6463 S CIMARRON ST 90047

Certificate Information: 6463 S CIMARRON ST 90047

Application / Permit
20014-10000-03767
Plan Check / Job No.
B20LA15815
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW MASTER BEDROOM ADDITION TO INCLUDE CLOSET AND BATH TO REAR OF (E) SFD. WORK PER ENGR DESIGN
Permit Issued
Issued on 1/21/2021
Issuing Office
Current Status
Issued on 1/21/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/1/2020 APPLICANT
Assigned to Plan Check Engineer 9/4/2020 TSE MING HUANG
Corrections Issued 9/4/2020 TSE MING HUANG
Applicant returned to address corrections 10/20/2020 ADAM HEGAZI
Applicant returned to address corrections 12/17/2020 ADAM HEGAZI
Plan Check Approved 1/11/2021 LUKE GONZALES
Issued 1/21/2021 APPLICANT
Building Plans Picked Up 1/22/2021 APPLICANT

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 10/26/2020 RAFAEL FONTES
Eng Process Fee Ord 176,300 Cleared 12/9/2020 THOMAS LANG
Roof/Waste drainage to street Cleared 12/9/2020 THOMAS LANG
Sewer availability Cleared 12/9/2020 THOMAS LANG

Contact Information

Contractor Zurich Home Design; Lic. No.: 1069378-B 2311 W 29TH PL      LOS ANGELES, CA 90018
Engineer Tamu,, O C; Lic. No.: C29787 P O BOX 17083      LONG BEACH, CA 90807

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 2/9/2021 Approved FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 2/19/2021 Corrections Issued FREDDIE RIVERA
Insulation 2/19/2021 Partial Approval FREDDIE RIVERA
PLUMBING-Rough 2/19/2021 Partial Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 2/26/2021 Partial Approval FREDDIE RIVERA
Insulation 2/26/2021 Partial Approval FREDDIE RIVERA
PLUMBING-Rough 2/26/2021 Partial Approval FREDDIE RIVERA
BUILDING-Rough-Frame 3/2/2021 Not Ready for Inspection FREDDIE RIVERA
FLOOD-Proofing Certificate 3/2/2021 Approved FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 3/2/2021 Partial Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 3/9/2021 Partial Approval FREDDIE RIVERA
Deputy Wood Construction 3/11/2021 No Access for Inspection ELMER BLAND
BUILDING-Rough-Frame 3/12/2021 Not Ready for Inspection FREDDIE RIVERA
ELECTRICAL-Rough 3/12/2021 Approved FREDDIE RIVERA
Green Building Rough 3/12/2021 Approved FREDDIE RIVERA
PLUMBING-Rough 3/12/2021 Approved FREDDIE RIVERA
Insulation 3/18/2021 Approved FREDDIE RIVERA
Interior/Exterior Lathing 3/18/2021 Approved FREDDIE RIVERA
Shower Pan 3/18/2021 Approved FREDDIE RIVERA
Drywall Nailing 3/23/2021 Approved SABAS ALONSO
Green Building Rough 3/23/2021 Approved SABAS ALONSO
BUILDING-Rough-Frame 4/28/2021 Approved FREDDIE RIVERA
ELECTRICAL-Final 4/28/2021 Approved FREDDIE RIVERA
FLOOD-Elevation Certificate 4/28/2021 Approved FREDDIE RIVERA
Final 4/28/2021 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 4/28/2021 Approved FREDDIE RIVERA
Green Building Final 4/28/2021 Approved FREDDIE RIVERA
PLUMBING-Final 4/28/2021 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 4/28/2021 SGSOV Approved FREDDIE RIVERA
Smoke Detectors 4/28/2021 Approved FREDDIE RIVERA
Final 5/19/2021 Corrections Issued DAVID FEILER
Final 6/2/2021 Not Ready for Inspection FREDDIE RIVERA