Footing/Foundation/Slab
|
5/22/2023
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
5/26/2023
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/1/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Reinforced Concrete Frame
|
6/1/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Verify Sprinkler Sign Off
|
6/1/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Masonry Wall/Backfill
|
6/2/2023
|
Not Ready for Inspection
|
ANDREW DORSO
|
|
Green Building Rough
|
6/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
6/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
6/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
6/9/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
6/12/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
6/12/2023
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
6/13/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
6/13/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
6/13/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
6/13/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
6/13/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
6/13/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Shotcrete
|
6/20/2023
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
6/20/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
6/29/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
7/5/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
7/7/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
7/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
7/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
7/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
7/24/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
8/3/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
10/5/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
10/11/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
10/12/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
10/20/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Piling/Pier/Caisson
|
10/20/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
11/27/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/28/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
12/1/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
12/4/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/5/2023
|
Approved
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
12/5/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Steel/Welding
|
12/12/2023
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Steel/Welding
|
12/14/2023
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
12/15/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
12/15/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
12/15/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Piling/Pier/Caisson
|
12/15/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Steel/Welding
|
1/2/2024
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/3/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
1/3/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/3/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Wood Construction
|
1/16/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
1/16/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/16/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Wood Construction
|
1/18/2024
|
Approved
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/18/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
1/18/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/18/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/26/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
1/26/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
1/26/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/26/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/6/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/8/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/12/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Wood Construction
|
3/5/2024
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/6/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
3/6/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
3/6/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
3/7/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
3/13/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
3/13/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
3/13/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
3/18/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
3/18/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
3/19/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
3/19/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
3/20/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
3/21/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
3/21/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
3/26/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
3/26/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
4/8/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/8/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
4/8/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
4/15/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/16/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
4/18/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/18/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
4/18/2024
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
4/22/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/23/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
4/25/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/25/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
4/25/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
4/25/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/29/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
4/30/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
4/30/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
4/30/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
4/30/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wall Anchors
|
5/3/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/3/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/6/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
5/6/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/6/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
5/6/2024
|
Corrections Issued
|
JOHN KITCKO
|
|
Green Building Rough
|
5/9/2024
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/9/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/9/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/9/2024
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/13/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/13/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
5/14/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/14/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/17/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/17/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/17/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/17/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/21/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/21/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
5/21/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/21/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/22/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
5/22/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/22/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/23/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
5/24/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/24/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/24/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/29/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
5/29/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
5/29/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/3/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
6/3/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/20/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
6/20/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
6/20/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/8/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
7/8/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/11/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
7/11/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/15/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
7/15/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/19/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
7/19/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
8/14/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
8/20/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
9/10/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
9/10/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
9/10/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/23/2024
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
12/4/2024
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Pre-Inspection
|
12/18/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
1/27/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Final
|
1/27/2025
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
1/27/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Final
|
1/27/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
1/27/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
1/27/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
1/27/2025
|
SGSOV Not Ready
|
DANNY RODRIGUEZ
|
|
Smoke Detectors
|
1/27/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/27/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
1/27/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
5/16/2025
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Final
|
5/16/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
5/16/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Final
|
5/16/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/16/2025
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
5/16/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
5/16/2025
|
SGSOV Not Ready
|
DANNY RODRIGUEZ
|
|
Smoke Detectors
|
5/16/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/16/2025
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/16/2025
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
6/13/2025
|
SGSOV Not Ready
|
DANIEL VARNUM
|
|
Drywall Nailing
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Final
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Final
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
SGSOV-Seismic Gas S/O Valve
|
7/7/2025
|
SGSOV Not Ready
|
GREGORY POMISH
|
|
Smoke Detectors
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/10/2025
|
Approved
|
GREGORY POMISH
|
|
Final
|
7/10/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/10/2025
|
Approved
|
GREGORY POMISH
|
|
Green Building Final
|
7/10/2025
|
Approved
|
GREGORY POMISH
|
|
Green Building Rough
|
7/10/2025
|
Approved
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
7/10/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
SGSOV-Seismic Gas S/O Valve
|
7/10/2025
|
SGSOV Approved
|
GREGORY POMISH
|
|
Smoke Detectors
|
7/10/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
7/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Final
|
7/29/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
7/29/2025
|
Approved
|
GREGORY POMISH
|
|
Smoke Detectors
|
7/29/2025
|
Approved
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
7/29/2025
|
Approved
|
GREGORY POMISH
|
|
Wood Frame
|
7/29/2025
|
Approved
|
GREGORY POMISH
|
|
Final
|
7/30/2025
|
OK for TCO
|
GREGORY POMISH
|