9711 S HAAS AVE 90047

Certificate Information: 9711 S HAAS AVE 90047

Application / Permit
20014-10000-04022
Plan Check / Job No.
B20LA17009
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
BEDROOM AND BATHROOM ADDITION TO REAR OF (E) SFD.
Permit Issued
Issued on 1/15/2021
Issuing Office
Current Status
CofO Issued on 7/28/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/16/2020 APPLICANT
Assigned to Plan Check Engineer 9/23/2020 LAWRENCE QUIRANTE
Corrections Issued 9/23/2020 LAWRENCE QUIRANTE
Applicant returned to address corrections 10/21/2020 GEORGE ALVAREZ
Plan Check Approved 1/15/2021 SHANGQIN XIE
Issued 1/15/2021 APPLICANT
Building Plans Picked Up 1/19/2021 APPLICANT
CofO in Progress 7/19/2023 ENRIQUE MIRELES
CofO Issued 7/28/2023 DEROLD HAUFF
Permit Finaled 7/28/2023 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 10/14/2020 JUAN ASHTON
Sewer availability Cleared 10/14/2020 JUAN ASHTON
Eng Process Fee Ord 176,300 Cleared 10/15/2020 JUAN ASHTON

Contact Information

Contractor Owner-Builder       ,
Engineer Christiansen,, Scott; Lic. No.: C37989 1003 WILSHIRE BLVD 202      SANTA MONICA, CA 90401

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 4/27/2021 Conditional Approval FREDDIE RIVERA
Footing/Foundation/Slab 5/6/2021 Corrections Issued FREDDIE RIVERA
METHANE-Barrier 5/6/2021 No Access for Inspection FREDDIE RIVERA
METHANE-Subgrade 5/6/2021 No Access for Inspection FREDDIE RIVERA
Footing/Foundation/Slab 5/18/2021 Not Ready for Inspection DAVID FEILER
METHANE-Barrier 5/18/2021 Not Ready for Inspection DAVID FEILER
METHANE-Subgrade 5/18/2021 Corrections Issued DAVID FEILER
Excavation/Setback/Form/Re-Bar 5/26/2021 Approved FREDDIE RIVERA
Footing/Foundation/Slab 5/26/2021 Approved FREDDIE RIVERA
METHANE-Barrier 5/26/2021 Approved FREDDIE RIVERA
METHANE-Subgrade 5/26/2021 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 6/29/2021 Not Ready for Inspection DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 6/29/2021 Corrections Issued DAVID FEILER
Green Building Rough 6/29/2021 Not Ready for Inspection DAVID FEILER
Insulation 6/29/2021 Not Ready for Inspection DAVID FEILER
METHANE-Rough 6/29/2021 Approved DAVID FEILER
Wood Frame 6/29/2021 Not Ready for Inspection DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 7/8/2021 Not Ready for Inspection FREDDIE RIVERA
Insulation 7/8/2021 Partial Approval FREDDIE RIVERA
PLUMBING-Rough 7/8/2021 Partial Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 7/14/2021 Approved FREDDIE RIVERA
Insulation 7/14/2021 Partial Approval FREDDIE RIVERA
PLUMBING-Rough 7/14/2021 Not Ready for Inspection FREDDIE RIVERA
PLUMBING-Rough 8/4/2021 Approved FREDDIE RIVERA
Wood Frame 8/4/2021 Not Ready for Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 7/12/2022 Approved ENRIQUE MIRELES
Green Building Rough 7/12/2022 Approved ENRIQUE MIRELES
Wood Frame 7/12/2022 Approved ENRIQUE MIRELES
ELECTRICAL-Rough 7/21/2022 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 7/21/2022 Approved ENRIQUE MIRELES
Wood Frame 7/21/2022 Approved ENRIQUE MIRELES
Wood Frame 7/26/2022 No Access for Inspection HORACE FULTZ
Insulation 8/22/2022 Approved ENRIQUE MIRELES
Drywall Nailing 9/16/2022 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 9/16/2022 Approved ENRIQUE MIRELES
Service/Power Release 4/18/2023 Approved ENRIQUE MIRELES
Final 7/5/2023 Corrections Issued ENRIQUE MIRELES
Green Building Final 7/5/2023 Approved ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 7/5/2023 SGSOV Approved ENRIQUE MIRELES
Smoke Detectors 7/5/2023 Approved ENRIQUE MIRELES
Final 7/18/2023 OK to Issue CofO ENRIQUE MIRELES