5237 W 21ST ST UNIT A,B 90016

Certificate Information: 5237 W 21ST ST UNIT A,B 90016

Application / Permit
20014-10000-02050
Plan Check / Job No.
B20LA08799
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
23'X32' ADDTION TO (E) ONE STORY SFD TO CREATE 3 STORY DUPLEX WITH RECREATION ROOM, ATTACHED GARAGE PER ENGINEER DESIGN AND DETAILS (NFPA 13D THRUOUT)
Permit Issued
Issued on 11/8/2022
Issuing Office
Metro
Current Status
CofO Issued on 3/9/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/15/2020 APPLICANT
Assigned to Plan Check Engineer 6/11/2020 AUNG SOE
Corrections Issued 6/15/2020 AUNG SOE
Quality Review Completed 7/1/2020 QUAN NGHIEM
Building Plans Picked Up 7/7/2020 APPLICANT
Plan Check Approved 11/4/2022 AUNG SOE
Issued 11/8/2022 APPLICANT
CofO in Progress 2/24/2025 ARTHUR NEGRETE
Permit Finaled 3/9/2025 DEROLD HAUFF
CofO Issued 3/9/2025 DEROLD HAUFF
Permit Finaled 3/9/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/16/2020 JEANIE LAM
Highway dedication Cleared 7/16/2020 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 7/17/2020 JEANIE LAM
Sewer availability Cleared 7/17/2020 JEANIE LAM
Frnt yard landscape/Water mgmt Cleared 7/14/2022 MAYELA VILLA
Low Impact Development Cleared 9/1/2022 LONDY ALVARADO
Hydrant and Access approval Cleared 9/2/2022 MATTHEW CRAIG
Roof/Waste drainage to street Cleared 9/3/2022 JEANETTE VONG
Green Code Cleared 11/4/2022 AUNG SOE

Contact Information

Contractor Perez Home Development; Lic. No.: 1060136-B 17992 IOLITE LOOP      SAN BERNARDINO, CA 92407
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 12/15/2022 Corrections Issued JOSE AVILA
Footing/Foundation/Slab 12/15/2022 Corrections Issued JOSE AVILA
Pre-Inspection 12/15/2022 Approved JOSE AVILA
Excavation/Setback/Form/Re-Bar 12/19/2022 Approved JOSE AVILA
Footing/Foundation/Slab 12/27/2022 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 1/20/2023 Corrections Issued JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 1/23/2023 Partial Approval JOSE AVILA
Wood Frame 1/23/2023 Partial Approval JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 2/1/2023 Approved JOSE AVILA
Structural Steel Frame 2/1/2023 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 2/9/2023 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 2/27/2023 Partial Approval JOSE AVILA
Gas Test 4/5/2023 Approved MICHAEL LEWIS
PLUMBING-Rough 4/13/2023 Partial Approval JOSE AVILA
ELECTRICAL-Rough 4/28/2023 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 5/16/2023 Approved JOSE AVILA
Shower Pan 6/13/2023 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 7/7/2023 Corrections Issued JOSE AVILA
Special/Order Compliance 7/7/2023 Corrections Issued RONNIE MINDANAO
Deputy Wood Construction 7/14/2023 Approved DONALD CRICHLOW
Floor/Roof Diaphrgm/Shear Wall 7/17/2023 Approved JOSE AVILA
BUILDING-Rough-Frame 8/8/2023 Conditional Approval JOSE AVILA
Interior/Exterior Lathing 8/8/2023 Approved JOSE AVILA
Insulation 8/14/2023 Conditional Approval JOSH MEISTER
Drywall Nailing 8/16/2023 Approved JOSE AVILA
Special/Order Compliance 8/16/2023 Approved RONNIE MINDANAO
Interior/Exterior Lathing 8/29/2023 Approved LILIANA PORTILLO
Underground Mechanical 11/1/2023 Partial Approval JOSE AVILA
Gas Test 12/22/2023 Approved SABAS ALONSO
PLUMBING-Final 12/22/2023 Corrections Issued SABAS ALONSO
ELECTRICAL-Final 2/6/2024 Not Ready for Inspection STUART CHAPMAN
Final 2/6/2024 Corrections Issued STUART CHAPMAN
HVAC-Final 2/6/2024 Not Ready for Inspection STUART CHAPMAN
PLUMBING-Final 2/6/2024 Approved STUART CHAPMAN
ELECTRICAL-Final 3/12/2024 Not Ready for Inspection STUART CHAPMAN
Final 3/12/2024 Corrections Issued STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 9/18/2024 SGSOV Not Ready ARTHUR NEGRETE
BUILDING-Rough-Frame 11/21/2024 Approved ENRIQUE MIRELES
ELECTRICAL-Final 11/21/2024 Approved ENRIQUE MIRELES
Final 11/21/2024 Corrections Issued ENRIQUE MIRELES
Green Building Final 11/21/2024 Approved ENRIQUE MIRELES
Green Building Rough 11/21/2024 Approved ENRIQUE MIRELES
HVAC-Final 11/21/2024 Approved ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 11/21/2024 SGSOV Approved ENRIQUE MIRELES
Service/Power Release 11/21/2024 Not Ready for Inspection ENRIQUE MIRELES
Smoke Detectors 11/21/2024 Approved ENRIQUE MIRELES
Final 12/3/2024 Conditional Approval ENRIQUE MIRELES
ELECTRICAL-Final 2/21/2025 Approved ARTHUR NEGRETE
Final 2/21/2025 OK to Issue CofO ARTHUR NEGRETE
Service/Power Release 2/21/2025 Approved ARTHUR NEGRETE