3676 N CROWNRIDGE DR 91403

Certificate Information: 3676 N CROWNRIDGE DR 91403

Application / Permit
20010-20000-00852
Plan Check / Job No.
B20VN04387
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 116' X 64'6" 2-STORY SFD WITH ATTACHED THREE CAR GARAGE AND WITH 30' X 17'6" IRREGULAR SHAPED PATIO COVER AND WITH 69'6" X 41'6" IRREGULAR SHAPED BASEMENT , NFPA-13D FIRE SPRINKLERS REQUIRED THROUGHOUT, ALL WORK PER ENGINEERING - SEE COMMENTS
Permit Issued
Issued on 2/9/2021
Issuing Office
Current Status
CofO Issued on 5/17/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/11/2020 APPLICANT
Green Plans Picked Up 3/25/2020 APPLICANT
Assigned to Plan Check Engineer 4/2/2020 RARES BODEA
Corrections Issued 4/9/2020 RARES BODEA
Quality Review Completed 4/13/2020 OMID HEDAYAT
Building Plans Picked Up 4/14/2020 APPLICANT
Applicant returned to address corrections 11/5/2020 RARES BODEA
Applicant returned to address corrections 12/17/2020 RARES BODEA
Plan Check Approved 2/9/2021 RARES BODEA
Issued 2/9/2021 APPLICANT
CofO in Progress 5/16/2023 VINCENT HANLEY
Permit Finaled 5/17/2023 JOHN JANSON
CofO Issued 5/17/2023 JOHN JANSON
Permit Finaled 5/17/2023 JOHN JANSON

Permit Application Clearance Information

Address approval Cleared 4/29/2020 GABRIEL ROBLES
BHO/Hillside ordinance Cleared 4/29/2020 GABRIEL ROBLES
BHO/Hillside ordinance Cleared 4/29/2020 GABRIEL ROBLES
BHO/Hillside ordinance Cleared 4/29/2020 GABRIEL ROBLES
Permit Cleared 4/30/2020 GABRIEL ROBLES
Distance to fire station Cleared 5/4/2020 JOHN CONNEALLY
Trees in Parkway Cleared 5/6/2020 JOHN KIM
Hydrant and Access approval Cleared 5/7/2020 KURT CORRAL
BHO/Hillside ordinance Cleared 5/18/2020 ADRIAN CASTRO
BHO/Hillside ordinance Cleared 6/10/2020 ADRIAN CASTRO
Eng Process Fee Ord 176,300 Cleared 6/10/2020 ADRIAN CASTRO
Sewer availability Cleared 6/10/2020 ADRIAN CASTRO
Green Code Cleared 6/12/2020 MICHAEL AYERS
Low Impact Development Cleared 8/18/2020 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 8/19/2020 ADRIAN CASTRO
GPI Written Notices Cleared 12/17/2020 RARES BODEA
Grading Pre-Inspection Cleared 12/17/2020 RARES BODEA
Excavation more than 5-ft deep Cleared 1/23/2021 CALOSHA APPROVED

Contact Information

Contractor Owner-Builder       ,
Engineer Montemayor,, G F; Lic. No.: C25258 1617 S WAVERLY GLEN WAY      HACIENDA HEIGHTS, CA 91745
Engineer Vidal,, Juan Alonso; Lic. No.: GE861 7438 SHIRLEY AVE      RESEDA, CA 91335
Engineer Yuzon,, Benigno S; Lic. No.: S3454 25531 PRADO DELAS BELLOTAS      CALABASAS, CA 91302
Geologist Kruger,, Mark Otto; Lic. No.: EG2345 10120 NATIONAL BLVD      LOS ANGELES, CA 90034

Inspector Information

THOMAS FINNILA, (818) 774-4324 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/14/2021 Partial Approval RONALD COWAN
Underground Mechanical 5/14/2021 Partial Approval RONALD COWAN
Excavation/Setback/Form/Re-Bar 6/4/2021 Partial Approval RONALD COWAN
Footing/Foundation/Slab 6/4/2021 Partial Approval RONALD COWAN
Reinforced Concrete Frame 7/6/2021 Partial Approval RONALD COWAN
Deputy Steel/Welding 7/26/2021 Approved RONALD COWAN
Excavation/Setback/Form/Re-Bar 9/15/2021 Partial Approval RONALD COWAN
Piling/Pier/Caisson 9/15/2021 Partial Approval RONALD COWAN
Deputy Reinf. Concrete 9/16/2021 Approved RONALD COWAN
Deputy Reinf. Concrete 9/17/2021 Approved RONALD COWAN
Underground Mechanical 10/1/2021 Approved RONALD COWAN
Footing/Foundation/Slab 10/20/2021 Partial Approval RONALD COWAN
Deputy Reinf. Concrete 10/22/2021 Approved RONALD COWAN
Footing/Foundation/Slab 10/29/2021 Approved PETER FOLLING
Deputy Steel/Welding 11/22/2021 Conditional Approval ROBERT GOLD
Floor/Roof Diaphrgm/Shear Wall 11/29/2021 Partial Approval ROBERT GOLD
Floor/Roof Diaphrgm/Shear Wall 1/4/2022 Partial Approval DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 2/8/2022 Partial Approval PETER FOLLING
Floor/Roof Diaphrgm/Shear Wall 3/11/2022 No Access for Inspection PETER FOLLING
PLUMBING-Rough 5/10/2022 Approved DAVID SANDOVAL
ELECTRICAL-Rough 5/16/2022 Approved DAVID SANDOVAL
HVAC-Rough 5/25/2022 Approved SEAN HAUPT
BUILDING-Rough-Frame 5/27/2022 Approved DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 5/27/2022 Approved DAVID SANDOVAL
Green Building Rough 5/27/2022 Not Ready for Inspection DAVID SANDOVAL
MERV13>=Rough 5/27/2022 Approved DAVID SANDOVAL
Verify Sprinkler Sign Off 5/27/2022 Approved DAVID SANDOVAL
Interior/Exterior Lathing 6/10/2022 Partial Approval PETER FOLLING
Drywall Nailing 6/14/2022 Not Ready for Inspection MORRIS JACKSON
Green Building Rough 6/14/2022 Not Ready for Inspection MORRIS JACKSON
Shower Pan 6/14/2022 Approved MORRIS JACKSON
Interior/Exterior Lathing 6/20/2022 Approved MICHAEL PELHAM
BUILDING-Rough-Frame 6/23/2022 Corrections Issued VINCENT HANLEY
Drywall Nailing 6/23/2022 Approved VINCENT HANLEY
Green Building Rough 6/23/2022 Approved VINCENT HANLEY
HVAC-Final 3/10/2023 Approved VINCENT HANLEY
PLUMBING-Final 3/10/2023 Approved VINCENT HANLEY
ELECTRICAL-Final 3/20/2023 Approved VINCENT HANLEY
BUILDING-Rough-Frame 4/7/2023 Approved VINCENT HANLEY
Final 4/7/2023 Corrections Issued VINCENT HANLEY
Green Building Final 4/7/2023 Approved VINCENT HANLEY
MERV13>=Final 4/7/2023 Approved VINCENT HANLEY
SGSOV-Seismic Gas S/O Valve 4/7/2023 SGSOV Approved VINCENT HANLEY
Service/Power Release 4/7/2023 Approved VINCENT HANLEY
Smoke Detectors 4/7/2023 Approved VINCENT HANLEY
Final 5/16/2023 OK to Issue CofO VINCENT HANLEY