3732 S BOISE AVE 90066

Certificate Information: 3732 S BOISE AVE 90066

Application / Permit
20014-10000-00668
Plan Check / Job No.
B20LA02858
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED ONE STORY ADDITION (9'X5', 40 SF) TO REAR OF (E) SINGLE FAMILY DEWLLING. REMODEL TO MASTER BEDROOM AND ADD (N) 3/4 BATHROOM WITH WALK-IN CLOSET.
Permit Issued
Issued on 2/19/2020
Issuing Office
Metro
Current Status
CofO Issued on 6/11/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/13/2020 APPLICANT
Assigned to Plan Check Engineer 2/13/2020 MIGUEL JIMENEZ
Plan Check Approved 2/19/2020 AUNG SOE
Issued 2/19/2020 LADBS
CofO in Progress 6/9/2020 DAVID FEILER
Permit Finaled 6/11/2020 VINCENT COTTON
CofO Issued 6/11/2020 VINCENT COTTON
Permit Finaled 6/11/2020 VINCENT COTTON

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/13/2020 JEANETTE VONG
Grading Pre-Inspection Cleared 2/13/2020 KIRK LINKLATER
Roof/Waste drainage to street Cleared 2/13/2020 JEANETTE VONG

Contact Information

Contractor Gutierrez Joe M Construction; Lic. No.: 644407-B 12621 VICTORIA AVENUE      LOS ANGELES, CA 90066
Engineer Benavides,, Jose Alexander; Lic. No.: C72968 644 N POPLAR ST UNIT B      ORANGE, CA 92868

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/27/2020 Approved OGANES TARAKHCHYAN
BUILDING-Rough-Frame 3/3/2020 Partial Approval DAVID FEILER
Green Building Rough 3/3/2020 Not Ready for Inspection DAVID FEILER
BUILDING-Rough-Frame 3/23/2020 Corrections Issued DAVID FEILER
ELECTRICAL-Rough 3/23/2020 Partial Inspection DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 3/23/2020 Partial Approval DAVID FEILER
Green Building Rough 3/23/2020 Not Ready for Inspection DAVID FEILER
Insulation 3/23/2020 Not Ready for Inspection DAVID FEILER
PLUMBING-Rough 3/23/2020 Partial Approval DAVID FEILER
Deputy Wood Construction 3/25/2020 Conditional Approval CRAIG DAVIS
ELECTRICAL-Rough 3/26/2020 Approved DAVID FEILER
PLUMBING-Rough 3/26/2020 Approved DAVID FEILER
Shower Pan 3/26/2020 Not Ready for Inspection DAVID FEILER
Wood Frame 3/26/2020 Partial Approval DAVID FEILER
Interior/Exterior Lathing 4/1/2020 Approved DAVID FEILER
Drywall Nailing 4/6/2020 Approved DAVID HEINE
Green Building Rough 4/6/2020 Approved DAVID HEINE
BUILDING-Rough-Frame 5/28/2020 Approved DAVID FEILER
Final 5/28/2020 OK to Issue CofO DAVID FEILER
Green Building Final 5/28/2020 Approved DAVID FEILER
SGSOV-Seismic Gas S/O Valve 5/28/2020 SGSOV Approved DAVID FEILER
Smoke Detectors 5/28/2020 Approved DAVID FEILER