2481 S PATRICIA AVE 90064

Certificate Information: 2481 S PATRICIA AVE 90064

Application / Permit
20014-10000-03604
Plan Check / Job No.
B20LA15178
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION TO (E) SFD FOR A WALK-IN CLOSET TO THE EXISTING MASTER BEDROOM AND CONVERT THE EXISTING CLOSET TO A LINEN CLOSET.
Permit Issued
Issued on 12/29/2020
Issuing Office
Current Status
CofO Issued on 9/22/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/25/2020 APPLICANT
Assigned to Plan Check Engineer 8/26/2020 LUKE GONZALES
Corrections Issued 8/26/2020 LUKE GONZALES
Applicant returned to address corrections 10/19/2020 FERNANDO FLORES
Applicant returned to address corrections 11/16/2020 CRISTINA SALAZAR
Building Plans Picked Up 11/24/2020 APPLICANT
Plan Check Approved 12/16/2020 LUKE GONZALES
Plan Check Approved 12/29/2020 LUKE GONZALES
Issued 12/29/2020 APPLICANT
CofO in Progress 9/15/2021 KEVIN SARGSYAN
Permit Finaled 9/22/2021 KENNETH NAGLE
CofO Issued 9/22/2021 KENNETH NAGLE
Permit Finaled 9/22/2021 KENNETH NAGLE

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 9/28/2020 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 10/9/2020 JEANIE LAM
Grading Pre-Inspection Cleared 11/30/2020 BRIAN MILLER

Contact Information

Contractor Cedar Construction & Development Inc; Lic. No.: 554550-B 10234 NATIONAL BLVD #1      LOS ANGELES, CA 90034
Engineer Singh,, Jasbir; Lic. No.: C38767 16194 EASTRIDGE CT      CHINO HILLS, CA 91709

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 1/14/2021 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 2/8/2021 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 2/8/2021 Approved KEVIN SARGSYAN
Wood Frame 2/8/2021 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 2/12/2021 Partial Approval KEVIN SARGSYAN
Green Building Rough 2/12/2021 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 2/12/2021 Approved KEVIN SARGSYAN
METHANE-Rough 2/12/2021 Approved KEVIN SARGSYAN
Insulation 2/17/2021 Approved RICHARD ROBLES
Drywall Nailing 2/22/2021 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 7/2/2021 Approved KEVIN SARGSYAN
Final 7/2/2021 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 7/2/2021 Approved KEVIN SARGSYAN
Green Building Final 7/2/2021 Not Ready for Inspection KEVIN SARGSYAN
METHANE-Barrier 7/2/2021 Approved KEVIN SARGSYAN
METHANE-Subgrade 7/2/2021 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 7/2/2021 SGSOV Not Ready KEVIN SARGSYAN
Smoke Detectors 7/2/2021 Not Ready for Inspection KEVIN SARGSYAN
Final 9/15/2021 OK to Issue CofO KEVIN SARGSYAN
Green Building Final 9/15/2021 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 9/15/2021 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 9/15/2021 Approved KEVIN SARGSYAN