10824 W BLIX ST 1-23 91602

Certificate Information: 10824 W BLIX ST 1-23 91602

Application / Permit
20010-20000-04478
Plan Check / Job No.
B20VN15194
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 140'10" X 61' FOUR STORY 23 UNIT APARTMENT AND 4 RECREATION ROOMS AND 1 FITNESS ROOM FULLY SPRINKLERED NFPA-13 (TYPE VA CONSTRUCTION ) WITH ATTACHED BASEMENT GARAGE (TYPE IA ) ( INCLUDING 3 VERY LOW INCOME UNITS PER LAMC 12.22A25, ALL WORK PER ENGINEERING
Permit Issued
Issued on 7/8/2022
Issuing Office
Current Status
CofO Issued on 8/20/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/24/2020 APPLICANT
Disabled Access Plans Picked Up 12/8/2020 APPLICANT
Green Plans Picked Up 12/11/2020 APPLICANT
Assigned to Plan Check Engineer 12/23/2020 RARES BODEA
Corrections Issued 1/8/2021 RARES BODEA
Quality Review Completed 1/13/2021 STEVEN KIM
Building Plans Picked Up 1/13/2021 APPLICANT
Applicant returned to address corrections 5/23/2022 RARES BODEA
Applicant returned to address corrections 6/24/2022 RARES BODEA
Plan Check Approved 7/5/2022 RARES BODEA
Issued 7/8/2022 APPLICANT
CofO in Progress 8/8/2025 JOHN KITCKO
CofO Issued 8/20/2025 RICKEY JACKSON
Permit Finaled 8/20/2025 RICKEY JACKSON

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/4/2021 MARKOS PEREZ-BRAN
Sewer availability Cleared 3/31/2021 ROSE MARIE SMITH
Address approval Cleared 4/1/2021 MARKOS PEREZ-BRAN
Miscellaneous Cleared 4/27/2021 LAUREN PADICK
Miscellaneous Cleared 4/27/2021 LAUREN PADICK
Green Code Cleared 5/4/2021 MICHAEL AYERS
Trees in Parkway Cleared 5/11/2021 JOHN KIM
Hydrant and Access approval Cleared 5/20/2021 MATTHEW CRAIG
Frnt yard landscape/Water mgmt Cleared 6/18/2021 LAUREN PADICK
Opn space landscape/Water mgmt Cleared 6/18/2021 LAUREN PADICK
Building over 3-story or 36-ft Cleared 7/25/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/25/2021 CALOSHA APPROVED
Miscellaneous Cleared 9/10/2021 DANG NGUYEN
Low Impact Development Cleared 11/3/2021 IDA MEISAMI-FARD
Highway dedication Cleared 11/5/2021 LEE GUILBEAUX
Permit Cleared 11/5/2021 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 11/5/2021 LEE GUILBEAUX
Work Adjacent to Public Way Cleared 11/5/2021 LEE GUILBEAUX
Density Bonus 12.22.A.25 Cleared 12/7/2021 MICHAEL ZIRBES
DAS Clearance Cleared 12/16/2021 RARES BODEA
Fire Marshall Fire Life Safety Cleared 5/5/2022 RONILO MULAWIN

Contact Information

Architect Stockton,, Kenneth; Lic. No.: C19870 16461 SHERMAN WAY #100      VAN NUYS, CA 91406
Contractor Schaffel Development Company Inc; Lic. No.: 411849-B 15235 BURBANK BLVD #C      VAN NUYS, CA 91411
Engineer Dejban,, Masoud; Lic. No.: S2521 17200 VENTURA BLVD STE 213A      ENCINO, CA 91316
Engineer Martirosian,, Hayk Sam; Lic. No.: C52563 537 NOLAN AVE      GLENDALE, CA 91202

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/29/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 9/27/2022 Conditional Approval JOHN KITCKO
Footing/Foundation/Slab 9/28/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 9/29/2022 Approved JOHN KITCKO
Deputy Shotcrete 10/4/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 10/5/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 10/5/2022 Partial Approval JOHN KITCKO
Deputy Pre-Stress Concrete 10/7/2022 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 10/11/2022 Conditional Approval JOHN KITCKO
Deputy Drilled-In Anchors 10/12/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 10/12/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 10/18/2022 Conditional Approval JOHN KITCKO
Footing/Foundation/Slab 10/18/2022 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 11/15/2022 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 11/17/2022 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 11/18/2022 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 12/22/2022 Partial Inspection JOHN KITCKO
Pre-Inspection 1/11/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 1/12/2023 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 1/12/2023 Corrections Issued JOHN KITCKO
Deputy Other (see comments) 1/13/2023 Approved JOHN KITCKO
Deputy Wood Construction 2/2/2023 Approved ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 2/2/2023 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 2/2/2023 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 2/2/2023 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 2/9/2023 Partial Approval ROBERT DAVIS
Deputy Wood Construction 2/16/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/16/2023 Partial Approval ROBERT DAVIS
Deputy Wood Construction 3/3/2023 Conditional Approval ANDREW DORSO
Floor/Roof Diaphrgm/Shear Wall 3/3/2023 Partial Inspection ANDREW DORSO
Pre-Inspection 3/8/2023 Partial Inspection JOHN KITCKO
Pre-Inspection 3/24/2023 Conditional Approval JOHN KITCKO
Deputy Other (see comments) 3/28/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 3/28/2023 Conditional Approval JOHN KITCKO
Pre-Inspection 3/28/2023 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 3/30/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 4/4/2023 Conditional Approval JOHN KITCKO
Green Building Rough 4/6/2023 Partial Inspection CAMERON CHABAN
Wood Frame 4/6/2023 Partial Approval CAMERON CHABAN
Deputy Wood Construction 4/11/2023 Approved JOHN KITCKO
Green Building Rough 4/13/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 4/13/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/13/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 4/18/2023 Approved JOHN KITCKO
Green Building Rough 4/18/2023 Partial Approval BRIAN KELLY
Verify Sprinkler Sign Off 4/18/2023 Partial Approval BRIAN KELLY
Wood Frame 4/18/2023 Partial Approval BRIAN KELLY
Insulation 4/20/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 4/27/2023 Approved JOHN KITCKO
Green Building Rough 4/27/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 4/27/2023 Partial Approval STEVEN LEVITT
Verify Sprinkler Sign Off 4/27/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/27/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 5/5/2023 Conditional Approval JOHN KITCKO
Pre-Inspection 5/17/2023 Partial Inspection JOHN KITCKO
Insulation 5/24/2023 Corrections Issued JOHN KITCKO
Deputy Wood Construction 5/30/2023 Approved JOHN KITCKO
Green Building Rough 5/30/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 5/30/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/30/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 6/15/2023 Approved JOHN KITCKO
Green Building Rough 6/22/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 6/22/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 6/22/2023 Partial Approval JOHN KITCKO
Pre-Inspection 6/26/2023 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 7/10/2023 Corrections Issued JOHN KITCKO
Interior/Exterior Lathing 7/12/2023 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 7/13/2023 Partial Approval JOHN KITCKO
Green Building Rough 7/13/2023 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 7/18/2023 Partial Inspection JEFFREY FULTON
Pre-Inspection 7/27/2023 Partial Inspection JOHN KITCKO
Pre-Inspection 8/2/2023 Partial Inspection ROBERT DAVIS
Pre-Inspection 8/7/2023 Not Ready for Inspection JOHN KITCKO
Insulation 9/11/2023 No Access for Inspection JOHN KITCKO
Deputy Drilled-In Anchors 9/12/2023 Approved JOHN KITCKO
Insulation 9/12/2023 Partial Approval JOHN KITCKO
Drywall Nailing 9/29/2023 Partial Approval JOHN KITCKO
Green Building Rough 9/29/2023 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 10/3/2023 Partial Approval JOHN KITCKO
Green Building Rough 10/3/2023 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 10/10/2023 Partial Inspection JOHN KITCKO
Deputy Drilled-In Anchors 10/24/2023 Approved JOHN KITCKO
Drywall Nailing 10/25/2023 Corrections Issued JOHN KITCKO
Green Building Rough 10/25/2023 Not Ready for Inspection JOHN KITCKO
Green Building Rough 10/26/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 10/26/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 10/26/2023 Corrections Issued JOHN KITCKO
Pre-Inspection 11/3/2023 Partial Inspection JOHN KITCKO
Deputy Drilled-In Anchors 11/13/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 11/13/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 11/14/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 11/15/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 11/16/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 11/17/2023 Conditional Approval ROBERT DAVIS
Pre-Inspection 11/20/2023 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 12/5/2023 Not Ready for Inspection JOHN KITCKO
Green Building Rough 12/5/2023 No Access for Inspection JOHN KITCKO
Pre-Inspection 12/12/2023 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 12/13/2023 Partial Approval JOHN KITCKO
Pre-Inspection 12/18/2023 Partial Approval JOHN KITCKO
Pre-Inspection 12/20/2023 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 12/21/2023 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 12/22/2023 Corrections Issued JOHN KITCKO
Green Building Rough 12/26/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 12/26/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/26/2023 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 12/27/2023 Partial Approval JOHN KITCKO
Deputy Grading 3/26/2024 Conditional Approval JOHN KITCKO
Pre-Inspection 5/22/2024 Partial Inspection JOHN KITCKO
Light Gage Steel Frame 5/30/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 6/28/2024 Not Ready for Inspection GREGORY POMISH
Green Building Rough 6/28/2024 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 7/17/2024 Conditional Approval JOHN KITCKO
Pre-Inspection 11/13/2024 Partial Inspection JOHN KITCKO
Green Building Rough 4/2/2025 Partial Inspection JOHN KITCKO
Reinforced Masonry Frame 4/2/2025 Partial Inspection JOHN KITCKO
Verify Sprinkler Sign Off 4/2/2025 Approved JOHN KITCKO
Final 4/9/2025 Partial Inspection JOHN KITCKO
Green Building Rough 4/9/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 6/30/2025 Approved JOHN KITCKO
Final 6/30/2025 Conditional Approval JOHN KITCKO
Footing/Foundation/Slab 6/30/2025 Approved JOHN KITCKO
Green Building Final 6/30/2025 Approved JOHN KITCKO
Green Building Rough 6/30/2025 Approved JOHN KITCKO
Reinforced Concrete Frame 6/30/2025 Approved JOHN KITCKO
Reinforced Masonry Frame 6/30/2025 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 6/30/2025 SGSOV Approved JOHN KITCKO
Smoke Detectors 6/30/2025 Approved JOHN KITCKO
Structural Steel Frame 6/30/2025 Approved JOHN KITCKO
Wood Frame 6/30/2025 Approved JOHN KITCKO
Final 7/11/2025 Conditional Approval JOHN KITCKO
Final 8/8/2025 OK to Issue CofO JOHN KITCKO