1249 S MUIRFIELD ROAD 90019

Certificate Information: 1249 S MUIRFIELD ROAD 90019

Application / Permit
20014-10000-03142
Plan Check / Job No.
B20LA13195
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
PROPOSED 1-STORY ADDITION (415 SQFT) TO EXISTING DUPLEX TO CREATE TO EXTEND (E) BEDROOM AND CREATE KITCHEN. SCOPE OF WORK WILL ALSO INCLUDE AN INTERIOR REMODEL TO EXISTING UNITS. ***SHALL BE SPRINKLERED PER NFPA 13 D*** 1 OF 2
Permit Issued
Issued on 5/25/2021
Issuing Office
Current Status
CofO Issued on 3/19/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/3/2020 APPLICANT
Assigned to Plan Check Engineer 8/27/2020 MICHAEL LOPEZ
Corrections Issued 9/3/2020 MICHAEL LOPEZ
Quality Review Completed 9/14/2020 PRANITA SHAH
Applicant returned to address corrections 3/23/2021 MICHAEL LOPEZ
Plan Check Approved 5/6/2021 MICHAEL LOPEZ
Building Plans Picked Up 5/7/2021 APPLICANT
Issued 5/25/2021 APPLICANT
CofO in Progress 11/23/2022 STUART CHAPMAN
Permit Finaled 3/19/2023 DEROLD HAUFF
CofO Issued 3/19/2023 DEROLD HAUFF
Permit Finaled 3/19/2023 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/28/2020 ELAINE LEI
Tenant Habitability Plan Cleared 10/6/2020 MICHAEL GREGERSON
Flood clearance Cleared 11/17/2020 RAYMOND LAM
Low Impact Development Cleared 2/18/2021 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 2/22/2021 ROSA SILVA

Contact Information

Contractor Primary Construction & Development Inc; Lic. No.: 1035793-B 3925 CHEVY CHASE DR      LA CANADA FLINTRIDGE, CA 91011
Engineer Lee,, Sang Youck; Lic. No.: S3821 3531 BROOKHILL ST      GLENDALE, CA 91214

Inspector Information

JUSTIN HAWLEY, (213) 202-3432 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/28/2021 Conditional Approval CALEB MEISTER
Excavation/Setback/Form/Re-Bar 6/2/2021 Corrections Issued STUART CHAPMAN
Excavation/Setback/Form/Re-Bar 6/16/2021 Approved CRAIG VAUGHAN
Deputy Reinf. Concrete 6/18/2021 No Access for Inspection ELMER BLAND
Deputy Drilled-In Anchors 8/17/2021 Conditional Approval CALEB MEISTER
Deputy Wood Construction 8/17/2021 Conditional Approval CALEB MEISTER
BUILDING-Rough-Frame 11/19/2021 Corrections Issued STUART CHAPMAN
ELECTRICAL-Rough 11/19/2021 Approved STUART CHAPMAN
FLOOD-Proofing Certificate 11/19/2021 Approved STUART CHAPMAN
Green Building Rough 11/19/2021 Corrections Issued STUART CHAPMAN
HVAC-Rough 11/19/2021 Corrections Issued STUART CHAPMAN
METHANE-Rough 11/19/2021 Approved STUART CHAPMAN
PLUMBING-Rough 11/22/2021 Approved STUART CHAPMAN
BUILDING-Rough-Frame 12/15/2021 Approved STUART CHAPMAN
Floor/Roof Diaphrgm/Shear Wall 12/15/2021 Partial Approval STUART CHAPMAN
Green Building Rough 12/15/2021 Not Ready for Inspection STUART CHAPMAN
HVAC-Rough 12/15/2021 Approved STUART CHAPMAN
Interior/Exterior Lathing 1/24/2022 Partial Approval STUART CHAPMAN
Insulation 2/18/2022 Approved STUART CHAPMAN
Shower Pan 2/18/2022 Approved STUART CHAPMAN
Drywall Nailing 3/8/2022 Approved STUART CHAPMAN
BUILDING-Rough-Frame 9/9/2022 Approved STUART CHAPMAN
ELECTRICAL-Final 9/9/2022 Not Ready for Inspection STUART CHAPMAN
FLOOD-Elevation Certificate 9/9/2022 Approved STUART CHAPMAN
Final 9/9/2022 Corrections Issued STUART CHAPMAN
Footing/Foundation/Slab 9/9/2022 Approved STUART CHAPMAN
Green Building Final 9/9/2022 Approved STUART CHAPMAN
Green Building Rough 9/9/2022 Approved STUART CHAPMAN
HVAC-Final 9/9/2022 Not Ready for Inspection STUART CHAPMAN
METHANE-Barrier 9/9/2022 Approved STUART CHAPMAN
METHANE-Subgrade 9/9/2022 Approved STUART CHAPMAN
PLUMBING-Final 9/9/2022 Not Ready for Inspection STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 9/9/2022 SGSOV Not Ready STUART CHAPMAN
Smoke Detectors 9/9/2022 Not Ready for Inspection STUART CHAPMAN
ELECTRICAL-Final 9/15/2022 Approved STUART CHAPMAN
Final 9/15/2022 Not Ready for Inspection STUART CHAPMAN
HVAC-Final 9/15/2022 Approved STUART CHAPMAN
PLUMBING-Final 9/15/2022 Approved STUART CHAPMAN
Service/Power Release 10/3/2022 Approved STUART CHAPMAN
Final 11/22/2022 OK to Issue CofO STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 11/22/2022 SGSOV Approved STUART CHAPMAN
Smoke Detectors 11/22/2022 Approved STUART CHAPMAN