300 N ROCKINGHAM AVE 90049

Certificate Information: 300 N ROCKINGHAM AVE 90049

Application / Permit
20010-30000-05015
Plan Check / Job No.
B20WL05601
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(n) 2-story SFD (9,725 sf) over 1-level basement (3,262 sf) and 3-car basement garage (1,675 sf)
Permit Issued
Issued on 11/29/2021
Issuing Office
West Los Angeles
Current Status
CofO Issued on 3/11/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/4/2021 APPLICANT
Assigned to Plan Check Engineer 1/14/2021 REZA HAGHIGHAT
Corrections Issued 1/19/2021 REZA HAGHIGHAT
Quality Review Completed 1/28/2021 TARIK SAOUD
Applicant returned to address corrections 5/29/2021 REZA HAGHIGHAT
Plan Check Approved 11/17/2021 REZA HAGHIGHAT
Issued 11/29/2021 APPLICANT
Building Plans Picked Up 5/12/2022 APPLICANT
CofO in Progress 3/3/2025 KEVIN SARGSYAN
Permit Finaled 3/11/2025 RICHARD STEINBACH
CofO Issued 3/11/2025 RICHARD STEINBACH
Permit Finaled 3/11/2025 RICHARD STEINBACH

Permit Application Clearance Information

ZA Case Cleared 2/4/2021 LOUIS ORTEGA
Eng Process Fee Ord 176,300 Cleared 2/26/2021 HISASHI KOBAYAKAWA
Sewer availability Cleared 2/26/2021 HISASHI KOBAYAKAWA
Permit Cleared 3/2/2021 HISASHI KOBAYAKAWA
Hydrant and Access approval Cleared 3/3/2021 JOHN CONNEALLY
Grading Pre-Inspection Cleared 5/29/2021 REZA HAGHIGHAT
Trees in Parkway Cleared 6/8/2021 JOHN KIM
Low Impact Development Cleared 10/26/2021 TA ANH
Roof/Waste drainage to street Cleared 11/3/2021 HISASHI KOBAYAKAWA
Excavation more than 5-ft deep Cleared 11/17/2021 CALOSHA APPROVED

Contact Information

Contractor Hanover Builders Inc; Lic. No.: 709353-B 141 DUESENBERG DRIVE STE 6      WESTLAKE VILLAGE, CA 91362
Engineer Galbreath,, Sean Martin; Lic. No.: S5653 600 SOUTH LAKE AVE STE 308      PASADENA, CA 91106
Engineer White,, William Michael; Lic. No.: C62111 19619 MATHILDE LN      SAUGUS, CA 91350
Geologist Feffer,, Joshua Rafael; Lic. No.: EG2138 12253 GORHAM AVE      LOS ANGELES, CA 90049

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/10/2021 Partial Inspection JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/8/2022 Not Ready for Inspection JUAN VALENZUELA
PLUMBING-Rough 2/28/2022 Partial Approval JOHN KIDWELL
Excavation/Setback/Form/Re-Bar 3/10/2022 Partial Approval MICHAEL PELHAM
Footing/Foundation/Slab 3/10/2022 Corrections Issued MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 4/7/2022 Not Ready for Inspection JUAN VALENZUELA
Pre-Inspection 4/7/2022 Partial Inspection JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 4/15/2022 Partial Approval OGANES TARAKHCHYAN
Deputy Shotcrete 4/19/2022 Conditional Approval MICHAEL PELHAM
Deputy Drilled-In Anchors 5/2/2022 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 5/11/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 5/11/2022 Corrections Issued CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/12/2022 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/16/2022 Partial Approval ANDREW NAVE
Deputy Reinf. Concrete 5/17/2022 Conditional Approval ANDREW NAVE
Excavation/Setback/Form/Re-Bar 5/26/2022 Partial Approval BRENDAN LOONEY
Deputy Steel/Welding 6/6/2022 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 6/9/2022 Approved MICHAEL PELHAM
PLUMBING-Rough 6/13/2022 Partial Inspection JUAN VALENZUELA
Deputy Steel/Welding 6/17/2022 Conditional Approval JUAN VALENZUELA
PLUMBING-Rough 6/21/2022 Corrections Issued JUAN VALENZUELA
Deputy Steel/Welding 6/22/2022 Conditional Approval MICHAEL PELHAM
Underground Mechanical 6/23/2022 Partial Approval JUAN VALENZUELA
Deputy Steel/Welding 6/27/2022 Approved MICHAEL PELHAM
Deputy Steel/Welding 6/28/2022 Approved MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 7/1/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 7/19/2022 Partial Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 8/8/2022 Conditional Approval ANDREW NAVE
Excavation/Setback/Form/Re-Bar 8/10/2022 Approved JUAN VALENZUELA
Deputy Reinf. Concrete 8/16/2022 Corrections Issued JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 9/27/2022 Partial Approval ANDREW NAVE
Floor/Roof Diaphrgm/Shear Wall 11/14/2022 Corrections Issued JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/2/2023 Partial Inspection KEVIN SARGSYAN
Deputy Reinf. Concrete 2/3/2023 Conditional Approval MICHAEL PELHAM
Deputy Shotcrete 2/3/2023 Conditional Approval MICHAEL PELHAM
Wood Frame 2/10/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Floor/Roof Diaphrgm/Shear Wall 2/15/2023 Partial Approval KEVIN SARGSYAN
Insulation 3/17/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 4/20/2023 Partial Approval KEVIN SARGSYAN
Sewer 5/3/2023 Approved KEVIN SARGSYAN
HVAC-Rough 5/9/2023 Corrections Issued KEVIN SARGSYAN
Underground Mechanical 5/15/2023 Partial Approval KEVIN SARGSYAN
HVAC-Rough 5/19/2023 Corrections Issued KEVIN SARGSYAN
HVAC-Rough 6/1/2023 Approved KEVIN SARGSYAN
Underground Mechanical 6/27/2023 Partial Approval EVAN COOPER
PLUMBING-Rough 7/6/2023 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 7/11/2023 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 7/26/2023 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 7/27/2023 Partial Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 7/28/2023 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Rough 7/31/2023 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Rough 8/2/2023 Partial Approval STEPHANIE SWANSON
BUILDING-Rough-Frame 8/3/2023 Corrections Issued KEVIN SARGSYAN
Green Building Rough 8/3/2023 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 8/3/2023 Partial Approval KEVIN SARGSYAN
Verify Sprinkler Sign Off 8/3/2023 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 8/4/2023 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 8/7/2023 Partial Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 8/18/2023 Approved ARAM AVEDISIAN
Insulation 8/22/2023 Approved KEVIN SARGSYAN
Footing/Foundation/Slab 8/29/2023 Not Ready for Inspection KEVIN SARGSYAN
Drywall Nailing 9/18/2023 Approved KEVIN SARGSYAN
Shower Pan 10/6/2023 Approved ARAM AVEDISIAN
Deputy Drilled-In Anchors 10/20/2023 Conditional Approval ARAM AVEDISIAN
Interior/Exterior Lathing 10/20/2023 Partial Approval ARAM AVEDISIAN
Interior/Exterior Lathing 11/1/2023 Partial Approval ARAM AVEDISIAN
Grounding or Bonding 11/6/2023 Partial Inspection KEVIN SARGSYAN
Insulation 1/19/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 2/8/2024 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 2/21/2024 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 5/2/2024 Not Ready for Inspection KEVIN SARGSYAN
Pre-Inspection 9/30/2024 Approved EVAN COOPER
Service/Power Release 10/18/2024 Approved KENNETH NAGLE
ELECTRICAL-Final 11/25/2024 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Final 11/26/2024 Partial Approval JESUS RODRIGUEZ
Footing/Foundation/Slab 12/2/2024 Partial Inspection KEVIN SARGSYAN
ELECTRICAL-Final 12/4/2024 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Final 12/5/2024 Not Ready for Inspection ARAM AVEDISIAN
ELECTRICAL-Final 12/9/2024 Approved KEVIN SARGSYAN
PLUMBING-Final 12/10/2024 Partial Approval KEVIN SARGSYAN
PLUMBING-Final 12/11/2024 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Final 12/18/2024 Approved KEVIN SARGSYAN
HVAC-Final 12/19/2024 Corrections Issued KEVIN SARGSYAN
HVAC-Final 12/24/2024 No Access for Inspection KEVIN SARGSYAN
HVAC-Final 12/26/2024 Approved JESUS RODRIGUEZ
Gas Test 1/29/2025 Approved JESUS RODRIGUEZ
Pool/Spa Cover 1/31/2025 Approved JESUS RODRIGUEZ
ELECTRICAL-Final 2/24/2025 Not Ready for Inspection TEMISTOCLES CAAL
Final 3/3/2025 OK to Issue CofO KEVIN SARGSYAN
Footing/Foundation/Slab 3/3/2025 Approved KEVIN SARGSYAN
Green Building Final 3/3/2025 Approved KEVIN SARGSYAN
Reinforced Concrete Frame 3/3/2025 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 3/3/2025 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 3/3/2025 Approved KEVIN SARGSYAN