1612 S CATALINA ST 90006
Certificate Information: 1612 S CATALINA ST 90006
- Application / Permit
- 20010-30000-00485
- Plan Check / Job No.
- B20WL00762
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Commercial
- Primary Use
- (22) Storage Building for Household Goods
- Work Description
- 7-story with basement self storage building.
- Permit Issued
- Issued on 10/20/2020
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 9/20/2022
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 2/13/2020 | APPLICANT |
| Assigned to Plan Check Engineer | 3/5/2020 | JOE VO |
| Corrections Issued | 3/23/2020 | JOE VO |
| Quality Review Completed | 3/25/2020 | KEN GILL |
| Building Plans Picked Up | 3/27/2020 | APPLICANT |
| Green Plans Picked Up | 5/4/2020 | APPLICANT |
| Applicant returned to address corrections | 5/18/2020 | JOE VO |
| Applicant returned to address corrections | 7/23/2020 | JOE VO |
| Disabled Access Plans Picked Up | 7/28/2020 | APPLICANT |
| Applicant returned to address corrections | 8/4/2020 | JOE VO |
| Plan Check Approved | 10/13/2020 | JOE VO |
| Issued | 10/20/2020 | APPLICANT |
| Permit Finaled | 9/20/2022 | NICK DANERI |
Permit Application Clearance Information
| Green Code | Cleared | 4/29/2020 | DONALD CRICHLOW |
| Eng Process Fee Ord 176,300 | Cleared | 5/14/2020 | CELINA MORENO |
| Community Plan Implem. Overlay | Cleared | 7/7/2020 | SAM NAVID |
| Community Plan Implem. Overlay | Cleared | 7/8/2020 | KEVIN ARUCAN |
| Driveway location | Cleared | 7/8/2020 | KEVIN ARUCAN |
| Address approval | Cleared | 7/14/2020 | CELINA MORENO |
| Highway dedication | Cleared | 7/14/2020 | CELINA MORENO |
| Permit | Cleared | 7/14/2020 | CELINA MORENO |
| Building over 3-story or 36-ft | Cleared | 7/23/2020 | CALOSHA APPROVED |
| Excavation more than 5-ft deep | Cleared | 7/23/2020 | CALOSHA APPROVED |
| DAS Clearance | Cleared | 7/28/2020 | SOMKIAT SUPANYACHOTSKUL |
| Sewer availability | Cleared | 7/28/2020 | CELINA MORENO |
| Miscellaneous | Cleared | 8/3/2020 | JOE VO |
| Low Impact Development | Cleared | 8/14/2020 | ORVAL HERNANDEZ-MARCI |
| Roof/Waste drainage to street | Cleared | 8/20/2020 | ELENA LOPEZ |
| Hydrant and Access approval | Cleared | 9/4/2020 | KURT CORRAL |
| Miscellaneous | Cleared | 9/24/2020 | JOE VO |
| "Q" conditions | Cleared | 9/29/2020 | DENZEL HENDERSON |
| "T" removal | Cleared | 9/29/2020 | DENZEL HENDERSON |
| CPC | Cleared | 9/29/2020 | DENZEL HENDERSON |
| Comm Cor/Mini-Mall | Cleared | 9/29/2020 | DENZEL HENDERSON |
| Comm Cor/Mini-Mall | Cleared | 9/29/2020 | DENZEL HENDERSON |
| Comm Cor/Mini-Mall | Cleared | 9/29/2020 | DENZEL HENDERSON |
| Community Plan Implem. Overlay | Cleared | 9/29/2020 | DENZEL HENDERSON |
| Miscellaneous | Cleared | 9/29/2020 | DENZEL HENDERSON |
| Site Plan review | Cleared | 9/29/2020 | DENZEL HENDERSON |
Contact Information
| Architect | Vandeloecht,, Louis W; Lic. No.: C33590 | 229 GREENBRIAR ESTATES ST. LOUIS, MO 63122 |
| Contractor | Arco / Murray National Construction Company Inc; Lic. No.: 934740-B | 3110 WOODCREEK DRIVE DOWNERS GROVE, IL 60515 |
| Engineer | Conaway,, Johnny Ray; Lic. No.: C19689 | 2890 APACHE AVE VENTURA, CA 93001 |
| Engineer | Guglielmo,, Emily Margaret; Lic. No.: S5902 | 26 AYALA COURT SAN RAFAEL, CA 94903 |
| Engineer | Zadoorian,, Christopher John; Lic. No.: GE2493 | 1431 MONTGOMEERY ST TUSTIN, CA 92782 |
Inspector Information
| NICK DANERI, (213) 202-5615 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Reinf. Concrete | 10/28/2020 | Conditional Approval | NICK DANERI |
| Footing/Foundation/Slab | 10/28/2020 | Partial Approval | NICK DANERI |
| METHANE-Barrier | 10/28/2020 | Partial Inspection | NICK DANERI |
| METHANE-Subgrade | 10/28/2020 | Partial Inspection | NICK DANERI |
| Deputy Reinf. Concrete | 10/29/2020 | Conditional Approval | NICK DANERI |
| Footing/Foundation/Slab | 11/4/2020 | Partial Approval | NICK DANERI |
| METHANE-Barrier | 11/4/2020 | Not Ready for Inspection | NICK DANERI |
| METHANE-Subgrade | 11/4/2020 | Not Ready for Inspection | NICK DANERI |
| Deputy Reinf. Concrete | 11/6/2020 | Conditional Approval | NICK DANERI |
| Footing/Foundation/Slab | 11/6/2020 | Partial Approval | NICK DANERI |
| METHANE-Barrier | 11/6/2020 | Not Ready for Inspection | NICK DANERI |
| METHANE-Subgrade | 11/6/2020 | Not Ready for Inspection | NICK DANERI |
| Deputy Reinf. Concrete | 11/13/2020 | Conditional Approval | NICK DANERI |
| Footing/Foundation/Slab | 11/13/2020 | Partial Approval | NICK DANERI |
| METHANE-Barrier | 11/13/2020 | Not Ready for Inspection | NICK DANERI |
| METHANE-Subgrade | 11/13/2020 | Not Ready for Inspection | NICK DANERI |
| Deputy Reinf. Concrete | 11/19/2020 | Conditional Approval | NICK DANERI |
| Footing/Foundation/Slab | 11/19/2020 | Partial Approval | NICK DANERI |
| METHANE-Barrier | 11/19/2020 | Not Ready for Inspection | NICK DANERI |
| METHANE-Subgrade | 11/19/2020 | Not Ready for Inspection | NICK DANERI |
| Deputy Reinf. Concrete | 11/20/2020 | Conditional Approval | RUSSELL BONVOULOIR |
| METHANE-Barrier | 12/3/2020 | Conditional Approval | NICK DANERI |
| Footing/Foundation/Slab | 12/17/2020 | Partial Approval | NICK DANERI |
| METHANE-Barrier | 12/17/2020 | Partial Approval | NICK DANERI |
| METHANE-Subgrade | 12/17/2020 | Not Ready for Inspection | NICK DANERI |
| Deputy Reinf. Concrete | 12/18/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 1/19/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 1/20/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 1/21/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 1/22/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 1/27/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 1/28/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 1/29/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/1/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/2/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/3/2021 | Conditional Approval | NICK DANERI |
| Special/Order Compliance | 2/3/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/4/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/5/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/10/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/11/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/12/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 2/16/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/16/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 2/17/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/17/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/18/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/19/2021 | Conditional Approval | NICK DANERI |
| Special/Order Compliance | 2/23/2021 | Corrections Issued | NICK DANERI |
| Deputy Steel/Welding | 2/25/2021 | Conditional Approval | NICK DANERI |
| Special/Order Compliance | 2/25/2021 | Partial Inspection | NICK DANERI |
| Deputy Drilled-In Anchors | 2/26/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 2/26/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/1/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 3/2/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/3/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/4/2021 | Conditional Approval | NICK DANERI |
| Special/Order Compliance | 3/4/2021 | Partial Inspection | NICK DANERI |
| Deputy Steel/Welding | 3/5/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/9/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/10/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/11/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/12/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/16/2021 | Conditional Approval | LANNY MERRICK |
| Deputy Steel/Welding | 3/17/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/18/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 3/19/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/19/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/22/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/23/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/24/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/25/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/26/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 3/31/2021 | Conditional Approval | NICK DANERI |
| Special/Order Compliance | 3/31/2021 | Partial Inspection | NICK DANERI |
| Deputy Steel/Welding | 4/1/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 4/5/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 4/6/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 4/7/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 4/8/2021 | Conditional Approval | NICK DANERI |
| Excavation/Setback/Form/Re-Bar | 4/8/2021 | Partial Approval | NICK DANERI |
| Floor/Roof Diaphrgm/Shear Wall | 4/8/2021 | Partial Approval | NICK DANERI |
| Deputy Steel/Welding | 4/9/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 4/12/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 4/12/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 4/13/2021 | Conditional Approval | NICK DANERI |
| Deputy Steel/Welding | 4/14/2021 | Conditional Approval | NICK DANERI |
| Excavation/Setback/Form/Re-Bar | 4/14/2021 | Partial Approval | NICK DANERI |
| Floor/Roof Diaphrgm/Shear Wall | 4/14/2021 | Partial Approval | NICK DANERI |
| Deputy Steel/Welding | 4/15/2021 | Conditional Approval | DANIEL COLLINS |
| Deputy Reinf. Concrete | 4/16/2021 | Conditional Approval | DANIEL COLLINS |
| Deputy Steel/Welding | 4/16/2021 | Conditional Approval | DANIEL COLLINS |
| Excavation/Setback/Form/Re-Bar | 4/16/2021 | Partial Approval | DANIEL COLLINS |
| Floor/Roof Diaphrgm/Shear Wall | 4/16/2021 | Partial Approval | DANIEL COLLINS |
| Deputy Reinf. Concrete | 4/19/2021 | Conditional Approval | NICK DANERI |
| Deputy Methane Barrier | 4/28/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 4/29/2021 | Conditional Approval | NICK DANERI |
| Footing/Foundation/Slab | 4/29/2021 | Partial Approval | NICK DANERI |
| METHANE-Barrier | 4/29/2021 | Approved | NICK DANERI |
| METHANE-Rough | 4/29/2021 | Approved | NICK DANERI |
| METHANE-Subgrade | 4/29/2021 | Approved | NICK DANERI |
| Piling/Pier/Caisson | 4/29/2021 | Partial Approval | NICK DANERI |
| Deputy Reinf. Concrete | 4/30/2021 | Conditional Approval | NICK DANERI |
| Deputy Methane Barrier | 5/10/2021 | Conditional Approval | NICK DANERI |
| Deputy Methane Barrier | 5/17/2021 | Conditional Approval | NICK DANERI |
| Deputy Methane Barrier | 5/18/2021 | Conditional Approval | NICK DANERI |
| Deputy Methane Barrier | 5/19/2021 | Conditional Approval | NICK DANERI |
| Light Gage Steel Frame | 5/19/2021 | Partial Approval | NICK DANERI |
| Deputy Drilled-In Anchors | 5/20/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 5/24/2021 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 5/26/2021 | Conditional Approval | NICK DANERI |
| Excavation/Setback/Form/Re-Bar | 6/3/2021 | Partial Approval | NICK DANERI |
| Footing/Foundation/Slab | 6/3/2021 | Partial Approval | NICK DANERI |
| Special/Order Compliance | 6/3/2021 | Partial Inspection | NICK DANERI |
| Deputy Reinf. Concrete | 6/7/2021 | Conditional Approval | NICK DANERI |
| Drywall Nailing | 6/7/2021 | Conditional Approval | NICK DANERI |
| Green Building Rough | 6/7/2021 | Conditional Approval | NICK DANERI |
| Light Gage Steel Frame | 6/7/2021 | Partial Approval | NICK DANERI |
| Drywall Nailing | 6/8/2021 | Partial Approval | NICK DANERI |
| Green Building Rough | 6/8/2021 | Partial Approval | NICK DANERI |
| Deputy Steel/Welding | 6/22/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 6/23/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 6/24/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 6/25/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 6/29/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 7/6/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 7/7/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 7/8/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 7/9/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Drywall Nailing | 7/16/2021 | Partial Approval | RAFAEL ESPINOZA |
| Green Building Rough | 7/16/2021 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 7/22/2021 | Not Ready for Inspection | JONATHAN QUACH |
| Deputy Reinf. Concrete | 7/23/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 7/23/2021 | Conditional Approval | JONATHAN QUACH |
| Special/Order Compliance | 7/23/2021 | Not Ready for Inspection | JONATHAN QUACH |
| Deputy Reinf. Concrete | 7/26/2021 | Conditional Approval | DAVID BURKHEAD |
| Footing/Foundation/Slab | 7/26/2021 | Partial Approval | DANIEL MC AULIFFE |
| Deputy Reinf. Concrete | 7/27/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Fireproofing | 7/28/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Fireproofing | 7/29/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 7/29/2021 | Conditional Approval | JONATHAN QUACH |
| Excavation/Setback/Form/Re-Bar | 7/29/2021 | Partial Approval | JONATHAN QUACH |
| Special/Order Compliance | 7/29/2021 | Not Ready for Inspection | JONATHAN QUACH |
| Deputy Fireproofing | 7/30/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 8/2/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 8/3/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 8/3/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Footing/Foundation/Slab | 8/3/2021 | Partial Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 8/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Excavation/Setback/Form/Re-Bar | 8/4/2021 | Partial Approval | RAFAEL ESPINOZA |
| Special/Order Compliance | 8/4/2021 | Corrections Issued | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 8/5/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 8/6/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 8/6/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 8/17/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 8/18/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 8/19/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 8/20/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 8/26/2021 | Partial Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 9/2/2021 | Partial Approval | RAFAEL ESPINOZA |
| Drywall Nailing | 9/14/2021 | Partial Approval | RAFAEL ESPINOZA |
| Green Building Rough | 9/14/2021 | Approved | RAFAEL ESPINOZA |
| Special/Order Compliance | 9/14/2021 | Approved | RAFAEL ESPINOZA |
| Deputy Fireproofing | 9/16/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Drilled-In Anchors | 9/21/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Fireproofing | 9/21/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Fireproofing | 9/30/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Fireproofing | 10/4/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Fireproofing | 10/7/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Special/Order Compliance | 10/7/2021 | Corrections Issued | RAFAEL ESPINOZA |
| Insulation | 10/14/2021 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 10/14/2021 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 10/20/2021 | Partial Inspection | RAFAEL ESPINOZA |
| Insulation | 10/25/2021 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 10/25/2021 | Partial Inspection | RAFAEL ESPINOZA |
| Deputy Fireproofing | 11/1/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Fireproofing | 11/10/2021 | Conditional Approval | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 11/30/2021 | Partial Approval | NICK DANERI |
| Special/Order Compliance | 11/30/2021 | Partial Approval | NICK DANERI |
| Special/Order Compliance | 1/11/2022 | Corrections Issued | RAFAEL ESPINOZA |
| Special/Order Compliance | 1/28/2022 | Approved | RAFAEL ESPINOZA |
| Special/Order Compliance | 2/7/2022 | No Access for Inspection | NICK DANERI |
| Interior/Exterior Lathing | 2/22/2022 | Approved | TED RIES |
| Special/Order Compliance | 2/22/2022 | Approved | TED RIES |
| Light Gage Steel Frame | 3/17/2022 | Partial Approval | NICK DANERI |
| Special/Order Compliance | 3/17/2022 | Partial Approval | NICK DANERI |
| Special/Order Compliance | 3/30/2022 | Partial Inspection | NICK DANERI |
| Deputy Drilled-In Anchors | 4/1/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Special/Order Compliance | 7/11/2022 | Partial Inspection | NICK DANERI |
| Pre-Inspection | 7/13/2022 | Partial Inspection | NICK DANERI |
| Special/Order Compliance | 7/13/2022 | Partial Inspection | NICK DANERI |
| Drywall Nailing | 7/15/2022 | Approved | NICK DANERI |
| Final | 7/15/2022 | Not Ready for Inspection | NICK DANERI |
| Footing/Foundation/Slab | 7/15/2022 | Approved | NICK DANERI |
| Green Building Final | 7/15/2022 | Not Ready for Inspection | NICK DANERI |
| Reinforced Concrete Frame | 7/15/2022 | Not Ready for Inspection | NICK DANERI |
| SGSOV-Seismic Gas S/O Valve | 7/15/2022 | SGSOV Not Ready | NICK DANERI |
| Smoke Detectors | 7/15/2022 | Approved | NICK DANERI |
| Special/Order Compliance | 7/15/2022 | Partial Inspection | NICK DANERI |
| Structural Steel Frame | 7/15/2022 | Not Ready for Inspection | NICK DANERI |
| Verify Sprinkler Sign Off | 7/15/2022 | Not Ready for Inspection | NICK DANERI |