5371-5373 E ITHACA AVE 90032

Certificate Information: 5371-5373 E ITHACA AVE 90032

Application / Permit
20014-10000-01730
Plan Check / Job No.
B20LA07362
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Convert attached garage to ADU per State Law and addition of irregular size to the rear of (E) SFD to create new bedrooms and bathrooms, remodel throughout
Permit Issued
Issued on 12/3/2025
Issuing Office
Metro
Current Status
Issued on 12/3/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/23/2020 APPLICANT
Assigned to Plan Check Engineer 4/23/2020 LUKE GONZALES
Corrections Issued 4/24/2020 LUKE GONZALES
Applicant returned to address corrections 8/24/2020 ZAW HAN
Plan Check Approved 8/26/2020 ZAW HAN
Building Plans Picked Up 9/1/2020 APPLICANT
No Progress 5/19/2023 LAWRENCE QUIRANTE
Plan Check Approved 6/16/2023 JOSEPH RAFOLS
Plan Check Approved 12/3/2025 ZAW HAN
Issued 12/3/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 5/15/2020 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 5/15/2020 JEANIE LAM
Sewer availability Cleared 5/15/2020 JEANIE LAM
Miscellaneous Cleared 5/28/2020 ARMEN MEHRABIAN
Low Impact Development Cleared 8/13/2020 ROBIN YAMADA
Roof/Waste drainage to street Cleared 8/17/2020 JEANIE LAM
Grading Pre-Inspection Cleared 8/19/2020 PATRICK MISCHLICH

Contact Information

Contractor Dfl Design + Build; Lic. No.: 1046215-B 1005 E LAS TUNAS DR # 634      SAN GABRIEL, CA 91776
Engineer Medina,, Armando; Lic. No.: C83911 2000 W LINCOLN AVE      MONTEBELLO, CA 90640

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/20/2026 Conditional Approval LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 1/22/2026 Approved LILIANA PORTILLO
Footing/Foundation/Slab 1/22/2026 Approved LILIANA PORTILLO
PLUMBING-Rough 1/22/2026 Partial Approval LILIANA PORTILLO
BUILDING-Rough-Frame 2/2/2026 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 2/2/2026 Partial Approval LILIANA PORTILLO
Sewer 2/2/2026 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 4/1/2026 Not Ready for Inspection LILIANA PORTILLO
Rough-Elec/Plmb/HVAC 4/1/2026 Corrections Issued LILIANA PORTILLO
Shower Pan 4/1/2026 Not Ready for Inspection LILIANA PORTILLO
BUILDING-Rough-Frame 4/3/2026 Approved Pending GreenApproval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 4/3/2026 Approved LILIANA PORTILLO
Rough-Elec/Plmb/HVAC 4/3/2026 Approved LILIANA PORTILLO
Shower Pan 4/3/2026 Approved LILIANA PORTILLO
Verify Sprinkler Sign Off 4/3/2026 Approved LILIANA PORTILLO
Insulation 4/14/2026 Approved RONNIE MEDINA
Interior/Exterior Lathing 4/14/2026 Partial Approval RONNIE MEDINA
Drywall Nailing 4/21/2026 Approved GEM DE OCAMPO
Interior/Exterior Lathing 5/12/2026 Approved GEM DE OCAMPO