2906 W RESERVOIR ST 90026

Certificate Information: 2906 W RESERVOIR ST 90026

Application / Permit
20014-10000-01306
Plan Check / Job No.
B20LA05593
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1. CONVERT (E) (2) UNIT APARTMENT TO A SINGLE FAMILY DWELLING. 2. PROPOSED 393 SF (2) STORY ADDITION AT THE BACK OF THE HOUSE TO ENLARGE & RELOCATE THE KTICHEN, DINING ROOM, NEW BATHROOM AND NEW LAUNDRY ROOM. 3. INTERIOR REMODELING TO CONVERT EXISTING FAMILY ROOM TO NEW BEDROOM AND POWDER.
Permit Issued
Issued on 3/15/2021
Issuing Office
Current Status
CofO Issued on 8/13/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/19/2020 APPLICANT
Assigned to Plan Check Engineer 3/26/2020 RACHEL BEYENE
Corrections Issued 4/2/2020 RACHEL BEYENE
Quality Review Completed 4/8/2020 STANLEY RAAP
Building Plans Picked Up 5/7/2020 APPLICANT
Green Plans Picked Up 8/28/2020 APPLICANT
Applicant returned to address corrections 2/26/2021 RACHEL BEYENE
Plan Check Approved 3/11/2021 RAHEL BEYENE
Issued 3/15/2021 APPLICANT
CofO in Progress 6/18/2022 THOMAS LOGRASSO
Permit Finaled 8/13/2022 DEROLD HAUFF
CofO Issued 8/13/2022 DEROLD HAUFF
Permit Finaled 8/13/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/6/2020 RENZ SORIANO
BHO/Hillside ordinance Cleared 7/6/2020 RENZ SORIANO
BHO/Hillside ordinance Cleared 7/6/2020 RENZ SORIANO
Roof/Waste drainage to street Cleared 7/6/2020 RENZ SORIANO
Sewer availability Cleared 7/6/2020 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 7/8/2020 RENZ SORIANO
Green Code Cleared 8/27/2020 KHEDER ALRAZAA
Demo/Removal of Rental Units Cleared 12/21/2020 RUZENKA BENEDETTO
Tenant Habitability Plan Cleared 1/8/2021 PHILLIP MUNGUIA

Contact Information

Contractor H H K C Development Inc; Lic. No.: 1045968-B P O BOX 205      SAN GABRIEL, CA 91778
Engineer Lu,, Yi; Lic. No.: S5678 P O BOX 2754      PALOS VERDES PENINSULA, CA 90274

Inspector Information

HAMIK HARTOUNIAN, (213) 202-3275 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 3/19/2021 Corrections Issued STUART CHAPMAN
Footing/Foundation/Slab 3/19/2021 Not Ready for Inspection STUART CHAPMAN
Excavation/Setback/Form/Re-Bar 3/26/2021 Approved STUART CHAPMAN
Footing/Foundation/Slab 3/26/2021 Approved STUART CHAPMAN
BUILDING-Rough-Frame 4/13/2021 Partial Approval ROBERT VORHIS
Green Building Rough 4/13/2021 Not Ready for Inspection ROBERT VORHIS
PLUMBING-Rough 4/13/2021 Partial Approval ROBERT VORHIS
ELECTRICAL-Rough 6/7/2021 Approved ROBERT VORHIS
Floor/Roof Diaphrgm/Shear Wall 6/7/2021 Not Ready for Inspection ROBERT VORHIS
HVAC-Rough 6/7/2021 Approved ROBERT VORHIS
PLUMBING-Rough 6/7/2021 Approved ROBERT VORHIS
Floor/Roof Diaphrgm/Shear Wall 6/14/2021 Partial Approval ROBERT VORHIS
Deputy Drilled-In Anchors 6/28/2021 Approved RONALD KIDWELL
Footing/Foundation/Slab 7/2/2021 Partial Approval JOSEPH MCGARRY
Wood Frame 7/7/2021 No Access for Inspection SCOTT FINNILA
Wood Frame 7/13/2021 Partial Approval SCOTT FINNILA
BUILDING-Rough-Frame 7/27/2021 Corrections Issued THOMAS LOGRASSO
Interior/Exterior Lathing 7/27/2021 Conditional Approval THOMAS LOGRASSO
Insulation 8/10/2021 Corrections Issued THOMAS LOGRASSO
Drywall Nailing 9/3/2021 Approved THOMAS LOGRASSO
Green Building Rough 9/3/2021 Approved THOMAS LOGRASSO
Special/Order Compliance 9/30/2021 Corrections Issued THOMAS LOGRASSO
Interior/Exterior Lathing 11/2/2021 Approved ALIZAH MAYAGOITIA
Shower Pan 11/2/2021 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
ELECTRICAL-Final 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
Final 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
Footing/Foundation/Slab 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
Green Building Final 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
HVAC-Final 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
PLUMBING-Final 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
SGSOV-Seismic Gas S/O Valve 4/1/2022 SGSOV Not Ready THOMAS LOGRASSO
Service/Power Release 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
Smoke Detectors 4/1/2022 Not Ready for Inspection THOMAS LOGRASSO
BUILDING-Rough-Frame 5/27/2022 Approved THOMAS LOGRASSO
ELECTRICAL-Final 5/27/2022 Corrections Issued THOMAS LOGRASSO
Final 5/27/2022 Corrections Issued THOMAS LOGRASSO
Footing/Foundation/Slab 5/27/2022 Approved THOMAS LOGRASSO
Green Building Final 5/27/2022 Not Ready for Inspection THOMAS LOGRASSO
HVAC-Final 5/27/2022 Corrections Issued THOMAS LOGRASSO
PLUMBING-Final 5/27/2022 Corrections Issued THOMAS LOGRASSO
SGSOV-Seismic Gas S/O Valve 5/27/2022 SGSOV Not Ready THOMAS LOGRASSO
Smoke Detectors 5/27/2022 Approved THOMAS LOGRASSO
ELECTRICAL-Final 6/7/2022 Not Ready for Inspection THOMAS LOGRASSO
Final 6/7/2022 Not Ready for Inspection THOMAS LOGRASSO
Green Building Final 6/7/2022 Approved THOMAS LOGRASSO
HVAC-Final 6/7/2022 Not Ready for Inspection THOMAS LOGRASSO
PLUMBING-Final 6/7/2022 Not Ready for Inspection THOMAS LOGRASSO
SGSOV-Seismic Gas S/O Valve 6/7/2022 SGSOV Not Ready THOMAS LOGRASSO
Service/Power Release 6/7/2022 Not Ready for Inspection THOMAS LOGRASSO
ELECTRICAL-Final 6/14/2022 Conditional Approval THOMAS LOGRASSO
Final 6/14/2022 Corrections Issued THOMAS LOGRASSO
HVAC-Final 6/14/2022 Approved THOMAS LOGRASSO
PLUMBING-Final 6/14/2022 Approved THOMAS LOGRASSO
SGSOV-Seismic Gas S/O Valve 6/14/2022 SGSOV Not Ready THOMAS LOGRASSO
Service/Power Release 6/14/2022 Not Ready for Inspection THOMAS LOGRASSO
ELECTRICAL-Final 6/17/2022 Approved THOMAS LOGRASSO
Final 6/17/2022 OK to Issue CofO THOMAS LOGRASSO
SGSOV-Seismic Gas S/O Valve 6/17/2022 SGSOV Approved THOMAS LOGRASSO