification Cleared 1/25/2021 GISELLE CORELLA
Redevelopment Project Area Cleared 1/25/2021 GISELLE CORELLA
Building over 36-ft Cleared 2/7/2021 CALOSHA APPROVED
Driveway location Cleared 2/25/2021 TAIMOUR TANAVOLI
Driveway location Cleared 2/25/2021 TAIMOUR TANAVOLI
Internal circulation Cleared 2/25/2021 TAIMOUR TANAVOLI
Methane Ordinance Cleared 3/5/2021 VIDAL GARCIA
Work Adjacent to Public Way Cleared 5/19/2021 JOSE RODRIGUEZ
Bicycle Parking Cleared 7/13/2021 MSTAFA AL-MSARI
Automotive Use Cleared 8/10/2021 JASON CHAN
Automotive Use Cleared 8/10/2021 JASON CHAN
Automotive Use Cleared 8/10/2021 JASON CHAN
Miscellaneous Cleared 8/10/2021 JASON CHAN
Miscellaneous Cleared 8/10/2021 JASON CHAN
Miscellaneous Cleared 8/10/2021 JASON CHAN
Miscellaneous Cleared 8/10/2021 JASON CHAN
Site Plan review Cleared 8/10/2021 JASON CHAN
Low Impact Development Cleared 8/12/2021 ORVAL HERNANDEZ-MARCI
Permit Cleared 8/16/2021 MATIAS FARFAN
Roof/Waste drainage to street Cleared 8/26/2021 RENZ SORIANO
Green Code Cleared 10/5/2021 YOUNG KIM
DAS Clearance Cleared 10/8/2021 YOUNG KIM
Encroachment in public way Cleared 10/13/2021 MSTAFA AL-MSARI
Miscellaneous Cleared 10/14/2021 DAVID URITA
Community Plan Implem. Overlay Cleared 10/20/2021 HELEN JADALI
Miscellaneous Cleared 11/5/2021 ANACANY HURTADO
Hydrant and Access approval Cleared 11/10/2021 MATTHEW CRAIG
Miscellaneous Cleared 11/10/2021 HELEN JADALI
Miscellaneous Cleared 11/10/2021 HELEN JADALI
Miscellaneous Cleared 11/10/2021 HELEN JADALI
Highway dedication Cleared 11/18/2021 CELINA MORENO
Fire Marshal Fire Life Safety Cleared 12/10/2021 ANDREW KO
Miscellaneous Cleared 12/27/2021 JASON CHAN

Contact Information

Architect Petruzzi,, Peter; Lic. No.: C18480 1165 FRANCISCO ST #7      SAN FRANCISCO, CA 94109
Contractor Standard Construction 2 Llc; Lic. No.: 1074416-B 2647 GATEWAY RD STE 105-136      CARLSBAD, CA 92009
Engineer Boyle,, Dylan Joseph; Lic. No.: GE3139 102 EAGLE POINT      IRVINE, CA 92604
Engineer Carlson,, Peter Andrew; Lic. No.: S4937 13450 ALDRIN AVENUE      POWAY, CA 92064
Engineer Schade,, Paul Robert; Lic. No.: GE2371 5736 CORPORATE AVE      CYPRESS, CA 90630
Engineer Sepich,, John Edward; Lic. No.: C37509 4007 MCCULLOUGH AVE 469      SAN ANTONIO, TX 78212

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 9/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/24/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/11/2022 Partial Approval JAMES POWERS
Green Building Rough 1/11/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 1/11/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 1/11/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 1/11/2022 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 1/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/12/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/13/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/18/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/18/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/19/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/20/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/20/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/20/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/21/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/25/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/26/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/27/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/27/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/31/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 1/31/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/31/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/1/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 2/1/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/2/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 2/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/3/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 2/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/4/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 2/4/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/7/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/8/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/9/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/10/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/11/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/14/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/15/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/16/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/17/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/17/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/18/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/18/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/22/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/21/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/21/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/21/2022 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 3/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/22/2022 No Access for Inspection JAMES POWERS
Deputy Reinf. Concrete 3/22/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/23/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/24/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/25/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/29/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/30/2022 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/31/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/31/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 4/1/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/1/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/4/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/11/2022 Partial Approval JAMES POWERS
Insulation 4/11/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 4/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/18/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/18/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/20/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/20/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/25/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/28/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/2/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/3/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/4/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/5/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/6/2022 Partial Approval JAMES POWERS
Deputy Methane Barrier 5/9/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/9/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/9/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/10/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/11/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/12/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/13/2022 Partial Approval JAMES POWERS
Reinforced Masonry Frame 5/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/17/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/19/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/19/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 5/31/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/31/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/31/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/2/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/2/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 6/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/6/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 6/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/8/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/8/2022 Conditional Approval TED RIES
Deputy Reinf. Masonry 6/8/2022 Conditional Approval TED RIES
Insulation 6/8/2022 Partial Approval TED RIES
Deputy Pre-Stress Concrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/14/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/14/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/14/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/17/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/21/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/21/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/23/2022 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/27/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/27/2022 Partial Approval JAMES POWERS
Pre-Inspection 6/27/2022 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 6/28/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/28/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/28/2022 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 6/28/2022 Not Ready for Inspection JAMES POWERS
Deputy Methane Barrier 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Insulation 6/30/2022 Not Ready for Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 7/1/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/1/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/5/2022 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/5/2022 Not Ready for Inspection JAMES POWERS
Deputy Methane Barrier 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 7/6/2022 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/6/2022 Off-Hour Fees Due
Footing/Foundation/Slab 7/6/2022 Partial Approval JAMES POWERS
METHANE-Barrier 7/6/2022 Partial Approval JAMES POWERS
METHANE-Subgrade 7/6/2022 Partial Approval JAMES POWERS
Deputy Methane Barrier 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 7/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/7/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/8/2022 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/8/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 7/13/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/13/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/13/2022 Partial Approval JAMES POWERS
METHANE-Barrier 7/13/2022 Partial Approval JAMES POWERS
METHANE-Subgrade 7/13/2022 Partial Approval JAMES POWERS
Deputy Methane Barrier 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 7/15/2022 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/15/2022 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 7/15/2022 Conditional Approval TED RIES
Insulation 7/15/2022 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/19/2022 Partial Approval JAMES POWERS
Insulation 7/19/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/20/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/21/2022 Partial Approval JAMES POWERS
Insulation 7/21/2022 Partial Approval JAMES POWERS
Deputy Methane Barrier 7/22/2022 Partial Approval JAMES POWERS
Insulation 7/22/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/25/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/27/2022 Partial Approval JAMES POWERS
Insulation 7/27/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/29/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2022 Partial Approval JAMES POWERS
Insulation 7/29/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/2/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/2/2022 Partial Approval JAMES POWERS
Insulation 8/4/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2022 Partial Approval JAMES POWERS
Insulation 8/9/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/11/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/12/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2022 Partial Approval JAMES POWERS
Insulation 8/15/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/19/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/19/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/22/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/24/2022 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/25/2022 Partial Approval JAMES POWERS
Insulation 8/25/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/31/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/31/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/1/2022 Partial Approval JAMES POWERS
Insulation 9/1/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/2/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 9/2/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/2/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/8/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/8/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/9/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 9/14/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/15/2022 Partial Approval JAMES POWERS
Drywall Nailing 9/15/2022 Not Ready for Inspection JAMES POWERS
Insulation 9/15/2022 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 9/15/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 9/20/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/20/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/21/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/26/2022 Partial Approval JAMES POWERS
Drywall Nailing 9/26/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/3/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/3/2022 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 10/4/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/5/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/5/2022 Partial Approval JAMES POWERS
METHANE-Barrier 10/5/2022 Partial Approval JAMES POWERS
METHANE-Subgrade 10/5/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/6/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Light Gage Steel Frame 10/25/2022 Partial Approval JAMES POWERS
Structural Steel Frame 10/25/2022 Not Ready for Inspection JAMES POWERS
Drywall Nailing 10/31/2022 Not Ready for Inspection JAMES POWERS
Green Building Rough 10/31/2022 Approved JAMES POWERS
Insulation 10/31/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 10/31/2022 Approved JAMES POWERS
Reinforced Concrete Frame 10/31/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 10/31/2022 Not Ready for Inspection JAMES POWERS
Drywall Nailing 11/7/2022 Partial Approval RAFAEL ESPINOZA
Insulation 11/8/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 11/8/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 11/8/2022 Not Ready for Inspection JAMES POWERS
Pre-Inspection 12/16/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 12/16/2022 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 12/19/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 12/19/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 12/23/2022 Partial Approval JAMES POWERS
Drywall Nailing 12/27/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/9/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/13/2023 Not Ready for Inspection JAMES POWERS
T-Bar Ceiling 1/24/2023 Partial Approval JAMES POWERS
Special/Order Compliance 1/25/2023 Partial Approval JAMES POWERS
T-Bar Ceiling 1/30/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Special/Order Compliance 2/8/2023 Partial Approval JAMES POWERS
Deputy Methane Barrier 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Final 3/1/2023 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 3/1/2023 Approved JAMES POWERS
Green Building Final 3/1/2023 Approved JAMES POWERS
METHANE-Barrier 3/1/2023 Approved JAMES POWERS
METHANE-Subgrade 3/1/2023 Approved JAMES POWERS
Reinforced Concrete Frame 3/1/2023 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 3/1/2023 SGSOV No Gas JAMES POWERS
Smoke Detectors 3/1/2023 Approved JAMES POWERS
Verify Sprinkler Sign Off 3/1/2023 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 3/13/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/14/2023 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 3/24/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/29/2023 Partial Approval JAMES POWERS
Insulation 4/11/2023 Partial Approval JAMES POWERS
Special/Order Compliance 5/3/2023 Partial Approval JAMES POWERS
Special/Order Compliance 5/11/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/30/2023 Partial Inspection NICK DANERI
Special/Order Compliance 5/30/2023 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/30/2023 Conditional Approval NICK DANERI
Special/Order Compliance 6/16/2023 Partial Approval JAMES POWERS
Special/Order Compliance 11/1/2023 Approved JAMES POWERS
Final 1/11/2024 OK to Issue CofO JAMES POWERS
Reinforced Concrete Frame 1/11/2024 Approved JAMES POWERS
Verify Sprinkler Sign Off 1/11/2024 Approved JAMES POWERS