360 N FULLER AVE 90036
Certificate Information: 360 N FULLER AVE 90036
- Application / Permit
- 20010-20000-00307
- Plan Check / Job No.
- B20VN01500
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- NEW 2-STORY SINGLE FAMILY DWELLING WITH BASEMENT - BUILDING TO BE FULLY EQUIPED WITH NFPA 13D SPRINKLER SYS.
- Permit Issued
- Issued on 11/3/2021
- Issuing Office
- Current Status
- CofO Issued on 3/28/2026
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 1/29/2020 | APPLICANT |
| Assigned to Plan Check Engineer | 3/5/2020 | AMIR DANAI |
| Corrections Issued | 3/12/2020 | AMIR DANAI |
| Quality Review Completed | 3/25/2020 | ARMEN JIVALAGIAN |
| Building Plans Picked Up | 4/9/2020 | APPLICANT |
| Green Plans Picked Up | 4/27/2020 | APPLICANT |
| Applicant returned to address corrections | 11/19/2020 | AMIR DANAI |
| Plan Check Approved | 12/8/2020 | AMIR DANAI |
| No Progress | 6/15/2021 | MONICA RAMIREZ |
| Plan Check Approved | 10/28/2021 | MONICA RAMIREZ |
| Issued | 11/3/2021 | APPLICANT |
| CofO in Progress | 3/27/2026 | JOSH MEISTER |
| Permit Finaled | 3/28/2026 | DEROLD HAUFF |
| CofO Issued | 3/28/2026 | DEROLD HAUFF |
| Permit Finaled | 3/28/2026 | DEROLD HAUFF |
Permit Application Clearance Information
| Construction near power lines | Cleared | 4/28/2020 | WALTER RAMIREZ |
| Abandoned oil well | Cleared | 6/3/2020 | KURT CORRAL |
| Abandoned oil well approval | Cleared | 6/3/2020 | KURT CORRAL |
| Hydrant and Access approval | Cleared | 6/3/2020 | KURT CORRAL |
| Address approval | Cleared | 6/23/2020 | CELINA MORENO |
| Roof/Waste drainage to street | Cleared | 7/9/2020 | EMIL KYUPELYAN |
| Sewer availability | Cleared | 8/13/2020 | CELINA MORENO |
| Eng Process Fee Ord 176,300 | Cleared | 9/14/2020 | CELINA MORENO |
| Low Impact Development | Cleared | 10/6/2020 | SARAH YOUSSEF |
| Green Code | Cleared | 10/22/2020 | MICHAEL AYERS |
| Excavation more than 5-ft deep | Cleared | 12/8/2020 | CALOSHA APPROVED |
Contact Information
| Contractor | Aspen Construction And Development Inc; Lic. No.: 827956-B | P O BOX 48146 LOS ANGELES, CA 900480146 |
| Engineer | Jahani,, Fereidoun; Lic. No.: C62875 | 3720 BLANCHE ST PASADENA, CA 91107 |
| Engineer | Mansuri,, Mehran; Lic. No.: C78614 | 14944 HESBY ST SHERMAN OAKS, CA 91403 |
| Engineer | Minas,, Caro Jolfaie; Lic. No.: GE601 | 4742 SAN FERNANDO RD GLENDALE, CA 91204 |
| Engineer | Zhong,, Raymond Meng; Lic. No.: M27635 | 2416 W VALLEY BLVD ALHAMBRA, CA 91803 |
| Geologist | Minas,, Shant; Lic. No.: GEO8859 | 566 RIVERDALE DRIVE GLENDALE, CA 91204 |
Inspector Information
| JOSE MACIAS, (213) 202-3125 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Reinf. Concrete | 12/3/2021 | Conditional Approval | CHRIS CHRISTENSEN |
| Excavation/Setback/Form/Re-Bar | 1/11/2022 | Partial Approval | CHRIS CHRISTENSEN |
| Rough-Elec/Plmb/HVAC | 1/14/2022 | Partial Approval | CHRIS CHRISTENSEN |
| PLUMBING-Rough | 1/18/2022 | Partial Approval | CHRIS CHRISTENSEN |
| Excavation/Setback/Form/Re-Bar | 2/15/2022 | Partial Approval | CHRIS CHRISTENSEN |
| Excavation/Setback/Form/Re-Bar | 2/16/2022 | Partial Approval | CHRIS CHRISTENSEN |
| Deputy Reinf. Concrete | 2/17/2022 | Conditional Approval | CHRIS CHRISTENSEN |
| Excavation/Setback/Form/Re-Bar | 3/3/2022 | Partial Approval | CHRIS CHRISTENSEN |
| Excavation/Setback/Form/Re-Bar | 3/15/2022 | Partial Approval | CRAIG DAVIS |
| Special/Order Compliance | 3/15/2022 | Approved | ALIZAH MAYAGOITIA |
| Excavation/Setback/Form/Re-Bar | 3/23/2022 | Not Ready for Inspection | CRAIG DAVIS |
| Floor/Roof Diaphrgm/Shear Wall | 4/5/2022 | Corrections Issued | ADAM ESCOTO |
| Green Building Rough | 4/5/2022 | Not Ready for Inspection | ADAM ESCOTO |
| METHANE-Rough | 4/5/2022 | Not Ready for Inspection | ADAM ESCOTO |
| Verify Sprinkler Sign Off | 4/5/2022 | Not Ready for Inspection | ADAM ESCOTO |
| Deputy Wood Construction | 4/7/2022 | Approved | ADAM ESCOTO |
| Floor/Roof Diaphrgm/Shear Wall | 4/7/2022 | Partial Approval | ADAM ESCOTO |
| Underground Mechanical | 4/7/2022 | Approved | ADAM ESCOTO |
| Deputy Drilled-In Anchors | 4/26/2022 | Conditional Approval | ADAM ESCOTO |
| BUILDING-Rough-Frame | 4/27/2022 | Partial Approval | ADAM ESCOTO |
| Green Building Rough | 4/27/2022 | Not Ready for Inspection | ADAM ESCOTO |
| METHANE-Rough | 4/27/2022 | Not Ready for Inspection | ADAM ESCOTO |
| Verify Sprinkler Sign Off | 4/27/2022 | Not Ready for Inspection | ADAM ESCOTO |
| Wood Frame | 4/27/2022 | Partial Approval | ADAM ESCOTO |
| Deputy Wood Construction | 5/13/2022 | Conditional Approval | ADAM ESCOTO |
| Floor/Roof Diaphrgm/Shear Wall | 5/25/2022 | Corrections Issued | JOSEPH MCGARRY |
| Floor/Roof Diaphrgm/Shear Wall | 6/3/2022 | Partial Approval | JOSEPH MCGARRY |
| Gas Test | 6/14/2022 | Not Ready for Inspection | JOSEPH MCGARRY |
| Gas Test | 6/21/2022 | Approved | ADAM ESCOTO |
| Underground Mechanical | 6/21/2022 | Approved | ADAM ESCOTO |
| Reinforced Concrete Frame | 7/28/2022 | Partial Approval | JOSEPH MCGARRY |
| ELECTRICAL-Rough | 8/4/2022 | Approved | JOSEPH MCGARRY |
| HVAC-Rough | 8/4/2022 | Partial Approval | JOSEPH MCGARRY |
| PLUMBING-Rough | 8/4/2022 | Approved | JOSEPH MCGARRY |
| Verify Sprinkler Sign Off | 8/4/2022 | Approved | JOSEPH MCGARRY |
| Shower Pan | 8/16/2022 | Approved | MICHAEL LEWIS |
| Wood Frame | 8/23/2022 | Approved | MICHAEL LEWIS |
| Insulation | 8/30/2022 | Approved | MICHAEL LEWIS |
| Interior/Exterior Lathing | 9/6/2022 | Approved | MICHAEL LEWIS |
| Interior/Exterior Lathing | 9/7/2022 | Partial Inspection | MICHAEL LEWIS |
| Drywall Nailing | 9/13/2022 | Approved | MICHAEL LEWIS |
| Green Building Rough | 9/13/2022 | Approved | MICHAEL LEWIS |
| Deputy Wood Construction | 9/22/2022 | Conditional Approval | MICHAEL LEWIS |
| Deputy Wood Construction | 10/3/2022 | Conditional Approval | MICHAEL LEWIS |
| Interior/Exterior Lathing | 1/18/2023 | Approved | MICHAEL LEWIS |
| Sewer | 9/1/2023 | Not Ready for Inspection | LILIANA PORTILLO |
| Sewer | 9/6/2023 | Not Ready for Inspection | LILIANA PORTILLO |
| PLUMBING-Rough | 3/27/2024 | Partial Inspection | AMIR NAZARIAN |
| ELECTRICAL-Final | 2/20/2025 | Corrections Issued | JOSE MACIAS |
| ELECTRICAL-Final | 8/18/2025 | Corrections Issued | ENRIQUE MIRELES |
| HVAC-Final | 8/18/2025 | Approved | ENRIQUE MIRELES |
| PLUMBING-Final | 8/18/2025 | Approved | ENRIQUE MIRELES |
| BUILDING-Rough-Frame | 2/27/2026 | Approved | JOSH MEISTER |
| Final | 2/27/2026 | Not Ready for Inspection | JOSH MEISTER |
| Footing/Foundation/Slab | 2/27/2026 | Approved | JOSH MEISTER |
| Green Building Final | 2/27/2026 | Not Ready for Inspection | JOSH MEISTER |
| METHANE-Barrier | 2/27/2026 | Approved | JOSH MEISTER |
| METHANE-Final | 2/27/2026 | Approved | JOSH MEISTER |
| METHANE-Rough | 2/27/2026 | Approved | JOSH MEISTER |
| METHANE-Subgrade | 2/27/2026 | Approved | JOSH MEISTER |
| SGSOV-Seismic Gas S/O Valve | 2/27/2026 | SGSOV Not Ready | JOSH MEISTER |
| Service/Power Release | 2/27/2026 | Not Ready for Inspection | JOSH MEISTER |
| Smoke Detectors | 2/27/2026 | Not Ready for Inspection | JOSH MEISTER |
| Final | 3/17/2026 | Not Ready for Inspection | JOSH MEISTER |
| Green Building Final | 3/17/2026 | Not Ready for Inspection | JOSH MEISTER |
| SGSOV-Seismic Gas S/O Valve | 3/17/2026 | SGSOV Not Ready | JOSH MEISTER |
| Service/Power Release | 3/17/2026 | Not Ready for Inspection | JOSH MEISTER |
| Smoke Detectors | 3/17/2026 | Not Ready for Inspection | JOSH MEISTER |
| Final | 3/25/2026 | OK to Issue CofO | JOSH MEISTER |
| Green Building Final | 3/25/2026 | Approved | JOSH MEISTER |
| SGSOV-Seismic Gas S/O Valve | 3/25/2026 | SGSOV Approved | JOSH MEISTER |
| Service/Power Release | 3/25/2026 | Approved | JOSH MEISTER |
| Smoke Detectors | 3/25/2026 | Approved | JOSH MEISTER |