1126 N CORNWELL ST 90033

Certificate Information: 1126 N CORNWELL ST 90033

Application / Permit
20010-30000-02987
Plan Check / Job No.
B20WL03781
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(N) 4-STORY TYPE VA 31-UNIT APARTMENT BUILDING 34,386 SF OF R2-OCCUPANCY OVER 1 LEVEL SUBTERRANEAN PARKING TYPE 1A 12,671 SF OF S2-OCCUPANCY. TOC TIER 2 WITH 3 EXTREMELY LOW INCOME UNITS. PROJECT RECEIVING ONLY BASE INCENTIVES, REVIEWED MINISTERIALLY BY LADBS.
Permit Issued
Issued on 10/26/2021
Issuing Office
West Los Angeles
Current Status
CofO Corrected on 9/16/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/8/2020 APPLICANT
Assigned to Plan Check Engineer 9/9/2020 SERGIO SILVA
Corrections Issued 9/28/2020 SERGIO SILVA
Quality Review Completed 10/9/2020 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 2/4/2021 SERGIO SILVA
Applicant returned to address corrections 2/25/2021 SERGIO SILVA
Building Plans Picked Up 2/25/2021 APPLICANT
Applicant returned to address corrections 4/13/2021 SERGIO SILVA
Disabled Access Plans Picked Up 6/7/2021 APPLICANT
Applicant returned to address corrections 7/29/2021 SERGIO SILVA
Plan Check Approved 10/8/2021 SERGIO SILVA
Issued 10/26/2021 APPLICANT
CofO in Progress 5/24/2024 RAFAEL ESPINOZA
CofO Issued-Status Void 5/28/2024 ERNESTO CORRAL
Permit Finaled-Status Void 5/28/2024 ERNESTO CORRAL
Re-Activate Permit 9/16/2024 RAFAEL ESPINOZA
CofO Corrected 9/16/2024 RAFAEL ESPINOZA
Permit Finaled 9/16/2024 RAFAEL ESPINOZA

Permit Application Clearance Information

Address approval Cleared 11/19/2020 JEANIE LAM
Permit Cleared 11/19/2020 JEANIE LAM
Trees in Parkway Cleared 11/19/2020 JOHN KIM
Watercourse Cleared 11/19/2020 SAM NAVID
Eng Process Fee Ord 176,300 Cleared 11/23/2020 JEANIE LAM
Sewer availability Cleared 11/23/2020 JEANIE LAM
Hydrant and Access approval Cleared 12/18/2020 MATTHEW CRAIG
Low Impact Development Cleared 12/22/2020 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 12/28/2020 JEANIE LAM
Excavation more than 5-ft deep Cleared 2/4/2021 CALOSHA APPROVED
GPI Written Notices Cleared 2/4/2021 SERGIO SILVA
Grading Pre-Inspection Cleared 2/4/2021 SERGIO SILVA
Miscellaneous Cleared 2/25/2021 SERGIO SILVA
Density Bonus 12.22.A.31 Cleared 3/2/2021 DORIS KWOK
Building over 36-ft Cleared 4/13/2021 CALOSHA APPROVED
Miscellaneous Cleared 4/13/2021 SERGIO SILVA
Miscellaneous Cleared 4/13/2021 SERGIO SILVA
Fire Marshall Fire Life Safety Cleared 4/16/2021 VIDAL GARCIA
Work Adjacent to Public Way Cleared 4/28/2021 JOSE RODRIGUEZ
Construction near power lines Cleared 5/20/2021 RIDWAN HARDY
Green Code Cleared 5/21/2021 RICHARD GARCIA
DAS Clearance Cleared 6/3/2021 CHOI YAN
Frnt yard landscape/Water mgmt Cleared 6/14/2021 LOUIS ORTEGA
Miscellaneous Cleared 6/14/2021 LOUIS ORTEGA
Miscellaneous Cleared 6/14/2021 LOUIS ORTEGA
Opn space landscape/Water mgmt Cleared 6/14/2021 LOUIS ORTEGA
Miscellaneous Cleared 10/8/2021 SERGIO SILVA

Contact Information

Architect Taylor,, Robert James; Lic. No.: C24422 1416 STANFORD DRIVE      GLENDALE, CA 91205
Contractor Lumar Corporation; Lic. No.: 1027838-B 11420 SANTA MONICA BLVD   #252233    LOS ANGELES, CA 90025
Engineer Irvine,, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD STE 1      PASADENA, CA 91107
Engineer Koma,, Shahram Javadi; Lic. No.: C69497 23241 VENTURA BLVD 300      WOODLAND HILLS, CA 91364
Engineer Molai,, Mohamad Ali; Lic. No.: L9192 24308 BURBANK BLVD      WOODLAND HILLS, CA 91367

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/23/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 11/23/2021 Approved RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/29/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/2/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/16/2022 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 2/16/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 2/18/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 3/15/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/22/2022 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 3/23/2022 Partial Approval RAFAEL ESPINOZA
Green Building Rough 3/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/5/2022 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 4/5/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/5/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/5/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/6/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/6/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/6/2022 Partial Approval RAFAEL ESPINOZA
Green Building Rough 4/7/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/7/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/7/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/6/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/9/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/11/2022 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 5/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/23/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/25/2022 Conditional Approval TERRY HERR
Footing/Foundation/Slab 5/26/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/2/2022 Conditional Approval ERNESTO CORRAL
Reinforced Masonry Frame 6/8/2022 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 6/9/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 6/9/2022 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 6/9/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/9/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 6/17/2022 Conditional Approval WINSTON DUNNING
Reinforced Masonry Frame 6/23/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/15/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 7/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 7/19/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/20/2022 Conditional Approval WINSTON DUNNING
Special/Order Compliance 7/20/2022 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 8/15/2022 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 8/30/2022 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/30/2022 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 8/31/2022 Conditional Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 9/13/2022 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 9/16/2022 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 9/26/2022 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 9/29/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 10/25/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/7/2022 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 11/7/2022 No Access for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/17/2022 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/18/2022 Partial Approval RAFAEL ESPINOZA
Wood Frame 11/18/2022 Partial Approval RAFAEL ESPINOZA
Insulation 12/6/2022 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/16/2022 Partial Inspection RAFAEL ESPINOZA
Insulation 12/20/2022 Partial Approval RAFAEL ESPINOZA
Insulation 12/27/2022 Corrections Issued RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/29/2022 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/30/2022 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 1/4/2023 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/9/2023 Partial Approval RAFAEL ESPINOZA
Wall Anchors 1/9/2023 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 1/10/2023 Approved OSVALDO PARAMO
Insulation 1/13/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/17/2023 Partial Inspection RAFAEL ESPINOZA
Wood Frame 1/17/2023 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 1/18/2023 Partial Inspection RAFAEL ESPINOZA
Insulation 1/23/2023 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/23/2023 Partial Inspection RAFAEL ESPINOZA
Wood Frame 1/23/2023 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Wood Construction 1/25/2023 Conditional Approval RAFAEL ESPINOZA
Wood Frame 1/25/2023 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/30/2023 Partial Approval RAFAEL ESPINOZA
Wood Frame 1/30/2023 Partial Approval RAFAEL ESPINOZA
Wood Frame 1/31/2023 Partial Approval RAFAEL ESPINOZA
Insulation 2/1/2023 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 2/1/2023 Partial Approval RAFAEL ESPINOZA
Insulation 2/2/2023 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/3/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/3/2023 Partial Inspection RAFAEL ESPINOZA
Wood Frame 2/3/2023 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/10/2023 Partial Approval RAFAEL ESPINOZA
Insulation 2/10/2023 Partial Approval RAFAEL ESPINOZA
Smoke Detectors 2/10/2023 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 2/15/2023 Partial Approval RAFAEL ESPINOZA
Insulation 4/3/2023 Partial Approval RAFAEL ESPINOZA
Insulation 4/11/2023 Partial Inspection RAFAEL ESPINOZA
T-Bar Ceiling 4/11/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/11/2023 Partial Inspection RAFAEL ESPINOZA
Wood Frame 4/11/2023 Partial Approval RAFAEL ESPINOZA
Insulation 4/14/2023 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 4/14/2023 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 5/2/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 5/4/2023 Partial Approval RAFAEL ESPINOZA
T-Bar Ceiling 5/4/2023 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 5/12/2023 Partial Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 5/12/2023 Partial Approval RAFAEL ESPINOZA
Insulation 5/23/2023 Not Ready for Inspection RAFAEL ESPINOZA
Structural Steel Frame 5/23/2023 Approved RAFAEL ESPINOZA
T-Bar Ceiling 5/23/2023 Not Ready for Inspection RAFAEL ESPINOZA
Wall Anchors 5/23/2023 Approved RAFAEL ESPINOZA
Insulation 5/24/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/6/2023 Partial Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 6/6/2023 Partial Approval RAFAEL ESPINOZA
Smoke Detectors 6/6/2023 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 6/12/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/20/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/27/2023 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/14/2023 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/31/2023 Partial Inspection LARRY ARNICK
Pre-Inspection 9/19/2023 Partial Inspection RAFAEL ESPINOZA
Verify Rec and Parks Fee Memo 9/19/2023 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 1/17/2024 Partial Approval LARRY ARNICK
Drywall Nailing 5/2/2024 Approved RAFAEL ESPINOZA
Final 5/2/2024 Corrections Issued RAFAEL ESPINOZA
Footing/Foundation/Slab 5/2/2024 Approved RAFAEL ESPINOZA
Green Building Final 5/2/2024 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 5/2/2024 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 5/2/2024 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 5/2/2024 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/2/2024 Approved RAFAEL ESPINOZA
Wood Frame 5/2/2024 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 5/6/2024 Corrections Issued RAFAEL ESPINOZA
Reinforced Masonry Frame 5/8/2024 Approved RAFAEL ESPINOZA
Final 5/22/2024 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/22/2024 Approved RAFAEL ESPINOZA
Smoke Detectors 5/22/2024 Approved RAFAEL ESPINOZA
Wood Frame 5/22/2024 Approved RAFAEL ESPINOZA
Final 5/24/2024 OK to Issue CofO RAFAEL ESPINOZA