11227 W SUNSHINE TER 91604

Certificate Information: 11227 W SUNSHINE TER 91604

Application / Permit
20010-20000-01983
Plan Check / Job No.
B20VN07868
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW (24'-0"x 21'-0") IRREGULAR SHAPED TWO STORY DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d) , NFPA-13D FIRE SPRINKLERS REQUIRED THROUGHOUT, ALL WORK PER ENGINEERING.
Permit Issued
Issued on 11/2/2020
Issuing Office
Current Status
CofO Issued on 1/20/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/11/2020 APPLICANT
Assigned to Plan Check Engineer 7/9/2020 TROY DEGUZMAN
Corrections Issued 7/13/2020 TROY DEGUZMAN
Quality Review Completed 7/13/2020 CHON CHIO KUO
Building Plans Picked Up 7/13/2020 APPLICANT
Applicant returned to address corrections 9/8/2020 TROY DEGUZMAN
Applicant returned to address corrections 9/24/2020 TROY DEGUZMAN
Plan Check Approved 10/29/2020 TROY DEGUZMAN
Issued 11/2/2020 APPLICANT
CofO in Progress 12/22/2021 ARAM AVEDISIAN
Permit Finaled 1/20/2022 MICHAEL SMITH
CofO Issued 1/20/2022 MICHAEL SMITH
Permit Finaled 1/20/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 7/15/2020 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 7/15/2020 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 7/15/2020 LEE GUILBEAUX
Street Frontage Cleared 7/15/2020 LEE GUILBEAUX
Construction near power lines Cleared 7/28/2020 WALTER RAMIREZ
Distance to fire station Cleared 8/25/2020 MATTHEW CRAIG
Hydrant and Access approval Cleared 8/25/2020 MATTHEW CRAIG
GPI Written Notices Cleared 9/8/2020 TROY DEGUZMAN
Grading Pre-Inspection Cleared 9/8/2020 TROY DEGUZMAN
Green Code Cleared 9/8/2020 TROY DEGUZMAN
Eng Process Fee Ord 176,300 Cleared 9/28/2020 LEE GUILBEAUX
Sewer availability Cleared 9/28/2020 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 10/8/2020 LEE GUILBEAUX
Low Impact Development Cleared 10/28/2020 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 11/2/2020 ADRIAN CASTRO

Contact Information

Architect Maio,, Miguel J; Lic. No.: C27923 13938 ADDISON STREET      SHERMAN OAKS, CA 91423
Contractor Perfitt John; Lic. No.: 1034808-B 180 SOUTH CITRUS      LOS ANGELES, CA 90036
Engineer Mercado,, Lizandro; Lic. No.: S4331 25583 AVENUE STANFORD      VALENCIA, CA 91355

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 12/17/2020 No Access for Inspection ARAM AVEDISIAN
Excavation/Setback/Form/Re-Bar 12/21/2020 Corrections Issued ARAM AVEDISIAN
Masonry Wall/Backfill 1/22/2021 Partial Approval ARAM AVEDISIAN
Reinforced Masonry Frame 2/4/2021 Corrections Issued THOMAS FINNILA
Reinforced Masonry Frame 2/11/2021 Approved ARAM AVEDISIAN
Footing/Foundation/Slab 3/11/2021 Corrections Issued JOHN HAYES
Underground Mechanical 3/16/2021 Partial Approval ARAM AVEDISIAN
Excavation/Setback/Form/Re-Bar 3/26/2021 Approved ARAM AVEDISIAN
Wood Frame 4/28/2021 Partial Approval ARAM AVEDISIAN
BUILDING-Rough-Frame 5/17/2021 No Access for Inspection JOHN HAYES
Floor/Roof Diaphrgm/Shear Wall 5/17/2021 Not Ready for Inspection JOHN HAYES
Green Building Rough 5/17/2021 No Access for Inspection JOHN HAYES
Verify Sprinkler Sign Off 5/17/2021 No Access for Inspection JOHN HAYES
Wood Frame 5/17/2021 Not Ready for Inspection JOHN HAYES
Floor/Roof Diaphrgm/Shear Wall 5/25/2021 Partial Approval ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 5/28/2021 No Access for Inspection MICHAEL TEMPLE
Pre-Inspection 6/7/2021 Partial Approval ARAM AVEDISIAN
ELECTRICAL-Rough 6/17/2021 Approved ARAM AVEDISIAN
PLUMBING-Rough 7/7/2021 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 7/30/2021 Corrections Issued ARAM AVEDISIAN
HVAC-Rough 8/9/2021 Not Ready for Inspection CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 8/9/2021 Conditional Approval CHRISTOPHER DELLEFIELD
HVAC-Rough 8/12/2021 Corrections Issued ARAM AVEDISIAN
Special/Order Compliance 8/12/2021 Corrections Issued ARAM AVEDISIAN
BUILDING-Rough-Frame 8/19/2021 Conditional Approval ARAM AVEDISIAN
HVAC-Rough 8/19/2021 Approved ARAM AVEDISIAN
PLUMBING-Rough 8/19/2021 Approved ARAM AVEDISIAN
Insulation 8/26/2021 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 8/27/2021 Approved ARAM AVEDISIAN
Green Building Rough 8/27/2021 Approved ARAM AVEDISIAN
Insulation 8/27/2021 Approved ARAM AVEDISIAN
Verify Sprinkler Sign Off 8/27/2021 Approved ARAM AVEDISIAN
Shower Pan 8/30/2021 Approved LILIANA PORTILLO
Interior/Exterior Lathing 9/1/2021 Approved LILIANA PORTILLO
Drywall Nailing 9/3/2021 Partial Approval LILIANA PORTILLO
Drywall Nailing 9/8/2021 Approved LILIANA PORTILLO
ELECTRICAL-Final 10/20/2021 Corrections Issued ARAM AVEDISIAN
ELECTRICAL-Final 11/1/2021 Approved ARAM AVEDISIAN
Final 11/16/2021 Corrections Issued ARAM AVEDISIAN
Footing/Foundation/Slab 11/16/2021 Approved ARAM AVEDISIAN
Smoke Detectors 11/16/2021 Approved ARAM AVEDISIAN
Final 11/22/2021 Not Ready for Inspection MATT KELLERMAN
Green Building Final 11/22/2021 Approved MATT KELLERMAN
SGSOV-Seismic Gas S/O Valve 11/22/2021 SGSOV Approved MATT KELLERMAN
Service/Power Release 11/22/2021 Approved MATT KELLERMAN
Final 12/2/2021 Corrections Issued ARAM AVEDISIAN
Final 12/22/2021 OK to Issue CofO ARAM AVEDISIAN