18010 W KAREN DR 91316

Certificate Information: 18010 W KAREN DR 91316

Application / Permit
20010-20000-02771
Plan Check / Job No.
B20VN10511
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
(N) 40' X 20' ONE STORY ACCESSORY DWELLING UNIT PER GCS 65852.2(e)(1)(B) and LAMC 12.22 A.33(c)1, (d)1, and (g) ALL WORK PER ENGINEERING NFPA 13D REQUIRED THROUGHOUT “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the issuance of the Certificate of Occupancy.”
Permit Issued
Issued on 8/11/2022
Issuing Office
Valley
Current Status
Issued on 8/11/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/13/2020 APPLICANT
Assigned to Plan Check Engineer 9/3/2020 SEWADA ZADOORIAN MILAGARDI
Plans on Hold 9/14/2020 SEWADA ZADOORIAN MILAGARDI
Hold Released 9/21/2020 SEWADA ZADOORIAN MILAGARDI
Corrections Issued 9/21/2020 SEWADA ZADOORIAN MILAGARDI
Quality Review Completed 10/1/2020 OMID HEDAYAT
Building Plans Picked Up 10/6/2020 APPLICANT
Applicant returned to address corrections 6/14/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 7/14/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 10/27/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 11/8/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 2/8/2022 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 6/29/2022 SEWADA ZADOORIAN MILAGARDI
Plan Check Approved 8/3/2022 SEWADA ZADOORAN MILAGARDI
Issued 8/11/2022 APPLICANT

Permit Application Clearance Information

Hydrant and Access approval Cleared 12/9/2020 MATTHEW CRAIG
Address approval Cleared 1/5/2021 MARKOS PEREZ-BRAN
Certificate of Compliance Cleared 4/8/2021 RUBEN VASQUEZ
Miscellaneous Cleared 4/13/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 2/3/2022 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 2/3/2022 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 2/3/2022 LEE GUILBEAUX
Street Frontage Cleared 2/3/2022 LEE GUILBEAUX
Sewer availability Cleared 2/7/2022 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 3/17/2022 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 6/17/2022 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 6/29/2022 LEE GUILBEAUX
GPI Written Notices Cleared 6/29/2022 SEWADA ZADOORAN MILAGARDI
Grading Pre-Inspection Cleared 6/29/2022 SEWADA ZADOORAN MILAGARDI

Contact Information

Architect Motamen,, Azita; Lic. No.: C28112 16614 OAKVIEW COURT      ENCINO, CA 91436
Contractor American Goal Construction Inc; Lic. No.: 632978-B 18375 VENTRUA BLVD #26      TARZANA, CA 91356
Engineer Cohanfard,, Albert; Lic. No.: C45408 910 S BEDFORD ST 304      LOS ANGELES, CA 90035
Engineer Jahani,, Fereidoun; Lic. No.: C62875 3720 BLANCHE ST      PASADENA, CA 91107
Engineer Minas,, Caro Jolfaie; Lic. No.: GE601 4742 SAN FERNANDO RD      GLENDALE, CA 91204
Geologist Minas,, Shant; Lic. No.: EG2607 566 RIVERDALE DRIVE      GLENDALE, CA 91204

Inspector Information

JOHN KIDWELL, (818) 774-4314 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/6/2023 Corrections Issued DAVID SANDOVAL
Footing/Foundation/Slab 3/14/2023 Not Ready for Inspection DAVID SANDOVAL
Footing/Foundation/Slab 5/8/2023 Corrections Issued SEAN HAUPT
Piling/Pier/Caisson 5/10/2023 Approved VINCENT HANLEY
Footing/Foundation/Slab 6/23/2023 Partial Approval SEAN HAUPT
Footing/Foundation/Slab 7/24/2023 Partial Approval SEAN HAUPT
Masonry Wall/Backfill 9/11/2023 Partial Approval SEAN HAUPT
Excavation/Setback/Form/Re-Bar 1/8/2024 Approved SEAN HAUPT
Footing/Foundation/Slab 1/8/2024 Approved SEAN HAUPT
BUILDING-Rough-Frame 2/8/2024 Not Ready for Inspection SEAN HAUPT
Floor/Roof Diaphrgm/Shear Wall 2/8/2024 Approved SEAN HAUPT
Verify Sprinkler Sign Off 2/8/2024 Not Ready for Inspection SEAN HAUPT
Interior/Exterior Lathing 5/20/2024 Partial Approval JOHN KIDWELL
ELECTRICAL-Rough 9/30/2024 Partial Approval JOHN KIDWELL
HVAC-Rough 10/29/2024 Approved JOHN KIDWELL
Insulation 12/20/2024 Corrections Issued JOHN KIDWELL
Insulation 1/2/2025 Not Ready for Inspection JOHN KIDWELL
BUILDING-Rough-Frame 1/28/2025 Approved JOHN KIDWELL
Green Building Rough 1/28/2025 Approved JOHN KIDWELL
Insulation 1/28/2025 Approved JOHN KIDWELL
Verify Sprinkler Sign Off 1/28/2025 Approved JOHN KIDWELL
Drywall Nailing 1/30/2025 Approved JOHN KIDWELL
HVAC-Final 7/17/2025 Approved JOHN KIDWELL
ELECTRICAL-Final 10/16/2025 Approved JOHN KIDWELL
Final 10/16/2025 Not Ready for Inspection JOHN KIDWELL
Green Building Final 10/16/2025 Not Ready for Inspection JOHN KIDWELL
Reinforced Concrete Frame 10/16/2025 Approved JOHN KIDWELL
SGSOV-Seismic Gas S/O Valve 10/16/2025 SGSOV Approved JOHN KIDWELL
Service/Power Release 10/16/2025 Approved JOHN KIDWELL
Smoke Detectors 10/16/2025 Approved JOHN KIDWELL
Final 11/20/2025 Corrections Issued JOHN KIDWELL
Green Building Final 11/20/2025 Approved JOHN KIDWELL
Pre-Inspection 11/20/2025 Partial Inspection JOHN KIDWELL
Final 6/30/2026 Partial Approval JOHN KIDWELL