409 N ALTA VISTA BLVD 90036

Certificate Information: 409 N ALTA VISTA BLVD 90036

Application / Permit
20010-20000-01611
Plan Check / Job No.
B20VN06591
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 38' x 87'-7" TWO STORY SINGLE FAMILY DWELLING WITH ATTACHED JADU [PER CA Govt. Code 65852.2(e)(1)(A) and 65852.229] & 2-CAR GARAGE; AUTOMATIC SPRINKLER SYSTEM IS REQUIRED
Permit Issued
Issued on 6/30/2025
Issuing Office
Valley
Current Status
Issued on 6/30/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/13/2020 APPLICANT
Assigned to Plan Check Engineer 6/11/2020 SEAN SHAHMIRI
Corrections Issued 6/15/2020 SEAN SHAHMIRI
Quality Review Completed 6/19/2020 OMID HEDAYAT
Building Plans Picked Up 6/26/2020 APPLICANT
Green Plans Picked Up 6/26/2020 APPLICANT
Applicant returned to address corrections 3/15/2021 SEAN SHAHMIRI
Applicant returned to address corrections 7/9/2021 SEAN SHAHMIRI
Plan Check Approved 9/21/2021 SEAN SHAHMIRI
No Progress 1/30/2024 SEAN SHAHMIRI
Plan Check Approved 6/30/2025 SEAN SHAHMIRI
Issued 6/30/2025 APPLICANT

Permit Application Clearance Information

Low Impact Development Cleared 6/26/2020 MARTIN FRAGOSO
Trees in Parkway Cleared 7/16/2020 JOHN KIM
Hydrant and Access approval Cleared 7/29/2020 KURT CORRAL
Permit Cleared 9/17/2020 CECILIO NAVARRO
Eng Process Fee Ord 176,300 Cleared 9/18/2020 CECILIO NAVARRO
Address approval Cleared 9/22/2020 CECILIO NAVARRO
Roof/Waste drainage to street Cleared 9/22/2020 CECILIO NAVARRO
Sewer availability Cleared 11/16/2020 CECILIO NAVARRO
SB8 RUD Cleared 6/17/2025 KENNETH LE

Contact Information

Contractor Owner-Builder       ,
Engineer Adams,, Robert Charles; Lic. No.: C21234 22129 BRYANT STREET      CANOGA PARK, CA 91304

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Service/Power Release 7/23/2026    Time Frame: 9-11
PLUMBING-Final 7/23/2026    Time Frame: 9-11
HVAC-Final 7/23/2026    Time Frame: 9-11
ELECTRICAL-Final 7/23/2026    Time Frame: 9-11

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/14/2025 Partial Approval JOSE MACIAS
Pre-Inspection 8/14/2025 Not Ready for Inspection JOSE MACIAS
Deputy Drilled-In Anchors 8/21/2025 Conditional Approval RONNIE MEDINA
Excavation/Setback/Form/Re-Bar 8/26/2025 Partial Inspection RONNIE MINDANAO
Footing/Foundation/Slab 8/26/2025 Partial Approval RONNIE MINDANAO
METHANE-Barrier 8/26/2025 Approved RONNIE MINDANAO
METHANE-Subgrade 8/26/2025 Approved RONNIE MINDANAO
Deputy Reinf. Concrete 8/27/2025 Conditional Approval JEFFREY MEAD
BUILDING-Rough-Frame 9/10/2025 Corrections Issued BRENDAN MORELLI
PLUMBING-Rough 9/10/2025 Partial Approval BRENDAN MORELLI
Insulation 9/12/2025 Approved JOSE MACIAS
Pre-Inspection 9/16/2025 Corrections Issued JOSE MACIAS
Floor/Roof Diaphrgm/Shear Wall 11/6/2025 Corrections Issued JOSH MEISTER
HVAC-Rough 11/6/2025 Approved JOSH MEISTER
BUILDING-Rough-Frame 11/26/2025 Not Ready for Inspection JOSH MEISTER
ELECTRICAL-Rough 11/26/2025 Approved JOSH MEISTER
Green Building Rough 11/26/2025 Not Ready for Inspection JOSH MEISTER
METHANE-Rough 11/26/2025 Approved JOSH MEISTER
PLUMBING-Rough 11/26/2025 Approved JOSH MEISTER
Verify Sprinkler Sign Off 11/26/2025 Not Ready for Inspection JOSH MEISTER
BUILDING-Rough-Frame 12/2/2025 Not Ready for Inspection JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 12/2/2025 Not Ready for Inspection JOSH MEISTER
Gas Test 12/2/2025 Not Ready for Inspection JOSH MEISTER
Green Building Rough 12/2/2025 Not Ready for Inspection JOSH MEISTER
Shower Pan 12/2/2025 Not Ready for Inspection JOSH MEISTER
Verify Sprinkler Sign Off 12/2/2025 Not Ready for Inspection JOSH MEISTER
BUILDING-Rough-Frame 12/5/2025 Approved JOSH MEISTER
Floor/Roof Diaphrgm/Shear Wall 12/5/2025 Conditional Approval JOSH MEISTER
Green Building Rough 12/5/2025 Approved JOSH MEISTER
Shower Pan 12/5/2025 Approved JOSH MEISTER
Verify Sprinkler Sign Off 12/5/2025 Approved JOSH MEISTER
Special/Order Compliance 12/17/2025 Partial Inspection JOSH MEISTER
Insulation 12/22/2025 Not Ready for Inspection JOSH MEISTER
Insulation 12/26/2025 Approved ALEX COLIN
Drywall Nailing 1/9/2026 Approved JOSH MEISTER
Interior/Exterior Lathing 1/9/2026 Approved JOSH MEISTER
ELECTRICAL-Final 6/17/2026 Not Ready for Inspection JOSH MEISTER
HVAC-Final 6/17/2026 Not Ready for Inspection JOSH MEISTER
PLUMBING-Final 6/17/2026 Not Ready for Inspection JOSH MEISTER
Sewer 6/17/2026 Not Ready for Inspection JOSH MEISTER
ELECTRICAL-Final 7/8/2026 Not Ready for Inspection JOSH MEISTER
Footing/Foundation/Slab 7/8/2026 Approved JOSH MEISTER
Green Building Final 7/8/2026 Not Ready for Inspection JOSH MEISTER
HVAC-Final 7/8/2026 Not Ready for Inspection JOSH MEISTER
PLUMBING-Final 7/8/2026 Not Ready for Inspection JOSH MEISTER
Pre-Inspection 7/8/2026 Approved JOSH MEISTER
SGSOV-Seismic Gas S/O Valve 7/8/2026 SGSOV Not Ready JOSH MEISTER
Service/Power Release 7/8/2026 Not Ready for Inspection JOSH MEISTER
Smoke Detectors 7/8/2026 Not Ready for Inspection JOSH MEISTER
Final 7/22/2026 Corrections Issued JOSH MEISTER
Green Building Final 7/22/2026 Corrections Issued JOSH MEISTER
SGSOV-Seismic Gas S/O Valve 7/22/2026 SGSOV Not Ready JOSH MEISTER
Service/Power Release 7/22/2026 Not Ready for Inspection JOSH MEISTER
Smoke Detectors 7/22/2026 Approved JOSH MEISTER