Deputy Reinf. Concrete
|
9/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
1/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
1/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
1/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/17/2022
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
2/17/2022
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Pre-Stress Concrete
|
2/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
2/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
3/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
3/21/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/21/2022
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
3/21/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/22/2022
|
No Access for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
3/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
3/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
3/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/29/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/30/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/31/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/31/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
4/1/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/1/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
4/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/20/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/20/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/21/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
4/21/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
5/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
5/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
5/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
6/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
6/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
6/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/8/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
6/8/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Masonry
|
6/8/2022
|
Conditional Approval
|
TED RIES
|
|
Insulation
|
6/8/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
6/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/15/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/15/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
6/15/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/15/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/17/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Pre-Stress Concrete
|
6/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/17/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Steel/Welding
|
6/17/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Pre-Stress Concrete
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
6/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
6/27/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
6/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
6/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Insulation
|
6/30/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Pre-Stress Concrete
|
7/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
7/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/5/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
7/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
7/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/6/2022
|
Off-Hour Fees Due
|
|
|
Footing/Foundation/Slab
|
7/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
7/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
7/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
7/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
7/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
7/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
7/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
7/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
7/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
7/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
7/14/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
7/14/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Masonry
|
7/14/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
7/15/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
7/15/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
7/15/2022
|
Conditional Approval
|
TED RIES
|
|
Insulation
|
7/15/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
7/18/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/18/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Pre-Stress Concrete
|
7/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
7/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
7/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
7/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
7/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
7/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
7/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
7/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
7/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
7/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
7/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
7/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
8/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
8/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
8/17/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
8/18/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
8/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/23/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Pre-Stress Concrete
|
8/24/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Pre-Stress Concrete
|
8/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Pre-Stress Concrete
|
8/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
8/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
9/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
9/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
9/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
9/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
9/15/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
9/15/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
9/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/19/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
9/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
9/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
9/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
10/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/3/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Light Gage Steel Frame
|
10/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Structural Steel Frame
|
10/25/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
10/31/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
10/31/2022
|
Approved
|
JAMES POWERS
|
|
Insulation
|
10/31/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
10/31/2022
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/31/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
11/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
11/8/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/8/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Pre-Inspection
|
12/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
T-Bar Ceiling
|
12/16/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
T-Bar Ceiling
|
12/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
T-Bar Ceiling
|
12/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/13/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
T-Bar Ceiling
|
1/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
1/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
T-Bar Ceiling
|
1/30/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Special/Order Compliance
|
2/8/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
2/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Methane Barrier
|
2/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Final
|
3/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/1/2023
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
3/1/2023
|
Approved
|
JAMES POWERS
|
|
METHANE-Barrier
|
3/1/2023
|
Approved
|
JAMES POWERS
|
|
METHANE-Subgrade
|
3/1/2023
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
3/1/2023
|
SGSOV No Gas
|
JAMES POWERS
|
|
Smoke Detectors
|
3/1/2023
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/14/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/29/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
4/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
5/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
5/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/30/2023
|
Partial Inspection
|
NICK DANERI
|
|
Special/Order Compliance
|
5/30/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/30/2023
|
Conditional Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
6/16/2023
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
11/1/2023
|
Approved
|
JAMES POWERS
|
|
Final
|
1/11/2024
|
OK to Issue CofO
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/11/2024
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/11/2024
|
Approved
|
JAMES POWERS
|