615-615 1/2 W 41ST PL 90037

Certificate Information: 615-615 1/2 W 41ST PL 90037

Application / Permit
20010-20000-00490
Plan Check / Job No.
B20VN02636
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
PROPOSE 32'X45' THREE STORY DUPLEX WITH ONE CAR ATTACHED GARAGE AND 3 OPEN PARKING STALL _ BUILDING SHALL BE FULLY SPRINKLER THROUGH OUT WITH NFPA 13D.
Permit Issued
Issued on 1/28/2021
Issuing Office
Current Status
CofO Issued on 1/13/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/14/2020 APPLICANT
Assigned to Plan Check Engineer 3/5/2020 DAWN MC NULTY
Corrections Issued 3/9/2020 DAWN MC NULTY
Quality Review Completed 3/11/2020 CHON CHIO KUO
Building Plans Picked Up 3/16/2020 APPLICANT
Green Plans Picked Up 3/16/2020 APPLICANT
Plan Check Approved 12/26/2020 DAWN MC NULTY
Issued 1/28/2021 APPLICANT
CofO in Progress 1/11/2022 HORACE FULTZ
Permit Finaled 1/13/2022 DEROLD HAUFF
CofO Issued 1/13/2022 DEROLD HAUFF
Permit Finaled 1/13/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 4/29/2020 CELINA MORENO
Highway dedication Cleared 4/29/2020 CELINA MORENO
Permit Cleared 4/29/2020 CELINA MORENO
Eng Process Fee Ord 176,300 Cleared 5/5/2020 CELINA MORENO
Sewer availability Cleared 5/5/2020 CELINA MORENO
CPC Cleared 5/14/2020 KENTON TRINH
CPC Cleared 5/14/2020 KENTON TRINH
ZI Cleared 5/14/2020 KENTON TRINH
Green Code Cleared 6/4/2020 MICHAEL AYERS
Hydrant and Access approval Cleared 6/16/2020 KURT CORRAL
Frnt yard landscape/Water mgmt Cleared 8/26/2020 RUBEN VASQUEZ
Trees in Parkway Cleared 9/9/2020 JOHN KIM
Low Impact Development Cleared 9/24/2020 MITESH PATEL
Roof/Waste drainage to street Cleared 10/2/2020 CELINA MORENO

Contact Information

Contractor Top Builders; Lic. No.: 1064383-B 6125 WASHINGTON BLVD #300      CULVER CITY, CA 90232
Engineer Dorta,, Michael Rohrs; Lic. No.: C72538 2445 VIA SONOMA      PALOS VERDES ESTATES, CA 90274

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 3/8/2021 Not Ready for Inspection FREDDIE RIVERA
PLUMBING-Rough 3/8/2021 Partial Approval FREDDIE RIVERA
Excavation/Setback/Form/Re-Bar 3/16/2021 Approved ROBERT MCDOWELL
Floor/Roof Diaphrgm/Shear Wall 4/13/2021 Partial Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 5/26/2021 Approved ROBERT MCDOWELL
ELECTRICAL-Rough 6/15/2021 Approved JOAQUIN GREENOUGH
HVAC-Rough 6/15/2021 Approved JOAQUIN GREENOUGH
PLUMBING-Rough 6/15/2021 Not Ready for Inspection JOAQUIN GREENOUGH
Verify Sprinkler Sign Off 6/15/2021 Approved JOAQUIN GREENOUGH
Wood Frame 6/15/2021 Corrections Issued JOAQUIN GREENOUGH
BUILDING-Rough-Frame 7/6/2021 Approved FREDDIE RIVERA
Green Building Rough 7/6/2021 Approved FREDDIE RIVERA
PLUMBING-Rough 7/6/2021 Approved FREDDIE RIVERA
Pre-Inspection 7/6/2021 Corrections Issued FREDDIE RIVERA
Insulation 7/12/2021 Approved JESUS PINEDA
Drywall Nailing 7/26/2021 Approved FREDDIE RIVERA
Interior/Exterior Lathing 7/26/2021 Approved FREDDIE RIVERA
Pre-Inspection 7/26/2021 Corrections Issued FREDDIE RIVERA
Final 11/24/2021 Not Ready for Inspection SABAS ALONSO
Footing/Foundation/Slab 11/24/2021 Approved SABAS ALONSO
Green Building Final 11/24/2021 Not Ready for Inspection SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 11/24/2021 SGSOV Approved SABAS ALONSO
Service/Power Release 11/24/2021 Not Ready for Inspection SABAS ALONSO
Smoke Detectors 11/24/2021 Approved SABAS ALONSO
Final 12/23/2021 Corrections Issued SABAS ALONSO
Green Building Final 12/23/2021 Approved SABAS ALONSO
Service/Power Release 12/23/2021 Not Required SABAS ALONSO
Final 1/11/2022 OK to Issue CofO HORACE FULTZ