202 N BEACHWOOD DR 90004

Certificate Information: 202 N BEACHWOOD DR 90004

Application / Permit
20014-10000-00958
Plan Check / Job No.
B20LA04164
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW ADDITION AT REAR OF (E) SINGLE FAMILY DWELLING. EXISTING DOORS AND WINDOWS TO REMAIN. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 3/20/2020
Issuing Office
West Los Angeles
Current Status
CofO Issued on 12/2/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/2/2020 APPLICANT
Assigned to Plan Check Engineer 3/2/2020 KEVIN MORALES
Corrections Issued 3/2/2020 KEVIN MORALES
Applicant returned to address corrections 3/20/2020 KAVIAN REFAHI
Plan Check Approved 3/20/2020 PARISA ZAHABI
Issued 3/20/2020 LADBS
CofO in Progress 11/30/2020 JOSEPH MCGARRY
Permit Finaled 12/2/2020 DEROLD HAUFF
CofO Issued 12/2/2020 DEROLD HAUFF
Permit Finaled 12/2/2020 DEROLD HAUFF

Permit Application Clearance Information

City Hist. Cultural Monument Cleared 3/20/2020 LYDIA CHAPMAN
Eng Process Fee Ord 176,300 Cleared 3/20/2020 DINAH GARIN
HPOZ Cleared 3/20/2020 LYDIA CHAPMAN
Historic monument Cleared 3/20/2020 LYDIA CHAPMAN
Roof/Waste drainage to street Cleared 3/20/2020 DINAH GARIN

Contact Information

Engineer Phillips,, Craig Richard; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

RONNIE MINDANAO, (213) 202-3252 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/18/2020 Conditional Approval THOMAS LOGRASSO
Excavation/Setback/Form/Re-Bar 5/18/2020 Not Ready for Inspection ARTHUR SARGSYAN
Footing/Foundation/Slab 5/18/2020 Not Ready for Inspection ARTHUR SARGSYAN
METHANE-Barrier 5/18/2020 Not Ready for Inspection ARTHUR SARGSYAN
METHANE-Subgrade 5/18/2020 Not Ready for Inspection ARTHUR SARGSYAN
Excavation/Setback/Form/Re-Bar 5/20/2020 Corrections Issued ARTHUR SARGSYAN
Deputy Drilled-In Anchors 5/22/2020 Approved ARTHUR SARGSYAN
Footing/Foundation/Slab 5/22/2020 Approved ARTHUR SARGSYAN
METHANE-Barrier 5/22/2020 Approved ARTHUR SARGSYAN
METHANE-Subgrade 5/22/2020 Approved ARTHUR SARGSYAN
Wood Frame 5/28/2020 Partial Approval ARTHUR SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 5/29/2020 Approved ARTHUR SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/17/2020 Approved ARTHUR SARGSYAN
BUILDING-Rough-Frame 7/13/2020 Approved ARTHUR SARGSYAN
ELECTRICAL-Rough 7/13/2020 Approved ARTHUR SARGSYAN
Green Building Rough 7/13/2020 Approved ARTHUR SARGSYAN
HVAC-Rough 7/13/2020 Approved ARTHUR SARGSYAN
METHANE-Rough 7/13/2020 Approved ARTHUR SARGSYAN
PLUMBING-Rough 7/13/2020 Approved ARTHUR SARGSYAN
Insulation 7/29/2020 Approved CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 7/29/2020 Partial Approval CHRISTOPHER DELLEFIELD
Drywall Nailing 8/6/2020 Approved ARTHUR SARGSYAN
Final 11/16/2020 Not Ready for Inspection DONALD CRICHLOW
Green Building Final 11/16/2020 Not Ready for Inspection DONALD CRICHLOW
SGSOV-Seismic Gas S/O Valve 11/16/2020 SGSOV Not Ready DONALD CRICHLOW
Smoke Detectors 11/16/2020 Not Ready for Inspection DONALD CRICHLOW
ELECTRICAL-Final 11/23/2020 Approved JOSEPH MCGARRY
Final 11/23/2020 Corrections Issued JOSEPH MCGARRY
Green Building Final 11/23/2020 Approved JOSEPH MCGARRY
HVAC-Final 11/23/2020 Approved JOSEPH MCGARRY
PLUMBING-Final 11/23/2020 Approved JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 11/23/2020 SGSOV Approved JOSEPH MCGARRY
Smoke Detectors 11/23/2020 Approved JOSEPH MCGARRY
Final 11/30/2020 OK to Issue CofO JOSEPH MCGARRY