721 N BONHILL ROAD 90049

Certificate Information: 721 N BONHILL ROAD 90049

Application / Permit
20010-20000-03611
Plan Check / Job No.
B20VN13114
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW (94'-3 1/2"x 93'-6 1/2") TWO STORY SINGLE FAMILY DWELLING WITH BASEMENT, AUTOMATIC FIRE SPRINKLER NFPA-13D ALL THROUGHOUT. WORK PER ENGINEER.
Permit Issued
Issued on 10/4/2021
Issuing Office
Current Status
Issued on 10/4/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/6/2020 APPLICANT
Assigned to Plan Check Engineer 10/8/2020 TROY DEGUZMAN
Corrections Issued 10/15/2020 TROY DEGUZMAN
Quality Review Completed 10/27/2020 CHON CHIO KUO
Building Plans Picked Up 10/27/2020 APPLICANT
Applicant returned to address corrections 12/22/2020 TROY DEGUZMAN
Applicant returned to address corrections 12/24/2020 TROY DEGUZMAN
Applicant returned to address corrections 4/6/2021 TROY DEGUZMAN
Applicant returned to address corrections 8/11/2021 TROY DEGUZMAN
Plan Check Approved 8/23/2021 TROY DEGUZMAN
Issued 10/4/2021 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 12/11/2020 DINAH GARIN
BHO/Hillside ordinance Cleared 12/11/2020 DINAH GARIN
BHO/Hillside ordinance Cleared 12/11/2020 DINAH GARIN
BHO/Hillside ordinance Cleared 12/11/2020 DINAH GARIN
BHO/Hillside ordinance Cleared 12/11/2020 DINAH GARIN
Sewer availability Cleared 12/11/2020 DINAH GARIN
Hydrant and Access approval Cleared 2/11/2021 JOHN CONNEALLY
GPI Written Notices Cleared 2/23/2021 TROY DEGUZMAN
Grading Pre-Inspection Cleared 2/23/2021 TROY DEGUZMAN
Trees in Parkway Cleared 3/3/2021 JOHN KIM
Permit Cleared 5/12/2021 DINAH GARIN
Eng Process Fee Ord 176,300 Cleared 6/15/2021 DINAH GARIN
Low Impact Development Cleared 7/21/2021 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 7/30/2021 ANTHONY MAINEZ

Contact Information

Architect Vertoch,, Philip Girard; Lic. No.: C21731 1423-C CLOVERFIELD BLVD      SANTA MONICA, CA 90404
Contractor Williams Craig R Construction Inc; Lic. No.: 479539-B 9100 WILSHIRE BLVD   STE 503E    BEVERLY HILLS, CA 90212
Engineer Barajas,, George Luis; Lic. No.: L8399 3635 SHADOW GROVE RD      PASADENA, CA 91107
Engineer Irvine,, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD STE 1      PASADENA, CA 91107
Engineer Lau,, David Harkwong; Lic. No.: C34961 12467 W WASHINGTON BLVD      LOS ANGELES, CA 90066

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/5/2022 Partial Approval JOHN KIDWELL
Deputy Reinf. Concrete 5/9/2022 Partial Approval JOHN KIDWELL
Footing/Foundation/Slab 5/10/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 5/31/2022 Partial Approval JOHN KIDWELL
Footing/Foundation/Slab 6/1/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 6/2/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 6/27/2022 Approved MICHAEL PELHAM
Footing/Foundation/Slab 6/27/2022 Corrections Issued JOHN KIDWELL
Deputy Shotcrete 7/1/2022 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 8/5/2022 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 8/8/2022 No Access for Inspection KENNETH NAGLE
Deputy Steel/Welding 8/9/2022 Conditional Approval ANDREW NAVE
Excavation/Setback/Form/Re-Bar 9/8/2022 Partial Approval JUAN VALENZUELA
Footing/Foundation/Slab 9/8/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 9/9/2022 Conditional Approval MICHAEL PELHAM
Deputy Reinf. Concrete 9/13/2022 Conditional Approval MICHAEL PELHAM
Deputy Shotcrete 9/29/2022 Conditional Approval ANDREW NAVE
Footing/Foundation/Slab 9/29/2022 Partial Approval JUAN VALENZUELA
Deputy Wood Construction 10/7/2022 Approved JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 10/7/2022 Partial Approval JUAN VALENZUELA
Deputy Steel/Welding 11/4/2022 Conditional Approval ANDREW NAVE
Deputy Wood Construction 12/21/2022 Approved JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 12/21/2022 Partial Approval JUAN VALENZUELA
Deputy Wood Construction 2/6/2023 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 4/3/2023 Partial Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 4/18/2023 Partial Approval KEVIN SARGSYAN
Deputy Wood Construction 5/19/2023 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 5/19/2023 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 5/24/2023 Partial Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 5/25/2023 No Access for Inspection KENNETH NAGLE
Deputy Reinf. Concrete 6/6/2023 No Access for Inspection KENNETH NAGLE
Footing/Foundation/Slab 6/7/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 7/18/2023 Corrections Issued KEVIN SARGSYAN
Deputy Reinf. Concrete 8/4/2023 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 8/4/2023 Partial Approval KEVIN SARGSYAN
Deputy Steel/Welding 9/6/2023 Conditional Approval ARAM AVEDISIAN
Deputy Other (see comments) 9/12/2023 Approved ARAM AVEDISIAN
Footing/Foundation/Slab 9/12/2023 Partial Approval ARAM AVEDISIAN
HVAC-Rough 9/21/2023 Corrections Issued ARAM AVEDISIAN
PLUMBING-Rough 9/22/2023 Not Ready for Inspection ARAM AVEDISIAN
ELECTRICAL-Rough 9/26/2023 Approved ARAM AVEDISIAN
PLUMBING-Rough 9/26/2023 Approved ARAM AVEDISIAN
HVAC-Rough 10/6/2023 Corrections Issued ARAM AVEDISIAN
BUILDING-Rough-Frame 10/27/2023 Conditional Approval ARAM AVEDISIAN
Green Building Rough 10/27/2023 Not Ready for Inspection ARAM AVEDISIAN
HVAC-Rough 10/27/2023 Conditional Approval ARAM AVEDISIAN
Verify Sprinkler Sign Off 10/27/2023 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 11/15/2023 Approved KEVIN SARGSYAN
Green Building Rough 11/15/2023 Approved KEVIN SARGSYAN
HVAC-Rough 11/15/2023 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 11/15/2023 Partial Approval KEVIN SARGSYAN
Shower Pan 11/15/2023 Approved KEVIN SARGSYAN
Insulation 11/27/2023 Not Ready for Inspection KEVIN SARGSYAN
Insulation 11/30/2023 Approved CARLOS MATAMOROS
Interior/Exterior Lathing 12/6/2023 Approved KEVIN SARGSYAN
Drywall Nailing 12/7/2023 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 12/18/2023 Approved HERBERT GIRON
Deputy Steel/Welding 3/7/2024 Conditional Approval HERBERT GIRON
Deputy Steel/Welding 3/19/2024 Conditional Approval HERBERT GIRON
Deputy Steel/Welding 3/21/2024 Conditional Approval HERBERT GIRON
BUILDING-Rough-Frame 10/31/2024 Corrections Issued EVAN COOPER
Pre-Inspection 11/5/2024 Partial Inspection KEVIN SARGSYAN
PLUMBING-Rough 12/13/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Final 2/26/2025 Corrections Issued JESUS RODRIGUEZ
ELECTRICAL-Final 3/3/2025 Partial Approval JESUS RODRIGUEZ
Gas Test 3/18/2025 Approved KEVIN SARGSYAN
PLUMBING-Final 3/18/2025 Corrections Issued KEVIN SARGSYAN
HVAC-Final 3/20/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 4/7/2025 Approved KEVIN SARGSYAN
ELECTRICAL-Final 4/9/2025 Approved KEVIN SARGSYAN
Service/Power Release 4/9/2025 Approved KEVIN SARGSYAN
HVAC-Final 4/30/2025 Approved MEL KHACHATOURIAN
Final 5/15/2025 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 5/15/2025 Approved KEVIN SARGSYAN
Green Building Final 5/15/2025 Approved KEVIN SARGSYAN
Reinforced Concrete Frame 5/15/2025 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/15/2025 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 5/15/2025 Approved KEVIN SARGSYAN
Structural Steel Frame 5/15/2025 Approved KEVIN SARGSYAN