854 N CRESCENT HEIGHTS BLVD 90046

Certificate Information: 854 N CRESCENT HEIGHTS BLVD 90046

Application / Permit
20010-30000-04683
Plan Check / Job No.
B20WL05312
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY TYPE VB SINGLE FAMILY DWELLING WITH BASEMENT, ROOF TOP DECK, AND ATATCHED 1-CAR GARAGE, EQUIPPED THROUGHOUT WITH NFPA 13D FIRE SPRINKLERS.
Permit Issued
Issued on 12/12/2021
Issuing Office
Current Status
CofO Issued on 7/2/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/7/2020 APPLICANT
Assigned to Plan Check Engineer 1/6/2021 SERGIO SILVA
Corrections Issued 1/20/2021 SERGIO SILVA
Quality Review Completed 1/28/2021 TARIK SAOUD
Applicant returned to address corrections 6/1/2021 SERGIO SILVA
Plan Check Approved 11/18/2021 SERGIO SILVA
Issued 12/12/2021 APPLICANT
Building Plans Picked Up 12/14/2021 APPLICANT
CofO in Progress 6/26/2024 AMIR NAZARIAN
CofO Issued 7/2/2024 DEROLD HAUFF
Permit Finaled 7/2/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 3/10/2021 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 3/10/2021 RENZ SORIANO
Permit Cleared 3/11/2021 RENZ SORIANO
Miscellaneous Cleared 3/31/2021 SERGIO SILVA
Sewer availability Cleared 3/31/2021 RENZ SORIANO
Trees in Parkway Cleared 4/7/2021 JOHN KIM
Excavation more than 5-ft deep Cleared 5/11/2021 CALOSHA APPROVED
Hydrant and Access approval Cleared 5/19/2021 ROBERT DUFF
Low Impact Development Cleared 6/29/2021 SUNG JOON WON
Work Adjacent to Public Way Cleared 10/12/2021 JOSE RODRIGUEZ
Roof/Waste drainage to street Cleared 10/21/2021 STEVE MELGAR
Green Code Cleared 11/18/2021 SERGIO SILVA

Contact Information

Contractor Owner-Builder       ,
Engineer Baraty,, Patrick; Lic. No.: S5900 1819 SUNSHINE COURT      GLENDALE, CA 91208
Engineer Mahmoudkhani,, Behnam; Lic. No.: C88488 120 W WILSON AVE 1550      GLENDALE, CA 91203
Engineer Nguyen,, Tuan Minh; Lic. No.: S5883 5552 W 123RD PLACE      HAWTHORNE, CA 90250
Engineer Zhang,, Quguang; Lic. No.: L8968 9080 TELSTAR AVE 303      EL MONTE, CA 91731

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 2/8/2022 Partial Approval CHRIS CHRISTENSEN
Footing/Foundation/Slab 2/8/2022 Partial Approval CHRIS CHRISTENSEN
Excavation/Setback/Form/Re-Bar 3/3/2022 Partial Approval CHRIS CHRISTENSEN
PLUMBING-Rough 4/26/2022 Partial Approval ADAM ESCOTO
Excavation/Setback/Form/Re-Bar 5/17/2022 Corrections Issued ADAM ESCOTO
Footing/Foundation/Slab 5/17/2022 Not Ready for Inspection ADAM ESCOTO
Pre-Inspection 5/18/2022 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 6/8/2022 Conditional Approval RYAN SALAZAR
Excavation/Setback/Form/Re-Bar 6/17/2022 Approved JOSEPH MCGARRY
Pre-Inspection 6/17/2022 Approved JOSEPH MCGARRY
Deputy Steel/Welding 7/26/2022 No Access for Inspection JULIAN AMAYA
Deputy Steel/Welding 8/2/2022 No Access for Inspection JULIAN AMAYA
Deputy Steel/Welding 8/3/2022 Approved JULIAN AMAYA
Deputy Wood Construction 8/12/2022 Conditional Approval MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 8/12/2022 Approved MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 9/16/2022 Approved MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 10/7/2022 Approved MICHAEL LEWIS
PLUMBING-Rough 12/22/2022 Approved MICHAEL LEWIS
ELECTRICAL-Rough 1/17/2023 Approved MICHAEL LEWIS
HVAC-Rough 1/23/2023 Approved MICHAEL LEWIS
BUILDING-Rough-Frame 2/21/2023 Partial Approval MICHAEL LEWIS
Green Building Rough 2/21/2023 Approved MICHAEL LEWIS
Verify Sprinkler Sign Off 2/21/2023 Approved MICHAEL LEWIS
Insulation 3/17/2023 Approved MICHAEL LEWIS
Shower Pan 3/29/2023 Not Ready for Inspection MICHAEL LEWIS
Shower Pan 4/5/2023 Approved MICHAEL LEWIS
Drywall Nailing 4/18/2023 Approved RICHARD DOCKUS
Interior/Exterior Lathing 4/18/2023 Approved RICHARD DOCKUS
Interior/Exterior Lathing 5/9/2023 Approved LILIANA PORTILLO
Gas Test 6/21/2023 Approved LILIANA PORTILLO
Sewer 6/21/2023 Approved LILIANA PORTILLO
Underground Mechanical 6/21/2023 Approved LILIANA PORTILLO
Gas Test 8/29/2023 Corrections Issued LILIANA PORTILLO
Gas Test 9/5/2023 Approved LILIANA PORTILLO
ELECTRICAL-Final 10/11/2023 Corrections Issued LILIANA PORTILLO
Final 10/11/2023 Not Ready for Inspection LILIANA PORTILLO
HVAC-Final 10/11/2023 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Final 10/11/2023 Corrections Issued LILIANA PORTILLO
PLUMBING-Final 10/18/2023 Approved LILIANA PORTILLO
ELECTRICAL-Final 10/25/2023 Partial Approval LILIANA PORTILLO
Final 10/25/2023 Not Ready for Inspection LILIANA PORTILLO
BUILDING-Rough-Frame 4/18/2024 Partial Inspection AMIR NAZARIAN
ELECTRICAL-Final 4/18/2024 Partial Inspection AMIR NAZARIAN
Final 4/18/2024 Partial Inspection AMIR NAZARIAN
Footing/Foundation/Slab 4/18/2024 Partial Inspection AMIR NAZARIAN
Green Building Final 4/18/2024 Partial Inspection AMIR NAZARIAN
HVAC-Final 4/18/2024 Partial Inspection AMIR NAZARIAN
SGSOV-Seismic Gas S/O Valve 4/18/2024 SGSOV Not Ready AMIR NAZARIAN
Service/Power Release 4/18/2024 Partial Inspection AMIR NAZARIAN
Smoke Detectors 4/18/2024 Partial Inspection AMIR NAZARIAN
HVAC-Final 4/26/2024 Approved AMIR NAZARIAN
ELECTRICAL-Final 5/10/2024 Approved AMIR NAZARIAN
BUILDING-Rough-Frame 5/14/2024 Approved AMIR NAZARIAN
Final 5/14/2024 Corrections Issued AMIR NAZARIAN
Footing/Foundation/Slab 5/14/2024 Approved AMIR NAZARIAN
Green Building Final 5/14/2024 Approved AMIR NAZARIAN
SGSOV-Seismic Gas S/O Valve 5/14/2024 SGSOV Approved AMIR NAZARIAN
Service/Power Release 5/14/2024 Not Ready for Inspection AMIR NAZARIAN
Smoke Detectors 5/14/2024 Approved AMIR NAZARIAN
Service/Power Release 5/15/2024 Not Ready for Inspection AMIR NAZARIAN
Final 6/25/2024 OK to Issue CofO AMIR NAZARIAN
Service/Power Release 6/25/2024 Approved AMIR NAZARIAN